Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,430 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, total small business set-aside

PKA - 11 CES Automatic Generator Monitoring Devices

FA706025Q0029

Department of the Air Force, FA7060 11TH Contracting SQ PK. Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables.

Awarded

Digital Prototype Systems, Inc.

$46,427.02 obligated so far on USAspending

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one was awarded in 2025

28 like it are open now in instruments and related products manufacturing for measuring, displaying, and controlling industrial process variables

All 28 open in instruments and related products manufacturing for measuring, displaying, and controlling industrial process variables

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 334513 (instruments and related products manufacturing for measuring, displaying, and controlling industrial process variables), means no more than 750 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 11 days from the day the solicitation was posted, September 18, 2025, to the deadline. The deadline moved once: it was first September 23, 2025 and ended as September 29, 2025.
How it ended
Awarded to Digital Prototype Systems, Inc. on September 30, 2025, 1 day after offers were due. The contracting office reported 2 offers (competed under simplified acquisition procedures).

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

The Remote Generator Monitoring System is a new requirement designed to provide comprehensive monitoring of generator performance, including run-time hours, without requiring Internet connectivity with a required delivery date of 90 days ADC. The system is fully self-contained and operates independently, ensuring data security and accessibility even in remote locations. Data is stored locally, and a customized procedure is included to allow easy retrieval of information directly to a laptop via Microsoft Excel for analysis and reporting, without the need for specialized or proprietary software. This eliminates the complexities and potential vulnerabilities associated with cloud-based solutions.

The critical performance for this requirement will be the following; Provide an assessment as to whether the requirements are military unique or can be acquired to some degree in the commercial market sector. Identify as appropriate any critical and long lead schedule items which will impact contract performance and delivery requirements. Ability to store logged data locally and download data by connecting to laptop via cable (i.e. no cellular/internet network connection, no ethernet cables)
- Data is stored locally, and a customized procedure is included to allow easy retrieval of information directly to a laptop via Microsoft Excel for analysis and reporting, without the need for specialized or proprietary software
- No annual subscription/renewal fees for data storage or cellular connectivity
- Discrete alarm inputs
- Analog inputs
- Control relays
- Serial port
- Alert speakers and LCD display

The automatic monitoring devices are required to log the exact date, time, duration, and reason for every single operation of the generator. The generators themselves do not automatically log this information, and 11 CES does not have the manpower needed to monitor every single generator's operational status 24/7. Therefore, each unexpected operation of an emergency generator (i.e. unexpected utility outage) constitutes a permit violation.

JBAB's current inability to collect this information triggers Title V permit violations, which can each result in fines. The automatic monitoring devices, once installed, will log this information automatically which can then be downloaded by 11 CES Power Pro at any time. This will allow JBAB to return to compliance on violated permit conditions.

This requirement is for network-less devices (i.e. all data collected is stored locally). For ease of installation, use, and maintenance of the devices, on 11 WG emergency generators. The requirement does not allow for connectivity to cellular/internet networks or storage of sensitive information on the device manufacturer's cloud and is for network-less devices on all generators. 

****Amendment A0001 - This solicitation has been amended, The purpose of this amendment is to extend the solicitation closing date to Monday, September 29, 2025 at 12:00pm EDT.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
CFJVYLRYCXM4
CAGE
1UJX6
Vendor location
Fresno, CA
Contract
FA706025P0042, purchase order
Obligated
$46,427.02
Actions
1 between September 30, 2025 and September 30, 2025
Competition
Competed Under SAP, 2 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
Automatic Generator Monitoring Devices to Provide Comprehensive Monitoring of Generator Performance, Including RUN-TIME Hours, and Locally Stored Data Allowing for Easy Retrieval of Information Directly to a Laptop for Analysis and Reporting.
Match
solicitation number FA706025Q0029 equals the FPDS solicitation identifier; same awarding office FA7060 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 18, 2025

    Combined synopsis and solicitation

    Due September 23, 2025 at 4:00 PM EDT. SAM.gov, notice c9c1b0f98c5f411495c3990c7711b535

    2 revisions on SAM
    • September 29, 2025: publish, combined synopsis and solicitation
    • September 18, 2025: publish, combined synopsis and solicitation
  2. September 29, 2025

    Combined synopsis and solicitation

    Due September 29, 2025 at 12:00 PM EDT. SAM.gov, notice f1c8cbafe3c149ff8816aec4684e028d

    2 revisions on SAM
    • September 29, 2025: publish, combined synopsis and solicitation
    • September 18, 2025: publish, combined synopsis and solicitation

Points of contact