# F117 Engine Performance Restoration Pre-Solicitation Notice

Canonical: https://sealedbidder.com/opportunities/fa812426rb009

- Solicitation number: FA8124-26-R-B009
- Notice type: Presolicitation
- Status: Closed. Deadline was April 22, 2026 at 1:00 PM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA8124 AFLCMC LPK (FA8124)
- NAICS: 336412 Aircraft Engine and Engine Parts Manufacturing
- Product or service code: J028 Maintenance, Repair and Rebuilding of Equipment: Engines, Turbines, and Components
- Small business size standard: 1,500 employees (13 CFR 121.201, NAICS 336412)
- Place of performance: Tinker AFB, Oklahoma
- County: Oklahoma County (FIPS 40109). https://sealedbidder.com/counties/oklahoma-county-ok-40109
- First posted: April 17, 2026
- Last posted: April 17, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/02b8349c4929434f94f0a09685264879/view

## Reading this notice

- Kind of notice: Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336412 (aircraft engine and engine parts manufacturing), means no more than 1,500 employees, counted with affiliates.
- What comes next: No solicitation was published under this number after the presolicitation of April 17, 2026. An agency sometimes issues the solicitation under a new number.

## Description

This notice of intent is not a request for competitive proposals. This pre-solicitation notice is a follow on to the pre-solicitation notice posted 8 Dec 25. The 15 day requirement to post the pre-solicitation notice has already been met with the original posting. This update only updates the expected period of performance for this requirement. All other information remains the same as originally posted. The Department of the Air Force intends to award a sole source contract to Pratt & Whitney under the authority of FAR 6.302-1, Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. This determination is based on a thorough assessment of the market and a comprehensive evaluation of Pratt & Whitney's unique capabilities to meet the critical requirements of the F117 Engine Performance Restoration (EPR) program.

Commercial FAR 12 Service

Firm Fixed Price (FFP) - 20 Year Indefinite Delivery Indefinite Quantity (IDIQ)

The purpose of this synopsis is to notify industry of the Air Forces&rsquo; intent to award the Engine Performance Restoration contract in support of the F117 engine. This effort includes sustaining engineering (recurring and nonrecurring), product improvement/modernization, supply chain management, and performance restoration (depot and field support) performed on the F117 engine through the repair of modules, which are each restored based on a light, medium, or heavy level of maintenance and the procurement of new or serviceable life limited parts which have a finite lifespan based on accumulated usage.

The engineering support activities include detailed design engineering, maintenance engineering, systems engineering support, technical analyses, drawing and source data maintenance/ updates flight safety analyses, reliability analyses, liaison engineering support, stress analyses, accident investigation, engineering feasibility studies, material deficiency report analysis, field problem investigation, and in-flight emergency response support.

The F117 supply chain management effort will require the administion of the supply chain management program. This includes supply chain management logistics, forecasting of parts, long lead-time parts procurement, reparable forecasting, cataloging, obsolescence issues, integration with the Oklahoma City Air Logistics Complex (OC-ALC) for depot/modular level repair/ overhaul support, delivery of serviceable assets to depots and approved repair stations, budget computations, what-if-computations, Time Compliance Technical Order (TCTO) kits supportability, and hosting meetings to support the F117 program office with supply chain management logistics and Government requests for supply chain management data.

The F117 overhaul and repair effort will require depot overhaul and field repair services for the F117 propulsion system to ensure a serviceable, ready-to-install engine to meet the required War Readiness Engines (WRE) and serviceable Propulsions System (SPS) levels. Modules will be broken out and planned and programmed each year based upon engine build requirements. LLPs will be separately priced and ordered based upon need. Engine Build Unit (EBU), which is comprised of Quick Engine Change (QEC) kits and modules in the power section, will be the line of tear down inspect, disposition build and test of the F117 engine. The F117 Speedline will be set up for quick repair of stub time engines that require off wing maintenance for return to service.

Line Item Number:

	X001 Program Management

	X002 Engineering Services

	X003 Overhail and Repair Services

	X004 Overhail and Repair Services

	X005 O&A

	X006 Reliability Gainshare

	X007 Data

	X008 Transition

Central to the contract is comprehensive sustaining engineering, covering both recurring and nonrecurring work across multiple disciplines. This includes design and maintenance engineering, systems analysis, flight safety assessments, accident investigations, material evaluations, field diagnostics, and 24/7 emergency response&mdash; ensuring the engine&rsquo;s safety, reliability, and readiness.

A key pillar is robust supply chain management, tightly aligned with the Performance Work Statement (PWS) and integrated with sustainment and modernization. It includes logistics planning, forecasting, long-lead procurement, obsolescence mitigation, depot integration with OC-ALC, and continuous coordination with the F117 Program Office to ensure asset availability and minimize downtime.

Finally, depot overhaul and field-level repair services ensure restored engine performance and availability of ready-to-install propulsion systems. These services are vital to maintaining War Readiness Engine (WRE) and Serviceable Propulsion System (SPS) levels, directly supporting the Air Force&rsquo;s operational mission. Any disruption would immediately impact readiness

Contract Award Date: 30 September 2027

Period of Performance: 1 October 2027- 30 September 2047

## Open now in the same industry

117 open in NAICS 336412.

- Multiple NSNs to be added to Contract SPE4AX-25-D-9002 with OEM Pratt & Whitney (PacerTalonAddGroup1), due November 25, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/pacertalonaddgroup1
- COMPUTER, ENGINE_End_Item_F110_NSN_6620016585441PR_PN_2125M75P04 (SPRTA127R0129), due December 2, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/sprta127r0129
- CASE,AUGMENTOR,AIRC _End_Item__NSN_2840012459464OK_PN_6041T18G04 (SPRTA127R0130), due December 3, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/sprta127r0130

## Publications

- April 17, 2026: Presolicitation, due April 22, 2026 at 1:00 PM EDT. Notice 02b8349c4929434f94f0a09685264879. https://sam.gov/workspace/contract/opp/02b8349c4929434f94f0a09685264879/view

## Points of contact

- Brandon Nicholson, brandon.nicholson.4@us.af.mil
- Dawn Copeland, dawn.copeland@us.af.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/fa812426rb009.
