Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,710 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Sources sought

Power System Studies FY24

FA805124R4005

Department of the Air Force, FA8051 772 Ess PKD. Engineering Services.

Response deadline

March 27, 2024 at 3:00 PM EDT

Closed 974 days ago. Posted March 5, 2024, first published March 4, 2024. Scheduled to archive March 28, 2024.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2024

98 like it are open now in engineering services

All 98 open in engineering services

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 541330 (engineering services), means no more than $25.5 million in average annual receipts, counted with affiliates. What a set-aside is
What comes next
No solicitation was published under this number after the sources sought of March 4, 2024. An agency sometimes issues the solicitation under a new number.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

The United States Air Force (USAF), Air Force Civil Engineer Center (AFCEC), Tyndall AFB, Florida, has a requirement to provide power systems analysis studies at Air Force installations in CONUS and OCONUS. The Contractor shall provide all labor, software, materials, tools, equipment, transportation, and supervision to collect field data, construct/update an electrical model, and generate analysis reports.

The Contractor shall use the electrical model to perform a power flow analysis, cross connect capability evaluation, short circuit study, protective device coordination study, and arc flash hazard analysis at the following bases: Niagara ARS (New York), Beale AFB (California), Vandenberg AFB (California), Robins AFB (Georgia), Channel Islands ANG (California), Cheyenne Mountain (Colorado), Minneapolis ARS (Minnesota), Minneapolis ANG (Minnesota) Schriever SFB (Colorado), Eielson AFB (Alaska), Altus AFB, (Oklahoma), Sheppard AFB (Texas), Luke AFB (Arizona), Suwon AB, (South Korea), Gimhae AB (South Korea), Yokota AB (Japan), Incirlik AB (Turkey) In addition, the Contractor shall perform transformer oil sampling and testing, infrared inspections, and distribution reliability study at the installations listed above.

The electrical distribution systems include items such as: • Switching stations • Substations • Transmission, distribution, and service cables • Primary distribution equipment • Government owned power generating stations feeding directly into the primary distribution system. • Government owned renewable power generation feeding directly into the primary distribution system (such as generators, wind, and photovoltaic).

The study shall encompass the entire primary distribution system through the secondary up to and including the building service entrance disconnect and includes all motor loads 50HP or greater installed anywhere in the distribution system. Any medium voltage distribution and primary distribution equipment located on the interior of a building shall also be included in the study. This study shall not include:

• Standby or emergency generators serving individual facilities • Portions of the distribution system owned and operated by Military Family Housing, unless specifically noted in Base Specific Requirements Attachments.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 4, 2024

    Sources sought

    Power Systems Analysis FY24

    Due March 27, 2024 at 3:00 PM EDT. SAM.gov, notice cff8e6c889434e018f45be8c2c216b1d

  2. March 5, 2024

    Sources sought

    Due March 27, 2024 at 3:00 PM EDT. SAM.gov, notice 916ff323535546cfbcb79551f70b585e

Points of contact