Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,710 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation, total small business set-aside

Beale AFB Utility Well #9

FA468624R0006-W9

Department of the Air Force, FA4686 9 Cons PK. Water and Sewer Line and Related Structures Construction.

Response deadline

February 14, 2024 at 7:30 PM EST

Closed 1015 days ago. Posted January 31, 2024. Scheduled to archive February 29, 2024.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2024

25 like it are open now in water and sewer line and related structures construction

All 25 open in water and sewer line and related structures construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 237110 (water and sewer line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 14 days from the day the solicitation was posted, January 31, 2024, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

This is a pre-solicitation, no offers will be made at this time. Major Work Elements The Contractor shall furnish all design, labor, supervision, transportation, materials, testing, analysis, reports, permits, specifically air quality authority to construct permit, hauling, tools, and equipment to accomplish all the work involved as necessary to conduct replacement of well #9 :

1. Repair by Replace Water Well #9 Contractor shall drill and install new water well, pump, and control system with industry standard casing to a sufficient depth capable of maintaining flow of 1,200 gallons per minute (GPM) to the existing drinking water supply piping network. Well installation shall be completed by a State of California C-57 licensed drilling contractor.

Contractor shall provide new concrete pad estimated to be 6 feet by 10 feet and raised to 24 inches above grade to conform to 100-year flood standards. Contractor shall furnish new downhole water level sensing equipment to be connected to Siemens automated system. Well shall conform to all local, state, regional and federal requirements for a community drinking water supply well, including sanitary/annular to a required depth, not less than 50ft.

2. Electrical The well system will be powered by existing electrical transformer power (3 phase 480V). Existing electrical power is provided by a pole mounted transformer. A current project is removing the overhead power and replacing it with an underground duct bank and pad mounted transformer. This project will connect to whatever is existing at the time of well installation. Contractor shall provide new 75 horsepower submersible well pump, wiring, Pump controller (VFD) and associated parts and equipment. Upgrade existing water flow meter with new water flow meter.

3. Plumbing Modify existing piping as required to connect with new well. All piping shall meet appropriate code requirements and at a minimum shall match existing systems. Contractor shall provide new gate valve for water supply piping and flush piping.

4. Fencing Contractor shall remove existing fencing around well piping and foundation, saving fence caps for re-use with barbed wiring. Contractor shall install new chain link fencing with barbed wire topping around new well and associated piping.

5. Well Decommission Contractor shall provide well destruction plan to decommission the existing well to satisfy Yuba County permit requirements. Proper abandonment and sealing of existing Well #9 in accordance with local, state, regional and federal requirements.

6. Disposal The Contractor shall coordinate with 9CES Environmental staff to determine proper disposal requirements for materials, which may include on-base recycling, hazardous waste disposal, or non-hazardous waste offsite disposal. It shall remain the responsibility of the Contractor to haul and dispose of removed materials identified for offsite disposal. All fees to dispose material offsite shall be the responsibility of the Contractor. The Contractor shall contact 9CES Hazardous Waste Program Manager for proper disposal details and required coordination and documentation references. Coordination shall also be made with 9CES Environmental regarding recycling.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 31, 2024

    Solicitation, originally sources sought

    Due February 14, 2024 at 7:30 PM EST. SAM.gov, notice e14f84acfc6d4f8a8e24abe5f444952e

Points of contact