Solicitation, total small business set-aside
Remanufacture of KC-135 Valve Assembly and F-16 Regulating Valve
FA8118-24-R-0064
Department of the Air Force, FA8118 AFSC Pzabb. Other Aircraft Parts and Auxiliary Equipment Manufacturing.
Response deadline
December 12, 2024 at 4:00 PM EST
Closed 713 days ago. Posted November 8, 2024, first published September 4, 2024. Scheduled to archive December 27, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
568 like it are open now in other aircraft parts and auxiliary equipment manufacturing
- MOTOR, HYDRAULIC_End_Item_F-16_NSN_1650015681044_PN_FA100009-001
Defense Logistics Agency, DLA Aviation at Oklahoma City, Ok
Sources soughtNAICS 336413Ship to the buyerFD20302400800-02Due todayNov 25 - DRIVE UNIT,HYDRAULI
Defense Logistics Agency, DLA Aviation at Philadelphia, PA
SolicitationNAICS 336413Ship to the buyerSPRPA127RWA06Due todayNov 25 - FLUID FILTER ELEMENT / E2A, AH-64E APACHE HELICOPTER
Defense Logistics Agency, DLA Aviation
PresolicitationNAICS 336413Ship to the buyerSPE4A727R0021-SynopsisDue todayNov 25
All 568 open in other aircraft parts and auxiliary equipment manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336413 (other aircraft parts and auxiliary equipment manufacturing), means no more than 1,250 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 99 days from the day the solicitation was posted, September 4, 2024, to the deadline. The deadline moved 2 times: it was first October 8, 2024 and ended as December 12, 2024.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
11/7/2024:Updated SOW to correct a typographical error. Closing date extended to 12/12/2024. REMANUFACTURE A 5-YEAR (3-YEAR BASIC AND One 2-YEAR OPTION PERIODS) FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED.
NOTE: It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors are not required to submit certified cost or pricing data at the time of proposal. However, if after receipt of proposals, it is determined that adequate price competition does not exist, a request for other than certified cost or pricing data may be required in accordance with FAR 15.401-1(B)(1). If cost still cannot be determined fair and reasonable, then certified cost and pricing data will be required in accordance with DFARS 252.215-7008.
(a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.
(b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition. The contractor shall also accomplish ALL necessary packing and preservation and packaging.
ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).
(c) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Source Development, Small Business Office @ 405-739-7243. SAR submittals need to be sent to:
https://www.tinker.af.mil/Home/429SCMS-SASPO/ <https://www.tinker.af.mil/Home/429SCMS-SASPO/> Source Development Specialist Email: stacy.cochran@us.af.mil <mailto:stacy.cochran@us.af.mil> As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.
(d) In order to receive any technical data related to this acquisition, offerors must send an email request to dessie.breslin@us.af.mil and david.orourke@us.af.mil. Release of any data is subject to applicable data rights.
The request shall include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345. The form, including instructions for completing the form, is available at: http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html.
The Government is not responsible for incomplete, misdirected, or untimely requests.** (e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c)) Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract. (f) END ITEMS BEYOND REMANUFACTURE "Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements.
Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders.
Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s). (g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further on any such items except after receipt of approval from the direction of the procurement contracting officer (PCO).
Upon written confirmation from the PCO that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the PCO. Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer.
Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award. (h) Condemned units shall not be counted as production. (i) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government’s required delivery schedule. (j) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time.
The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary. (l) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable. (m) Dates listed in clauses 252.216?7006, 52.216-19 and 52.216?21 are based on the estimated award date.
These dates will be revised prior to award based on the actual award date. (n) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond economical repair of limits specified in the Work Specification and/or Technical Orders. All cost for work performed by the contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 4, 2024
Solicitation, originally presolicitation
Due October 8, 2024 at 4:00 PM EDT. SAM.gov, notice c342844963cc4a9faba7b372250f9f4d
October 4, 2024
Solicitation
Due November 12, 2024 at 4:00 PM EST. SAM.gov, notice 87dd2eb9e00e464fa52092d5e76e695e
November 7, 2024
Solicitation
Due December 12, 2024 at 4:00 PM EST. SAM.gov, notice 3b44c41c2e1a4da68e190f39a4f54e6a
November 8, 2024
Solicitation
Due December 12, 2024 at 4:00 PM EST. SAM.gov, notice 665526a3f7604a708c1703208e316ffd
Points of contact
- Dessie Breslindessie.breslin@us.af.mil
- David O'Rourkedavid.orourke@us.af.mil4057344622