# CNS Alternate Transformer Substation

Canonical: https://sealedbidder.com/opportunities/fa557525b0010

- Solicitation number: FA557525B0010
- Notice type: Solicitation
- Status: Awarded to Sociedad Espanola De Montajes Industriales SA
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA5575 496 Abs PK (FA5575)
- NAICS: 237130 Power and Communication Line and Related Structures Construction
- Product or service code: Y1NZ Construction Of Other Utilities
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 237130)
- Place of performance: Moron Air Base, SPAIN
- Who can bid, by location: Outside the US. The work is outside the United States.
- First posted: July 1, 2025
- Last posted: August 18, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/72b14594be0a4ee59adcaec6b7ef5803/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237130 (power and communication line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 50 days from the day the solicitation was posted, July 1, 2025, to the deadline. The deadline moved once: it was first August 6, 2025 and ended as August 20, 2025.
- How it ended: Awarded to Sociedad Espanola De Montajes Industriales SA on August 25, 2025, 5 days after offers were due. The contracting office reported 2 offers (full and open competition).

## Description

AMENDMENT 6: The purpose of this amendment is to correct an error on the Questions and Answers document.  Prospective contractors should direct their attention to Question #5 and Answer #6.

Bottom line up front, prospective contracts shall submit their Construction Cost Estimate Breakdown with line item #102 (Endesa works) filled out with a total of 194,374.81 EUR (IVA included).

All other terms and conditions of this solicitation remain unchanged.

AMENDMENT 5: The purpose of this amendment is to provide the final version of the amended documents following the changes mandated by the Spanish Electrical Distribution company, Endesa Distribucion.  The following documents will be added:

1. AMD 5 - Drawings - Basic Package

2. AMD 5 - English Specifications

3. AMD 5 - Especificaciones Espanol

4. AMD 5 - Summary of Amd 5 Changes

Please request for the files via email to the Construction team POCs.

The bid due date will not be extended due to the risk of funds availability and the timeframe in relation to the end of FY25.

All other terms and conditions of this solicitation remain unchanged.

AMENDMENT 4:  The purpose of this amendment is to provide the Questions and Answers submitted by contractors for this solicitation.  Please refer to the attachments section for the Q&A document.  All other terms and conditions of this solicitation remain unchanged.

AMENDMENT 3: The purpose of this amendment is to extend the bid due date to 20 August 2025 at 10:00 am local time (CEST).

All other terms and conditions of this solicitation remain unchanged.

AMENDMENT 2: The purpose of this amendment is to notify prospective contractors of a few updated attachments:

4. English Specifications - AMD 1

5. Especificaciones Espanol - AMD 1

6. Construction Cost Estimate Breakdown BLANK - AMD 1

All other terms and conditions of this solicitation remain unchanged.

AMENDMENT 1:  The site visit date and time have been updated to 15 July 2025 at 10:00 am local time (CEST).

Additionally, the following changes are anticipated due to mandatory design changes initiated by the Spanish Electrical Distribution company, Endesa Distribucion:

1. The projected electrical utilities are in the 50 Hz side of the Moron AB electrical system and

they will be electrically connected to the Spanish distribution grid. As a result, the Spanish

codes, rules and procedures are mandatory in this project.

2. The electrical distribution grid company, where these utilities will be connected to, belongs

to Endesa Distribucion (EDE), that has their own standards that are also mandatory in this project,

and are subject by review and approval by EDE technical personnel.

3. EDE's review is taking place in these days, so it is expected that minor changes will occur in

project drawings and specifications as a result of EDE's recommendations. These recommendations are

not expected to increase/decrease the scope of the project, but they will mainly be associated to

parts of the installation being installed by either the Contractor or by EDE with their own means

(whose cost will remain under the project in any case, since the Contractor will have to arrange

with EDE the coordination, execution of works and commissioning of all utilities).

4. The design includes all necessary installations and utilities for the new 5 MVA transformer

bay, being a comprehensive solution. Possible changes to the design, as mentioned above, will

mainly drive to items being deleted from the drawings/specs since they will be executed by EDE and

not by the Contractor, but will be indeed executed within the project anyways.

As a result of the above, please expect some of the project documents to change. The updated documents will be made available as soon as we

receive them. Any extensions to this solicitation will be considered after receipt of the updated documents.

Project QUUG 10-1049, CNS Alternate Transformer Substation, Moron Air Base, Spain.

The magnitude of this project is between $1,000,000 and $5,000,000 U.S. Dollars. This is furnished for the convenience of prospective contractors. The actual extent of work requirements will be governed by the specifications and drawings. See section L for complete information regarding referenced project. Offers will be evaluated according to the criteria in Section M, Evaluation criteria for award.

A pre-proposal Conference / Site Visit will be held 15 July 2025, 10:00 hours local time, in the Contracting Conference room, bldg 106. Please RSVP via email at least 24 hours prior to the site visit. Unless you have access to Moron Air Base, you will need an escort. If you require an escort, please request access via email at least 72 hours prior to the site visit. Questions in regards to this solicitation must be submitted via email no later than 23 July 2025. Bids must be received no later than 10:00 hours local time on 6 August 2025. Bids submitted by facsimile will NOT be accepted. Please ensure bids adhere to all requirements found in Section L of this solicitation. Nonconforming bids will not be accepted or evaluated.

Due to file size constraints, interested contractors must request one attachment, 1. Drawings - Basic Package.

The Contracting POCs are:

Ms. Elia Portz: elia.portz_cueli.1.es@us.af.mil

TSgt Augustus Shinn: augustus.shinn@us.af.mil

SrA Ryan Kulpa: ryan.kulpa@us.af.mil

In accordance with the Agreement of Defense and Cooperation between the Kingdom of Spain and the United States of America, any contract resulting from this notice/solicitation can only be entered into with companies authorized to carry out these activities in Spain under Spanish law. Companies must meet the requirements established by Spanish legislation for execution of Government works. In addition, in accordance with the Agreement of Defense Cooperation between the U.S.A. and the Kingdom of Spain, Annex 6, Article 1 (3) "The contractors must meet the requirements established by Spanish legislation for execution of government works. A breach of contract on the part of a contractor shall have the same consequences for the contractor for purposes of future contracting with the Spanish government as would occur with a breach of a contract with the Spanish public administration." and (5) " Spanish material, labor, and equipment shall be used whenever feasible and consistent with the requirements".

NOTE: THIS SOLICITATION IS INTENDED ONLY FOR LOCAL SOURCES IN ACCORDANCE WITH FEDERAL ACQUISITION REGULATION 5.202(a)(12). LOCAL SOURCES ARE THOSE SOURCES NORMALLY RESIDENT, LICENSED AND REGISTERED TO CONDUCT CONSTRUCTION BUSINESS IN SPAIN. OFFERS FROM NON-LOCAL SOURCES WILL NOT BE CONSIDERED UNDER THIS SOLICITATION.

Notice to Offerors: Funds are not presently available within USAFE to fund this project, so bid acceptance period should be valid through 31 Dec 2025. The Government reserves the right to cancel this solicitation, at any time with no obligation to the offeror by the government.

## Attachments

- [7. Schedule of Material Submittals.xlsx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/920c015ebe204e3890982bdce46b4512/download)
- [3. Drawings - Additive 2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8ea7d5e8cec34f328192686d0fc23833/download)
- [2. Drawings - Additive 1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d18fe7fab65f4a2da72f9f6cc7eb58b6/download)
- [Solicitation - FA557525B0010.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ed1d1054e31e47e4bc905ec5b5160885/download)

## Award on USAspending

- Recipient: Sociedad Espanola De Montajes Industriales SA (UEI GN57AL1PC9M4)
- Contract: FA557525C0011, definitive contract
- Obligated: $3,372,960.74
- Competition: Full and Open Competition, 2 offers received
- Link: solicitation number FA557525B0010 equals the FPDS solicitation identifier; same awarding office FA5575 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_FA557525C0011_9700_-NONE-_-NONE-/


## Open now in the same industry

7 open in NAICS 237130.

- DLA DWCF B1907 Backup Power Generator, Yokosuka, Japan (W912HV27Z0002), due December 11, 2026 at 9:59 AM EST. https://sealedbidder.com/opportunities/w912hv27z0002
- P210 ELECTRIC POWER PLANT AND ELECTRICAL DISTRIBUTION SYSTEM AT CHABELLEY AIRFIELD, DJIBOUTI (N6247027R0001), due December 18, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/n6247027r0001
- COTP Series Capacitor Two-Phase Design Build (89503326RWA000049), due March 5, 2027 at 5:00 PM EST. https://sealedbidder.com/opportunities/89503326rwa000049

## Publications

- July 1, 2025: Solicitation, due August 6, 2025 at 4:00 AM EDT. Notice 4a794dc8134146e3ba8734e3cf07f362. https://sam.gov/workspace/contract/opp/4a794dc8134146e3ba8734e3cf07f362/view
- July 3, 2025: Solicitation, due August 6, 2025 at 4:00 AM EDT. Notice 51ef054951a54cef845c69ea237c0793. https://sam.gov/workspace/contract/opp/51ef054951a54cef845c69ea237c0793/view
- July 10, 2025: Solicitation, due August 6, 2025 at 4:00 AM EDT. Notice 05998204761f432da734787e5500134a. https://sam.gov/workspace/contract/opp/05998204761f432da734787e5500134a/view
- July 16, 2025: Solicitation, due August 20, 2025 at 4:00 AM EDT. Notice 3115737cdad24889887c94631558ad2a. https://sam.gov/workspace/contract/opp/3115737cdad24889887c94631558ad2a/view
- July 16, 2025: Solicitation, due August 20, 2025 at 4:00 AM EDT. Notice 7981770d67a041e0af7583a5d14f4a1c. https://sam.gov/workspace/contract/opp/7981770d67a041e0af7583a5d14f4a1c/view
- July 25, 2025: Solicitation, due August 20, 2025 at 4:00 AM EDT. Notice 63acae2701d946e3af96a9aae2f19c61. https://sam.gov/workspace/contract/opp/63acae2701d946e3af96a9aae2f19c61/view
- August 14, 2025: Solicitation, due August 20, 2025 at 4:00 AM EDT. Notice f88351ff2ea143839b350be7186eeb1c. https://sam.gov/workspace/contract/opp/f88351ff2ea143839b350be7186eeb1c/view
- August 18, 2025: Solicitation, due August 20, 2025 at 4:00 AM EDT. Notice 72b14594be0a4ee59adcaec6b7ef5803. https://sam.gov/workspace/contract/opp/72b14594be0a4ee59adcaec6b7ef5803/view

## Points of contact

- Elia Portz, elia.portz_cueli.1.es@us.af.mil, 34955848017
- Augustus Shinn, augustus.shinn@us.af.mil, 34955848481

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/fa557525b0010.