Solicitation
Remanufacture of the F-16 Sieve Bed Set
FA811824R0059
Department of the Air Force, FA8118 AFSC Pzabb. Other Aircraft Parts and Auxiliary Equipment Manufacturing.
Response deadline
September 9, 2024 at 4:00 PM EDT
Closed 807 days ago. Posted August 9, 2024. Scheduled to archive September 24, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
568 like it are open now in other aircraft parts and auxiliary equipment manufacturing
- MOTOR, HYDRAULIC_End_Item_F-16_NSN_1650015681044_PN_FA100009-001
Defense Logistics Agency, DLA Aviation at Oklahoma City, Ok
Sources soughtNAICS 336413Ship to the buyerFD20302400800-02Due todayNov 25 - DRIVE UNIT,HYDRAULI
Defense Logistics Agency, DLA Aviation at Philadelphia, PA
SolicitationNAICS 336413Ship to the buyerSPRPA127RWA06Due todayNov 25 - FLUID FILTER ELEMENT / E2A, AH-64E APACHE HELICOPTER
Defense Logistics Agency, DLA Aviation
PresolicitationNAICS 336413Ship to the buyerSPE4A727R0021-SynopsisDue todayNov 25
All 568 open in other aircraft parts and auxiliary equipment manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336413 (other aircraft parts and auxiliary equipment manufacturing), means no more than 1,250 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 31 days from the day the solicitation was posted, August 9, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
REMANUFACTURE A 5-YEAR (3 year basic + 1 two year option) FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED. THE GOVERNMENT ANTICIPATES A SOLE SOURCE AWARD TO Cobham Mission Systems Davenport (CAGE: 99251).
(a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.
(b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition. The contractor shall also accomplish ALL necessary packing and preservation and packaging. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and at the unit price(s) established at the time of award.
(c) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Source Development, Small Business Office @ 405-739-7243. To obtain Drawings, submit your request through the JEDMICS website. JEDMICS homepage: https://jedmics.af.mil/webjedmics/index.jsp.
All off base contractors who need an account will need to complete the instructions at the following link: https://jedmics.af.mil/webjedmics/splash/training/NEWCTR2875.pdf (d) As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.
Release of data is subject to applicable data rights. (e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c)) Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract. (f) END ITEMS BEYOND REMANUFACTURE "Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements.
Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders.
Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s). (g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further overhaul on any such items except at the direction of the administrative contracting officer (ACO).
Upon written confirmation from the ACO that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the ACO. Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer.
Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award. (h) Condemned units shall not be counted as production. (i) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government’s required delivery schedule. (j) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time.
The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary. (k) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable. (l) Dates listed in clauses 52.216-19 and 52.216-21 are based on the estimated award date.
These dates will be revised prior to award based on the actual award date. (m) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the remanufacture limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 9, 2024
Solicitation, originally presolicitation
Due September 9, 2024 at 4:00 PM EDT. SAM.gov, notice 87777d1f0c614b639a5047ee8b71a6d0
Points of contact
- Dessie Breslindessie.breslin@us.af.mil
- David O'RourkeDavid.ORourke@us.af.mil