Solicitation
Overhaul of B-1 Hydraulic Motors
FA8118-25-R-0025
Department of the Air Force, FA8118 AFSC Pzabb. Other Aircraft Parts and Auxiliary Equipment Manufacturing.
Awarded
Thomas Instrument, Incorporated
$127,620.00 obligated so far on USAspending
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one was awarded in 2025
568 like it are open now in other aircraft parts and auxiliary equipment manufacturing
- OVERHAUL B-1 ELECTRO-MECHANICAL ACTUATORS
Department of the Air Force, FA8118 AFSC Pzabb
SolicitationNAICS 336413OklahomaFA811827RB001Due in 2 daysNov 27 - Cylinder Assembly, A
Defense Logistics Agency, DLA Aviation at Oklahoma City, Ok
SolicitationNAICS 336413Ship to OKSPRTA127R0016Due in 4 daysNov 29 - Repair of E-3 Temperature Indicator
Department of the Air Force, FA8117 AFSC Pzaba
PresolicitationNAICS 336413OklahomaFA811727RB002Due in 4 daysNov 29
All 568 open in other aircraft parts and auxiliary equipment manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336413 (other aircraft parts and auxiliary equipment manufacturing), means no more than 1,250 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 35 days from the day the solicitation was posted, January 27, 2025, to the deadline.
- How it ended
- Awarded to Thomas Instrument, Incorporated on June 12, 2025, 101 days after offers were due. The contracting office reported 1 offer (full and open competition).
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
OVERHAUL
A 1-YEAR (ONE-YEAR BASIC AND No Options) FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED.
NOTE: It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors are not required to submit certified cost or pricing data at the time of proposal. However, if after receipt of proposals, it is determined that adequate price competition does not exist, a request for other than certified cost or pricing data may be required in accordance with FAR 15.401-1(B)(1). If cost still cannot be determined fair and reasonable, then certified cost and pricing data will be required in accordance with DFARS 252.215-7008.
(a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.
(b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the Overhaul, calibration and functional test required to restore Government furnished reparables to a like-new condition. The contractor shall also accomplish necessary packing and preservation and packaging and return to the Government in completely serviceable condition, at the unit price(s) established at the time of award, the items of Air Force equipment listed below, all in accordance with the provision hereof and the Work Specification in Section J hereof. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components or as specified in the PWS/SOW after review and approval of O&A requests. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).
(c) Overhaul is the restoration of an item to a completely serviceable condition as prescribed by maitenance serviceability standards.
(d) In order to receive any technical data related to this acquisition, offerors must send an email request to Dessie Breslin at dessie.breslin@us.af.mil or David O'Rourke at david.orourke@us.af.mil. Release of any data is subject to applicable data rights. The request shall include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345. The form, including instructions for completing the form, is available at: http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. The Government is not responsible for incomplete, misdirected, or untimely requests.**
(e) GOVERNMENT PROPERTY FURNISHED FOR OVERHAUL (FAR 16.503(c))
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.
(f) END ITEMS BEYOND OVERHAUL
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).
If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the contracting officer in writing and shall not perform further overhaul on any such items except at the direction of the contracting officer (PCO). Upon written confirmation from the PCO that a particular item is not reparable, the contractor shall abide by the disposition instructions of the asset in the manner directed by the PCO.
(g) Condemned units shall not be counted as production.
(h) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government’s required delivery schedule.
(i) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time. The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.
(j) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable.
(k) The Service Contract and Labor Standards (SCLS) formerly Service Contract Act (SCA) is applicable to this effort.
(l) In accordance with the Service Contract Reporting in the System for Award Management Guidebook, the total contract value is not expected to exceed $3M thus Manpower Reporting is not applicable.
(m) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Source Development, Small Business Office @ 405-739-7243.
SAR submittals need to be sent to:
https://www.tinker.af.mil/Home/429SCMS-SASPO/ <https://www.tinker.af.mil/Home/429SCMS-SASPO/>
Source Development Specialist Email: stacy.cochran@us.af.mil <mailto:stacy.cochran@us.af.mil>
As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.
(n) Dates listed in clauses 252.216‐7006 and 52.216‐21 are based on the estimated award date. These dates will be revised prior to award based on the actual award date.
(o) In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must
include a DD1348-1when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the
DD1348-1 but will ensure DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned
asset, DCMA will not sign the DD250.
(p) In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk
assessments when determining responsibility. DFARS 252.204.7303(b) states that the contracting officer shall verify that the
summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is
specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or
delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement
National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 (reference the provision DFARS
252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110 a contractor must submit a plan with their
proposal to become compliant.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Wage_Determination.pdf180 KB, January 27, 2025
- Packaging Requirements.pdf75 KB, January 27, 2025
- DID 80441D Govt Property Inventory.pdf149 KB, January 27, 2025
- DID 80969 Surge Plan.pdf157 KB, January 27, 2025
- DID 81838 CAV Reporting.pdf30 KB, January 27, 2025
- DID 81995A CDM Production Report.pdf193 KB, January 27, 2025
- Transportation Data.pdf89 KB, January 27, 2025
- GFP.pdf55 KB, January 27, 2025
- CDRL.pdf109 KB, January 27, 2025
- CAV_AF.pdf302 KB, January 27, 2025
- PWS.pdf1.0 MB, January 27, 2025
- FA811825R0025.pdf15.5 MB, January 27, 2025
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Thomas Instrument, Incorporated
- UEI
- M3DSAMDJMXY8
- CAGE
- 5H860
- Vendor location
- Brookshire, TX
- Contract
- FA811825C0008, definitive contract
- Obligated
- $127,620.00
- Actions
- 3 between June 12, 2025 and March 24, 2026
- Competition
- Full and Open Competition, 1 offer received
- Set-aside reported
- No Set Aside Used.
- Described as
- Overhaul of B-1 Hydraulic Motors
- Match
- solicitation number FA811825R0025 equals the FPDS solicitation identifier; same awarding office FA8118 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 27, 2025
Solicitation
Due March 3, 2025 at 4:00 PM EST. SAM.gov, notice fa35c167d709466f9c797b8ef8ef8519
1 revision on SAM
- January 27, 2025: publish, solicitation
Points of contact
- Dessie Breslindessie.breslin@us.af.mil
- Amy Gilamy.gil@us.af.mil