Combined synopsis and solicitation, total small business set-aside, first published as sources sought
LOCOMOTIVE LIGHTS AND SPEEDOMETER
FA480024QA094
Department of the Air Force, FA4800 633 Cons PKP. Motor Vehicle Electrical and Electronic Equipment Manufacturing.
Response deadline
September 27, 2024 at 11:30 AM EDT
Closed 789 days ago. Posted September 27, 2024, first published September 10, 2024. Scheduled to archive September 27, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
27 like it are open now in motor vehicle electrical and electronic equipment manufacturing
- 6220-01-473-2116; 26F; F-16 AIRCRAFT
Defense Logistics Agency, DLA Aviation
PresolicitationNAICS 336320Ship to VASPE4A627R0081Due todayNov 25 - Engine Block Assembly
Defense Logistics Agency, DLA Land Warren
Sources soughtNAICS 336320Ship to the buyer2027-KM002Due todayNov 25 - CONTROL,ELECTRIC LI, IN REPAIR/MODIFICATION OF
Department of the Navy, NAVSUP Weapon Systems Support
SolicitationNAICS 336320Ship to the buyerN0038326RHA73Due in 2 daysNov 27
All 27 open in motor vehicle electrical and electronic equipment manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336320 (motor vehicle electrical and electronic equipment manufacturing), means no more than 1,000 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Offers were due the day the solicitation was posted, September 27, 2024. The deadline moved once: it was first September 13, 2024 and ended as September 27, 2024.
- Before the solicitation
- The agency published a sources sought on September 10, 2024, 17 days before the solicitation.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The locomotive can be placed into service as a standalone piece of equipment, auxiliary lights need to be installed on the running boards above the pilot IAW CFR 49 Part 229.125 section D. The vendor will install light mounts, housing, bulbs, run conduit, wire and install switch gear for operation by the engineer in the cab of the locomotive. The vendor will also install a speedometer in the cab of the locomotive with a drive installed off one of the axles.
The vendor will be required to fabricate amount for an axle driven generator, provide wiring and conduit to connect the generator to the speedometer drive and then to the speedometer head which will be within the view of the engineer’s seat. The speedometer will be calibrated and operationally checked by the vendor.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 10, 2024
Sources sought
Sources sought Locomotive Ditch light and speedometer
Due September 13, 2024 at 1:00 PM EDT. SAM.gov, notice 698b8888ba6b407493ff54f655421827
September 27, 2024
Combined synopsis and solicitation
Due September 27, 2024 at 11:30 AM EDT. SAM.gov, notice e4dff529d5784495a9205c9084146cb0
September 27, 2024
Combined synopsis and solicitation
Due September 27, 2024 at 11:30 AM EDT. SAM.gov, notice f6a7b58ab60d49b5b8d364f1aa5f682b
Points of contact
- Rebeca Rujirebeca.ruji.tz@us.af.mil7577643060
- TSgt Mark Maylemark.mayle.1@us.af.mil7572259900