{"canonical":"https://sealedbidder.com/opportunities/fa466126r0008","key":"FA466126R0008","url":"https://sealedbidder.com/opportunities/fa466126r0008","title":"Airfield Blast Shield","solicitation_number":"FA466126R0008","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-10-27T15:00:00Z","first_posted":"2026-08-05","last_posted":"2026-10-16","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE AIR FORCE","office":"FA4661 7 CONS CD","naics":"238120","psc":"Y1BZ","set_aside":"SBA","place_state":"TX","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"48441","place_county_name":"Taylor County","place_city":"4801000","place_city_name":"Abilene","winner":null,"award_amount":null,"publications":[{"notice_id":"ba79329aaafc4a0ebf047ea1a60a5a8b","title":"Construction Airfield Blast Shield","solicitation_number":"FA466126R0008","notice_type":"r","base_type":"r","posted":"2026-08-05","posted_at":"2026-08-05T21:01:53.414Z","due_at":"2026-08-07T21:00:00Z","due_date":"2026-08-07","cancelled":false,"archived":true,"archive_date":"2026-08-22","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ba79329aaafc4a0ebf047ea1a60a5a8b/view","enriched":true,"history":[{"index":3,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-07T18:33:23.072Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea","solicitation_number":"FA466126R0008","parent_opportunity_id":"ba79329aaafc4a0ebf047ea1a60a5a8b"},{"index":1,"title":"Construction Airfield Blast Shield","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-05T21:01:53.414Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"ba79329aaafc4a0ebf047ea1a60a5a8b","solicitation_number":"FA466126R0008"}]},{"notice_id":"ca1619a1576b4c85970aa23b7bc5d0ea","title":"Construction Airfield Blast Shield","solicitation_number":"FA466126R0008","notice_type":"r","base_type":"r","posted":"2026-08-07","posted_at":"2026-08-07T18:33:23.072Z","due_at":"2026-08-14T21:00:00Z","due_date":"2026-08-14","cancelled":false,"archived":true,"archive_date":"2026-08-29","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ca1619a1576b4c85970aa23b7bc5d0ea/view","enriched":true,"history":[{"index":6,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-18T20:54:42.027Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2946120541a34c9ea319ada79e61bb63","solicitation_number":"FA466126R0008","related_opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea"},{"index":4,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-07T18:33:23.072Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea","solicitation_number":"FA466126R0008","parent_opportunity_id":"ba79329aaafc4a0ebf047ea1a60a5a8b"},{"index":1,"title":"Construction Airfield Blast Shield","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-05T21:01:53.414Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"ba79329aaafc4a0ebf047ea1a60a5a8b","solicitation_number":"FA466126R0008"}]},{"notice_id":"2946120541a34c9ea319ada79e61bb63","title":"Construction Airfield Blast Shield","solicitation_number":"FA466126R0008","notice_type":"p","base_type":"r","posted":"2026-08-18","posted_at":"2026-08-18T20:54:42.027Z","due_at":"2026-09-02T22:00:00Z","due_date":"2026-09-02","cancelled":false,"archived":true,"archive_date":"2026-09-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2946120541a34c9ea319ada79e61bb63/view","enriched":true,"history":[{"index":5,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-18T20:54:42.027Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2946120541a34c9ea319ada79e61bb63","solicitation_number":"FA466126R0008","related_opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea"},{"index":3,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-07T18:33:23.072Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea","solicitation_number":"FA466126R0008","parent_opportunity_id":"ba79329aaafc4a0ebf047ea1a60a5a8b"}]},{"notice_id":"255eb9065b18475981b985fdeecd134d","title":"Airfield Blast Shield","solicitation_number":"FA466126R0008","notice_type":"o","base_type":"p","posted":"2026-09-18","posted_at":"2026-09-18T19:49:44.948Z","due_at":"2026-10-15T15:00:00Z","due_date":"2026-10-15","cancelled":false,"archived":true,"archive_date":"2026-10-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/255eb9065b18475981b985fdeecd134d/view","enriched":true,"history":[{"index":4,"title":"Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-18T19:49:44.948Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"255eb9065b18475981b985fdeecd134d","solicitation_number":"FA466126R0008","related_opportunity_id":"2946120541a34c9ea319ada79e61bb63"},{"index":3,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-18T20:54:42.027Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2946120541a34c9ea319ada79e61bb63","solicitation_number":"FA466126R0008","related_opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea"}]},{"notice_id":"4bb38cb2028845d9b1df70564dbd5f49","title":"Airfield Blast Shield","solicitation_number":"FA466126R0008","notice_type":"o","base_type":"o","posted":"2026-10-13","posted_at":"2026-10-13T21:14:17.075Z","due_at":"2026-10-27T15:00:00Z","due_date":"2026-10-27","cancelled":false,"archived":true,"archive_date":"2026-11-11","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4bb38cb2028845d9b1df70564dbd5f49/view","enriched":true,"history":[{"index":5,"title":"Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-13T21:14:17.075Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4bb38cb2028845d9b1df70564dbd5f49","solicitation_number":"FA466126R0008","parent_opportunity_id":"255eb9065b18475981b985fdeecd134d","related_opportunity_id":"2946120541a34c9ea319ada79e61bb63"},{"index":4,"title":"Airfield Blast Shield","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-18T19:49:44.948Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"255eb9065b18475981b985fdeecd134d","solicitation_number":"FA466126R0008","related_opportunity_id":"2946120541a34c9ea319ada79e61bb63"},{"index":3,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-18T20:54:42.027Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2946120541a34c9ea319ada79e61bb63","solicitation_number":"FA466126R0008","related_opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea"}]},{"notice_id":"53e4c88753fc408d949f29d55a8f2798","title":"Airfield Blast Shield","solicitation_number":"FA466126R0008","notice_type":"o","base_type":"o","posted":"2026-10-16","posted_at":"2026-10-16T19:09:09.952Z","due_at":"2026-10-27T15:00:00Z","due_date":"2026-10-27","cancelled":false,"archived":true,"archive_date":"2026-11-11","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/53e4c88753fc408d949f29d55a8f2798/view","enriched":true,"history":[{"index":6,"title":"Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-16T19:09:09.952Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53e4c88753fc408d949f29d55a8f2798","solicitation_number":"FA466126R0008","parent_opportunity_id":"255eb9065b18475981b985fdeecd134d","related_opportunity_id":"2946120541a34c9ea319ada79e61bb63"},{"index":5,"title":"Airfield Blast Shield","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-13T21:14:17.075Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4bb38cb2028845d9b1df70564dbd5f49","solicitation_number":"FA466126R0008","parent_opportunity_id":"255eb9065b18475981b985fdeecd134d","related_opportunity_id":"2946120541a34c9ea319ada79e61bb63"},{"index":4,"title":"Airfield Blast Shield","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-18T19:49:44.948Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"255eb9065b18475981b985fdeecd134d","solicitation_number":"FA466126R0008","related_opportunity_id":"2946120541a34c9ea319ada79e61bb63"},{"index":3,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-18T20:54:42.027Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2946120541a34c9ea319ada79e61bb63","solicitation_number":"FA466126R0008","related_opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea"}]}],"latest_notice_id":"53e4c88753fc408d949f29d55a8f2798","first_type":"r","notices":[{"dates":{"posted":"2026-08-05","posted_at":"2026-08-05T21:01:53.414Z","created_at":"2026-08-05T20:04:55.216Z","modified_at":"2026-08-29T05:07:01.482Z","response_deadline":{"raw":"2026-08-07T16:00:00-05:00","utc":"2026-08-07T21:00:00Z","date":"2026-08-07","time":"16:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ba79329aaafc4a0ebf047ea1a60a5a8b/view"},"naics":{"codes":["238120"],"primary":"238120"},"title":"Construction Airfield Blast Shield","agency":{"office":{"code":"FA4661","name":"FA4661 7 CONS CD"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"79607-1581","city":"DYESS AFB","state":"TX","country":"USA"},"organization_id":"500042264","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-22","archive_type":"auto15"},"history":[{"index":3,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-07T18:33:23.072Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea","solicitation_number":"FA466126R0008","parent_opportunity_id":"ba79329aaafc4a0ebf047ea1a60a5a8b"},{"index":1,"title":"Construction Airfield Blast Shield","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-05T21:01:53.414Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"ba79329aaafc4a0ebf047ea1a60a5a8b","solicitation_number":"FA466126R0008"}],"contacts":[{"name":"James Lynch","role":"primary","email":"james.lynch.18@us.af.mil","phone":"3256961457"},{"name":"Abigail Spiers","role":"secondary","email":"abigail.spiers@us.af.mil","phone":"3256963862"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"ba79329aaafc4a0ebf047ea1a60a5a8b","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"ba79329aaafc4a0ebf047ea1a60a5a8b","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-26T02:47:22.491524080Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"d60e2eb45c6b2cfd398c4b08247cdeaed7b870ae6e155b59fdc86f6e12b36754","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-26T02:47:22.491524080Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"html":"<p>Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B. All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL&rsquo;s), and all applicable Federal, State and local regulations/codes.</p>\n\n<p>The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations running in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall beconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectorsmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.The blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blastfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.</p>\n\n<p>Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul Route subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access.<br />\n&nbsp;</p>\n\n<p>Construction Storage Yard &amp; Contractor Limits: Contractor shall store all equipment and material within the designed laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,the yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor shall obtain approval for any project limits changes prior to construction commencement from 7 CES through the Contracting Officer. The approved laydown yard will be provided at the pre-construction meeting.</p>\n\n<p>Contractor shall provide material submittals for all materials &amp; products used in the project on an AF Form 3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least one week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each day, crew sizes, and work locations.<br />\n&nbsp;</p>\n\n<p>Note: This post is for market research purposes only. No proposals will be reviewed or accepted at this time.&nbsp;</p>","text":"Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B. All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL’s), and all applicable Federal, State and local regulations/codes.\n\nThe blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations running in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall beconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectorsmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.The blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blastfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.\n\nHaul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul Route subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access.\n\nConstruction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the designed laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,the yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor shall obtain approval for any project limits changes prior to construction commencement from 7 CES through the Contracting Officer. The approved laydown yard will be provided at the pre-construction meeting.\n\nContractor shall provide material submittals for all materials & products used in the project on an AF Form 3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least one week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each day, crew sizes, and work locations.\n\nNote: This post is for market research purposes only. No proposals will be reviewed or accepted at this time.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"FA466126R0008","place_of_performance":{"city":{"code":"1000","name":"Abilene"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BZ"},{"dates":{"posted":"2026-08-07","posted_at":"2026-08-07T18:33:23.072Z","created_at":"2026-08-07T18:26:30.810Z","modified_at":"2026-08-29T05:07:01.482Z","response_deadline":{"raw":"2026-08-14T16:00:00-05:00","utc":"2026-08-14T21:00:00Z","date":"2026-08-14","time":"16:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ca1619a1576b4c85970aa23b7bc5d0ea/view"},"naics":{"codes":["238120"],"primary":"238120"},"title":"Construction Airfield Blast Shield","agency":{"office":{"code":"FA4661","name":"FA4661 7 CONS CD"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"79607-1581","city":"DYESS AFB","state":"TX","country":"USA"},"organization_id":"500042264","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-29","archive_type":"auto15"},"history":[{"index":6,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-18T20:54:42.027Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2946120541a34c9ea319ada79e61bb63","solicitation_number":"FA466126R0008","related_opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea"},{"index":4,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-07T18:33:23.072Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea","solicitation_number":"FA466126R0008","parent_opportunity_id":"ba79329aaafc4a0ebf047ea1a60a5a8b"},{"index":1,"title":"Construction Airfield Blast Shield","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-05T21:01:53.414Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"ba79329aaafc4a0ebf047ea1a60a5a8b","solicitation_number":"FA466126R0008"}],"contacts":[{"name":"James Lynch","role":"primary","email":"james.lynch.18@us.af.mil","phone":"3256961457"},{"name":"Abigail Spiers","role":"secondary","email":"abigail.spiers@us.af.mil","phone":"3256963862"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"ca1619a1576b4c85970aa23b7bc5d0ea","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"ba79329aaafc4a0ebf047ea1a60a5a8b","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-25T03:20:11.108474856Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"d90f537772c1b75f438147bc2adcab5a7a71c6c791cff9dea5dcbd5438f471c1","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-25T03:20:11.108474856Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"html":"<p>Amendment 1: Response date changed from August 7, 2026 to August 14, 2026</p>\n\n<p>Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B. All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL&rsquo;s), and all applicable Federal, State and local regulations/codes.</p>\n\n<p>The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations running in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall beconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectorsmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.The blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blastfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.</p>\n\n<p>Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul Route subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access.<br />\n&nbsp;</p>\n\n<p>Construction Storage Yard &amp; Contractor Limits: Contractor shall store all equipment and material within the designed laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,the yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor shall obtain approval for any project limits changes prior to construction commencement from 7 CES through the Contracting Officer. The approved laydown yard will be provided at the pre-construction meeting.</p>\n\n<p>Contractor shall provide material submittals for all materials &amp; products used in the project on an AF Form 3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least one week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each day, crew sizes, and work locations.<br />\n&nbsp;</p>\n\n<p>Note: This post is for market research purposes only. No proposals will be reviewed or accepted at this time.&nbsp;</p>","text":"Amendment 1: Response date changed from August 7, 2026 to August 14, 2026\n\nWork under this project shall consist of providing all plant, labor, equipment, appliances, materials, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B. All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL’s), and all applicable Federal, State and local regulations/codes.\n\nThe blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations running in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall beconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectorsmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.The blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blastfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.\n\nHaul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul Route subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access.\n\nConstruction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the designed laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,the yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor shall obtain approval for any project limits changes prior to construction commencement from 7 CES through the Contracting Officer. The approved laydown yard will be provided at the pre-construction meeting.\n\nContractor shall provide material submittals for all materials & products used in the project on an AF Form 3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least one week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each day, crew sizes, and work locations.\n\nNote: This post is for market research purposes only. No proposals will be reviewed or accepted at this time.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"FA466126R0008","place_of_performance":{"city":{"code":"1000","name":"Abilene"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BZ"},{"dates":{"posted":"2026-08-18","posted_at":"2026-08-18T20:54:42.027Z","created_at":"2026-08-17T20:04:56.404Z","modified_at":"2026-09-17T05:07:37.366Z","response_deadline":{"raw":"2026-09-02T17:00:00-05:00","utc":"2026-09-02T22:00:00Z","date":"2026-09-02","time":"17:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2946120541a34c9ea319ada79e61bb63/view"},"naics":{"codes":["238120"],"primary":"238120"},"title":"Construction Airfield Blast Shield","agency":{"office":{"code":"FA4661","name":"FA4661 7 CONS CD"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"79607-1581","city":"DYESS AFB","state":"TX","country":"USA"},"organization_id":"500042264","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-09-17","archive_type":"auto15"},"history":[{"index":5,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-18T20:54:42.027Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2946120541a34c9ea319ada79e61bb63","solicitation_number":"FA466126R0008","related_opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea"},{"index":3,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-07T18:33:23.072Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea","solicitation_number":"FA466126R0008","parent_opportunity_id":"ba79329aaafc4a0ebf047ea1a60a5a8b"}],"contacts":[{"name":"James Lynch","role":"primary","email":"james.lynch.18@us.af.mil","phone":"3256961457"},{"name":"Abigail Spiers","role":"secondary","email":"abigail.spiers@us.af.mil","phone":"3256963862"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"2946120541a34c9ea319ada79e61bb63","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"ba79329aaafc4a0ebf047ea1a60a5a8b","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-18T01:35:52.126241556Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"c558e51a98eafa51835c4498e56c17e1-29\"","fetched_at":"2026-09-17T03:34:20.822145964Z","row_sha256":"541519dde43a451b4e8eac4945bfa041994a0d6b51d2376c22874515b393c4b3","last_modified":"2026-09-17T03:30:47Z"},"updated_at":"2026-09-18T01:35:52.126241556Z","first_seen_at":"2026-09-15T22:52:52.472456Z"},"description":{"html":"<p>1.&nbsp;<strong>Action Code:</strong>&nbsp;This is a Pre-Solicitation notice.</p>\n\n<p>2.&nbsp;<strong>Date:</strong>&nbsp;18 August 2026</p>\n\n<p>3.&nbsp;<strong>PSC Code:</strong>&nbsp;Y1BZ -&nbsp; Construction of other Airfield Structures</p>\n\n<p>4.&nbsp;<strong>Subject Title:&nbsp;</strong>Construction of Apron Blast Shield, Dyess AFB, TX</p>\n\n<p>5.&nbsp;<strong>Solicitation Number:</strong>&nbsp;FA466126R0008</p>\n\n<p>6.<strong> Important</strong>: This notice&nbsp;<strong><u>does not</u></strong>&nbsp;constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to provide the pre-solicitation notice required by Revolutionary FAR Overhaul (RFO) 5.101, Presolicitation Notice in preparation for release of the Request for Proposal (RFP) on a later date.</p>\n\n<p>7.&nbsp;<strong>Description:</strong>&nbsp;The RFP for this project is&nbsp;<strong>expected</strong>&nbsp;to be issued on or about middle of September 2026. The Proposal due date is planned on or about, end of October 2026. The North American Industry Code Standard (NAICS) is NAICS 238120 Structural Steel and Precast Concrete Contractors, and the size standard is $19M.&nbsp; The planned procurement method is contracting by Lowest Price Technically Acceptable (LPTA).&nbsp; The resulting contract is planned to be a firm-fixed price (FFP) contract for the work described in the Statement of Work which is attached and will be provided with the solicitation.</p>\n\n<p>Dyess AFB is seeking the construction of blast deflector fenses for the B1-Bomber. Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences.&nbsp;All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL&rsquo;s), and all applicable Federal, State and local regulations/codes.&nbsp;The blast fence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.</p>\n\n<p>8.&nbsp;<strong>Place of Contract Performance:</strong>&nbsp;Dyess AFB, Texas.</p>\n\n<p>9.&nbsp;<strong>Set Aside Status:</strong>&nbsp;This will an 100% Small Business Set Aside.</p>\n\n<p>Prospective Offerors must also be registered with the System for Award Management (SAM) at https://www.sam.gov in order to participate in this procurement. Interested parties can register under the Interested Vendors List at SAM.gov.</p>\n\n<p>10.&nbsp;<strong>Period of Performance (POP):</strong>&nbsp; The POP is estimated to be 60 days after the Notice to Proceed.</p>\n\n<p>Electronic files (PDFs of drawings/specs) are attached directly to the&nbsp;presolicitation notice for public access.</p>\n\n<p>No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests.</p>\n\n<p><strong>Notice to Offeror(s)/Supplier(s):</strong> Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this soliciation, either before or after the closing date. In the event the Government cancels this soliciation, the Government has no obligation to reimburse an offeror for any costs.</p>","text":"1. Action Code: This is a Pre-Solicitation notice.\n\n2. Date: 18 August 2026\n\n3. PSC Code: Y1BZ - Construction of other Airfield Structures\n\n4. Subject Title: Construction of Apron Blast Shield, Dyess AFB, TX\n\n5. Solicitation Number: FA466126R0008\n\n6. Important: This notice does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to provide the pre-solicitation notice required by Revolutionary FAR Overhaul (RFO) 5.101, Presolicitation Notice in preparation for release of the Request for Proposal (RFP) on a later date.\n\n7. Description: The RFP for this project is expected to be issued on or about middle of September 2026. The Proposal due date is planned on or about, end of October 2026. The North American Industry Code Standard (NAICS) is NAICS 238120 Structural Steel and Precast Concrete Contractors, and the size standard is $19M. The planned procurement method is contracting by Lowest Price Technically Acceptable (LPTA). The resulting contract is planned to be a firm-fixed price (FFP) contract for the work described in the Statement of Work which is attached and will be provided with the solicitation.\n\nDyess AFB is seeking the construction of blast deflector fenses for the B1-Bomber. Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences. All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL’s), and all applicable Federal, State and local regulations/codes. The blast fence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.\n\n8. Place of Contract Performance: Dyess AFB, Texas.\n\n9. Set Aside Status: This will an 100% Small Business Set Aside.\n\nProspective Offerors must also be registered with the System for Award Management (SAM) at https://www.sam.gov in order to participate in this procurement. Interested parties can register under the Interested Vendors List at SAM.gov.\n\n10. Period of Performance (POP): The POP is estimated to be 60 days after the Notice to Proceed.\n\nElectronic files (PDFs of drawings/specs) are attached directly to the presolicitation notice for public access.\n\nNo reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests.\n\nNotice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this soliciation, either before or after the closing date. In the event the Government cancels this soliciation, the Government has no obligation to reimburse an offeror for any costs.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"FA466126R0008","place_of_performance":{"zip":"79607","city":{"code":"TX-07","name":"Dyess AFB"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BZ"},{"dates":{"posted":"2026-09-18","posted_at":"2026-09-18T19:49:44.948Z","created_at":"2026-09-09T18:37:36.167Z","modified_at":"2026-09-18T19:49:44.951Z","response_deadline":{"raw":"2026-10-15T10:00:00-05:00","utc":"2026-10-15T15:00:00Z","date":"2026-10-15","time":"10:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/255eb9065b18475981b985fdeecd134d/view"},"naics":{"codes":["238120"],"primary":"238120"},"title":"Airfield Blast Shield","agency":{"office":{"code":"FA4661","name":"FA4661 7 CONS CD"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"79607-1581","city":"DYESS AFB","state":"TX","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"publication":"published","archive_date":"2026-10-30","archive_type":"auto15"},"history":[{"index":4,"title":"Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-18T19:49:44.948Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"255eb9065b18475981b985fdeecd134d","solicitation_number":"FA466126R0008","related_opportunity_id":"2946120541a34c9ea319ada79e61bb63"},{"index":3,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-18T20:54:42.027Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2946120541a34c9ea319ada79e61bb63","solicitation_number":"FA466126R0008","related_opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea"}],"contacts":[{"name":"James Lynch","role":"primary","email":"james.lynch.18@us.af.mil","phone":"3256961457"},{"name":"Traci Hughes","role":"secondary","email":"traci.hughes.1@us.af.mil","phone":"3256962272"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"255eb9065b18475981b985fdeecd134d","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"2946120541a34c9ea319ada79e61bb63","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-19T04:14:17.993421068Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"78877ff965423eb09bde96c377be8ada3653ab857641e5c6a53926b0021b0ee4","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-09-19T03:44:47.683076529Z"},"description":{"html":"<p>1.1 PROJECT DESCRIPTION:</p>\n\n<p>1.1.1 Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and<br />\nperforming all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B.<br />\nAll work shall comply with the contract specifications and shall be in accordance with the latest International<br />\nBuilding Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL&rsquo;s),<br />\nand all applicable Federal, State and local regulations/codes.</p>\n\n<p>2.1 GENERAL:</p>\n\n<p>2.1.1 The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations<br />\nrunning in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall be<br />\nconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectors<br />\nmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.<br />\nThe blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blast<br />\nfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle<br />\n90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.<br />\n2.1.2 Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul<br />\nRoute subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access.<br />\n2.1.3 Construction Storage Yard &amp; Contractor Limits: Contractor shall store all equipment and material within the<br />\ndesigned laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,<br />\nthe yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor<br />\nshall obtain approval for any project limits changes prior to construction commencement from 7 CES through the<br />\nContracting Officer. The approved laydown yard will be provided at the pre-construction meeting.<br />\n2.1.4 Contractor shall provide material submittals for all materials &amp; products used in the project on an AF Form<br />\n3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.<br />\n2.1.5 Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least<br />\none week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each<br />\nday, crew sizes, and work locations.</p>\n\n<p>3.1 BLAST DEFLECTOR CONTRUCTION:</p>\n\n<p>3.1.1 Structural frames which support the deflecting surface will be of structural shapes, rolled, punches, and<br />\nprefabricated for bolting together at site. Deflecting surface will be of galvanized corrugated steel with a minimum<br />\nof 2 oz. zinc coating per Fed. Spec. WW-P-00405. Sheets shall have a section modulus of not less than 0.0163 inches<br />\ncurbed per inch and shall be of corrosion resistant material with yield point in 50,000 psi range.<br />\n3.1.2 All bolts subject to blast temperatures shall be of SAE 1038 steel, heat treated. All nuts, except on anchor bolts,<br />\nshall be made of all-steel, self-locking type.</p>\n\n<p>4.1 BLAST DEFLECTOR ANCHORAGE</p>\n\n<p>4.1.1 Blast Deflectors shall be installed on existing concrete. Existing concrete has a minimum thickness of 16&rdquo;.<br />\nLynnco &quot;Epoxy-Locked&quot; anchors, with Lynnco No. 22 Epoxy Resin were used to lock in place the existing blast<br />\ndeflectors.</p>\n\n<p>5.1 BLAST DEFLECTOR ASSEMBLY:</p>\n\n<p>5.1.1 All components will be assembled by bolting together with flat washers, under heads and nuts. Welding, brazing<br />\nor burning of holes is not permitted. All nuts and bolts will be tightened to torques specified by manufacturer.</p>\n\n<p>6.1 BLAST DEFLECTOR FINISH:</p>\n\n<p>6.1.1 All bolts, nuts and washers will be cadmium or zinc plated. All structural<br />\nmembers, parts, and corrugated metal<br />\nwill be hot dip galvanized with a minimum coating of 2.0 oz. zinc per square foot of surface. Painting of galvanized<br />\nsurfaces is not required, but any galvanized surface badly scratched or marred, will be re-galvanized or otherwise<br />\nrepaired to the satisfaction of the Contracting Officer.<br />\n6.1.2 Contractor shall paint the corresponding aircraft parking position number on the front of the blast deflectors.<br />\nThe Contactor shall provide a 2&rsquo;x2&rsquo; number sign mounted 15&rsquo; above the concrete at the midpoint on the backside of<br />\nthe blast deflector. Markings/sign shall follow details 2 and 8 on sheet C2 of the attached drawings.</p>\n\n<p>7.1 BLAST DEFLECTOR ALTERNATIVES:</p>\n\n<p>7.1.1 At the option of the Contracting Officer, and as specified in Paragraph 2, the Contractor may substitute an<br />\nalternate type of blast deflector, providing that the following information and data is submitted, prior to the time of<br />\nbid opening and approved in writing.<br />\n7.1.2 Contractor will submit for approval a tabulation of results of full-scale instrumented field tests witnessed and<br />\ncertified by an accredited testing laboratory, in which proposed alternate is subject to the intermediate throttle power<br />\nof similar engines totaling # 30,000 afterburner thrust @ approx. 90 feet distance from the leading edge of the<br />\ndeflector measured along centerline of bast impingement. Tabulation must show the maximum pressure in psi,<br />\ntemperature in degrees F., vibration frequency in CPS, and vibration amplitude in inches, taken at the centerline of<br />\nblast impingement on deflector. The results of all such readings may not be greater than the readings submitted for<br />\nthe specified deflector, for each corresponding item.<br />\n7.1.3 Contractor must submit results of smoke-pot tests behind similar deflectors, demonstrating that smoke and<br />\ngases are deflected in a vertical direction, with no evidence of smoke dispersal behind deflectors.<br />\n7.1.4 Contractor must submit evidence of satisfactory operation for at least two (2) years in actual field service for<br />\ncontinued testing of similar aircraft and jet engines.<br />\n7.1.5 Contractor must submit detailed design analysis, showing loads and stresses in structural members, deflecting<br />\nsurface and bolted joints, using the maximum pressure measured in Paragraph 7.1.2, as the average pressure for load<br />\ncalculations. Welds subjected to tension or vibration may not be used; all bolts must be heat treated if subjected to<br />\nblast temperatures.<br />\n7.1.6 Because of thermal shock and cavitation effects, which results in cracking and spalling, concrete deflectors<br />\nmay not be used as an alternate. Perforated deflecting surfaces are not acceptable for this use.</p>","text":"1.1 PROJECT DESCRIPTION:\n\n1.1.1 Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and\n\nperforming all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B.\n\nAll work shall comply with the contract specifications and shall be in accordance with the latest International\n\nBuilding Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL’s),\n\nand all applicable Federal, State and local regulations/codes.\n\n2.1 GENERAL:\n\n2.1.1 The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations\n\nrunning in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall be\n\nconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectors\n\nmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.\n\nThe blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blast\n\nfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle\n\n90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.\n\n2.1.2 Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul\n\nRoute subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access.\n\n2.1.3 Construction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the\n\ndesigned laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,\n\nthe yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor\n\nshall obtain approval for any project limits changes prior to construction commencement from 7 CES through the\n\nContracting Officer. The approved laydown yard will be provided at the pre-construction meeting.\n\n2.1.4 Contractor shall provide material submittals for all materials & products used in the project on an AF Form\n\n3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.\n\n2.1.5 Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least\n\none week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each\n\nday, crew sizes, and work locations.\n\n3.1 BLAST DEFLECTOR CONTRUCTION:\n\n3.1.1 Structural frames which support the deflecting surface will be of structural shapes, rolled, punches, and\n\nprefabricated for bolting together at site. Deflecting surface will be of galvanized corrugated steel with a minimum\n\nof 2 oz. zinc coating per Fed. Spec. WW-P-00405. Sheets shall have a section modulus of not less than 0.0163 inches\n\ncurbed per inch and shall be of corrosion resistant material with yield point in 50,000 psi range.\n\n3.1.2 All bolts subject to blast temperatures shall be of SAE 1038 steel, heat treated. All nuts, except on anchor bolts,\n\nshall be made of all-steel, self-locking type.\n\n4.1 BLAST DEFLECTOR ANCHORAGE\n\n4.1.1 Blast Deflectors shall be installed on existing concrete. Existing concrete has a minimum thickness of 16”.\n\nLynnco \"Epoxy-Locked\" anchors, with Lynnco No. 22 Epoxy Resin were used to lock in place the existing blast\n\ndeflectors.\n\n5.1 BLAST DEFLECTOR ASSEMBLY:\n\n5.1.1 All components will be assembled by bolting together with flat washers, under heads and nuts. Welding, brazing\n\nor burning of holes is not permitted. All nuts and bolts will be tightened to torques specified by manufacturer.\n\n6.1 BLAST DEFLECTOR FINISH:\n\n6.1.1 All bolts, nuts and washers will be cadmium or zinc plated. All structural\n\nmembers, parts, and corrugated metal\n\nwill be hot dip galvanized with a minimum coating of 2.0 oz. zinc per square foot of surface. Painting of galvanized\n\nsurfaces is not required, but any galvanized surface badly scratched or marred, will be re-galvanized or otherwise\n\nrepaired to the satisfaction of the Contracting Officer.\n\n6.1.2 Contractor shall paint the corresponding aircraft parking position number on the front of the blast deflectors.\n\nThe Contactor shall provide a 2’x2’ number sign mounted 15’ above the concrete at the midpoint on the backside of\n\nthe blast deflector. Markings/sign shall follow details 2 and 8 on sheet C2 of the attached drawings.\n\n7.1 BLAST DEFLECTOR ALTERNATIVES:\n\n7.1.1 At the option of the Contracting Officer, and as specified in Paragraph 2, the Contractor may substitute an\n\nalternate type of blast deflector, providing that the following information and data is submitted, prior to the time of\n\nbid opening and approved in writing.\n\n7.1.2 Contractor will submit for approval a tabulation of results of full-scale instrumented field tests witnessed and\n\ncertified by an accredited testing laboratory, in which proposed alternate is subject to the intermediate throttle power\n\nof similar engines totaling # 30,000 afterburner thrust @ approx. 90 feet distance from the leading edge of the\n\ndeflector measured along centerline of bast impingement. Tabulation must show the maximum pressure in psi,\n\ntemperature in degrees F., vibration frequency in CPS, and vibration amplitude in inches, taken at the centerline of\n\nblast impingement on deflector. The results of all such readings may not be greater than the readings submitted for\n\nthe specified deflector, for each corresponding item.\n\n7.1.3 Contractor must submit results of smoke-pot tests behind similar deflectors, demonstrating that smoke and\n\ngases are deflected in a vertical direction, with no evidence of smoke dispersal behind deflectors.\n\n7.1.4 Contractor must submit evidence of satisfactory operation for at least two (2) years in actual field service for\n\ncontinued testing of similar aircraft and jet engines.\n\n7.1.5 Contractor must submit detailed design analysis, showing loads and stresses in structural members, deflecting\n\nsurface and bolted joints, using the maximum pressure measured in Paragraph 7.1.2, as the average pressure for load\n\ncalculations. Welds subjected to tension or vibration may not be used; all bolts must be heat treated if subjected to\n\nblast temperatures.\n\n7.1.6 Because of thermal shock and cavitation effects, which results in cracking and spalling, concrete deflectors\n\nmay not be used as an alternate. Perforated deflecting surfaces are not acceptable for this use.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA466126R0008","place_of_performance":{"zip":"79607","city":{"name":"Dyess AFB"},"state":{"code":"TX"},"country":{"code":"USA"}},"product_service_code":"Y1BZ"},{"dates":{"posted":"2026-10-13","posted_at":"2026-10-13T21:14:17.075Z","created_at":"2026-10-13T13:59:42.629Z","modified_at":"2026-10-13T21:14:17.078Z","response_deadline":{"raw":"2026-10-27T10:00:00-05:00","utc":"2026-10-27T15:00:00Z","date":"2026-10-27","time":"10:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4bb38cb2028845d9b1df70564dbd5f49/view"},"naics":{"codes":["238120"],"primary":"238120"},"title":"Airfield Blast Shield","agency":{"office":{"code":"FA4661","name":"FA4661 7 CONS CD"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"79607-1581","city":"DYESS AFB","state":"TX","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-11-11","archive_type":"auto15"},"history":[{"index":5,"title":"Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-13T21:14:17.075Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4bb38cb2028845d9b1df70564dbd5f49","solicitation_number":"FA466126R0008","parent_opportunity_id":"255eb9065b18475981b985fdeecd134d","related_opportunity_id":"2946120541a34c9ea319ada79e61bb63"},{"index":4,"title":"Airfield Blast Shield","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-18T19:49:44.948Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"255eb9065b18475981b985fdeecd134d","solicitation_number":"FA466126R0008","related_opportunity_id":"2946120541a34c9ea319ada79e61bb63"},{"index":3,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-18T20:54:42.027Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2946120541a34c9ea319ada79e61bb63","solicitation_number":"FA466126R0008","related_opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea"}],"contacts":[{"name":"James Lynch","role":"primary","email":"james.lynch.18@us.af.mil","phone":"3256961457"},{"name":"Traci Hughes","role":"secondary","email":"traci.hughes.1@us.af.mil","phone":"3256962272"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"4bb38cb2028845d9b1df70564dbd5f49","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"255eb9065b18475981b985fdeecd134d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-14T04:22:05.296335549Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"448c23b3ef5749a9456794e8eb22b5e507b27e7f07cff3b221cb18509a49468e","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-10-14T03:54:05.500072632Z"},"description":{"html":"<p><strong>Amendment 0001 (13 Oct 2026): The purpose of this amendment is to</strong></p>\n\n<p>&bull; Extend the Proposal Due Date to 27 October 2026.</p>\n\n<p>&bull; All other solicitation requirements remain unchanged and in full effect.</p>\n\n<p></p>\n\n<p>1.1 PROJECT DESCRIPTION:</p>\n\n<p>1.1.1 Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and<br />\nperforming all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B.<br />\nAll work shall comply with the contract specifications and shall be in accordance with the latest International<br />\nBuilding Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL&rsquo;s),<br />\nand all applicable Federal, State and local regulations/codes.</p>\n\n<p>2.1 GENERAL:</p>\n\n<p>2.1.1 The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations<br />\nrunning in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall be<br />\nconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectors<br />\nmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.<br />\nThe blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blast<br />\nfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle<br />\n90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.<br />\n2.1.2 Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul<br />\nRoute subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access.<br />\n2.1.3 Construction Storage Yard &amp; Contractor Limits: Contractor shall store all equipment and material within the<br />\ndesigned laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,<br />\nthe yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor<br />\nshall obtain approval for any project limits changes prior to construction commencement from 7 CES through the<br />\nContracting Officer. The approved laydown yard will be provided at the pre-construction meeting.<br />\n2.1.4 Contractor shall provide material submittals for all materials &amp; products used in the project on an AF Form<br />\n3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.<br />\n2.1.5 Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least<br />\none week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each<br />\nday, crew sizes, and work locations.</p>\n\n<p>3.1 BLAST DEFLECTOR CONTRUCTION:</p>\n\n<p>3.1.1 Structural frames which support the deflecting surface will be of structural shapes, rolled, punches, and<br />\nprefabricated for bolting together at site. Deflecting surface will be of galvanized corrugated steel with a minimum<br />\nof 2 oz. zinc coating per Fed. Spec. WW-P-00405. Sheets shall have a section modulus of not less than 0.0163 inches<br />\ncurbed per inch and shall be of corrosion resistant material with yield point in 50,000 psi range.<br />\n3.1.2 All bolts subject to blast temperatures shall be of SAE 1038 steel, heat treated. All nuts, except on anchor bolts,<br />\nshall be made of all-steel, self-locking type.</p>\n\n<p>4.1 BLAST DEFLECTOR ANCHORAGE</p>\n\n<p>4.1.1 Blast Deflectors shall be installed on existing concrete. Existing concrete has a minimum thickness of 16&rdquo;.<br />\nLynnco &quot;Epoxy-Locked&quot; anchors, with Lynnco No. 22 Epoxy Resin were used to lock in place the existing blast<br />\ndeflectors.</p>\n\n<p>5.1 BLAST DEFLECTOR ASSEMBLY:</p>\n\n<p>5.1.1 All components will be assembled by bolting together with flat washers, under heads and nuts. Welding, brazing<br />\nor burning of holes is not permitted. All nuts and bolts will be tightened to torques specified by manufacturer.</p>\n\n<p>6.1 BLAST DEFLECTOR FINISH:</p>\n\n<p>6.1.1 All bolts, nuts and washers will be cadmium or zinc plated. All structural<br />\nmembers, parts, and corrugated metal<br />\nwill be hot dip galvanized with a minimum coating of 2.0 oz. zinc per square foot of surface. Painting of galvanized<br />\nsurfaces is not required, but any galvanized surface badly scratched or marred, will be re-galvanized or otherwise<br />\nrepaired to the satisfaction of the Contracting Officer.<br />\n6.1.2 Contractor shall paint the corresponding aircraft parking position number on the front of the blast deflectors.<br />\nThe Contactor shall provide a 2&rsquo;x2&rsquo; number sign mounted 15&rsquo; above the concrete at the midpoint on the backside of<br />\nthe blast deflector. Markings/sign shall follow details 2 and 8 on sheet C2 of the attached drawings.</p>\n\n<p>7.1 BLAST DEFLECTOR ALTERNATIVES:</p>\n\n<p>7.1.1 At the option of the Contracting Officer, and as specified in Paragraph 2, the Contractor may substitute an<br />\nalternate type of blast deflector, providing that the following information and data is submitted, prior to the time of<br />\nbid opening and approved in writing.<br />\n7.1.2 Contractor will submit for approval a tabulation of results of full-scale instrumented field tests witnessed and<br />\ncertified by an accredited testing laboratory, in which proposed alternate is subject to the intermediate throttle power<br />\nof similar engines totaling # 30,000 afterburner thrust @ approx. 90 feet distance from the leading edge of the<br />\ndeflector measured along centerline of bast impingement. Tabulation must show the maximum pressure in psi,<br />\ntemperature in degrees F., vibration frequency in CPS, and vibration amplitude in inches, taken at the centerline of<br />\nblast impingement on deflector. The results of all such readings may not be greater than the readings submitted for<br />\nthe specified deflector, for each corresponding item.<br />\n7.1.3 Contractor must submit results of smoke-pot tests behind similar deflectors, demonstrating that smoke and<br />\ngases are deflected in a vertical direction, with no evidence of smoke dispersal behind deflectors.<br />\n7.1.4 Contractor must submit evidence of satisfactory operation for at least two (2) years in actual field service for<br />\ncontinued testing of similar aircraft and jet engines.<br />\n7.1.5 Contractor must submit detailed design analysis, showing loads and stresses in structural members, deflecting<br />\nsurface and bolted joints, using the maximum pressure measured in Paragraph 7.1.2, as the average pressure for load<br />\ncalculations. Welds subjected to tension or vibration may not be used; all bolts must be heat treated if subjected to<br />\nblast temperatures.<br />\n7.1.6 Because of thermal shock and cavitation effects, which results in cracking and spalling, concrete deflectors<br />\nmay not be used as an alternate. Perforated deflecting surfaces are not acceptable for this use.</p>","text":"Amendment 0001 (13 Oct 2026): The purpose of this amendment is to\n\n• Extend the Proposal Due Date to 27 October 2026.\n\n• All other solicitation requirements remain unchanged and in full effect.\n\n1.1 PROJECT DESCRIPTION:\n\n1.1.1 Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and\n\nperforming all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B.\n\nAll work shall comply with the contract specifications and shall be in accordance with the latest International\n\nBuilding Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL’s),\n\nand all applicable Federal, State and local regulations/codes.\n\n2.1 GENERAL:\n\n2.1.1 The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations\n\nrunning in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall be\n\nconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectors\n\nmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.\n\nThe blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blast\n\nfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle\n\n90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.\n\n2.1.2 Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul\n\nRoute subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access.\n\n2.1.3 Construction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the\n\ndesigned laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,\n\nthe yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor\n\nshall obtain approval for any project limits changes prior to construction commencement from 7 CES through the\n\nContracting Officer. The approved laydown yard will be provided at the pre-construction meeting.\n\n2.1.4 Contractor shall provide material submittals for all materials & products used in the project on an AF Form\n\n3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.\n\n2.1.5 Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least\n\none week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each\n\nday, crew sizes, and work locations.\n\n3.1 BLAST DEFLECTOR CONTRUCTION:\n\n3.1.1 Structural frames which support the deflecting surface will be of structural shapes, rolled, punches, and\n\nprefabricated for bolting together at site. Deflecting surface will be of galvanized corrugated steel with a minimum\n\nof 2 oz. zinc coating per Fed. Spec. WW-P-00405. Sheets shall have a section modulus of not less than 0.0163 inches\n\ncurbed per inch and shall be of corrosion resistant material with yield point in 50,000 psi range.\n\n3.1.2 All bolts subject to blast temperatures shall be of SAE 1038 steel, heat treated. All nuts, except on anchor bolts,\n\nshall be made of all-steel, self-locking type.\n\n4.1 BLAST DEFLECTOR ANCHORAGE\n\n4.1.1 Blast Deflectors shall be installed on existing concrete. Existing concrete has a minimum thickness of 16”.\n\nLynnco \"Epoxy-Locked\" anchors, with Lynnco No. 22 Epoxy Resin were used to lock in place the existing blast\n\ndeflectors.\n\n5.1 BLAST DEFLECTOR ASSEMBLY:\n\n5.1.1 All components will be assembled by bolting together with flat washers, under heads and nuts. Welding, brazing\n\nor burning of holes is not permitted. All nuts and bolts will be tightened to torques specified by manufacturer.\n\n6.1 BLAST DEFLECTOR FINISH:\n\n6.1.1 All bolts, nuts and washers will be cadmium or zinc plated. All structural\n\nmembers, parts, and corrugated metal\n\nwill be hot dip galvanized with a minimum coating of 2.0 oz. zinc per square foot of surface. Painting of galvanized\n\nsurfaces is not required, but any galvanized surface badly scratched or marred, will be re-galvanized or otherwise\n\nrepaired to the satisfaction of the Contracting Officer.\n\n6.1.2 Contractor shall paint the corresponding aircraft parking position number on the front of the blast deflectors.\n\nThe Contactor shall provide a 2’x2’ number sign mounted 15’ above the concrete at the midpoint on the backside of\n\nthe blast deflector. Markings/sign shall follow details 2 and 8 on sheet C2 of the attached drawings.\n\n7.1 BLAST DEFLECTOR ALTERNATIVES:\n\n7.1.1 At the option of the Contracting Officer, and as specified in Paragraph 2, the Contractor may substitute an\n\nalternate type of blast deflector, providing that the following information and data is submitted, prior to the time of\n\nbid opening and approved in writing.\n\n7.1.2 Contractor will submit for approval a tabulation of results of full-scale instrumented field tests witnessed and\n\ncertified by an accredited testing laboratory, in which proposed alternate is subject to the intermediate throttle power\n\nof similar engines totaling # 30,000 afterburner thrust @ approx. 90 feet distance from the leading edge of the\n\ndeflector measured along centerline of bast impingement. Tabulation must show the maximum pressure in psi,\n\ntemperature in degrees F., vibration frequency in CPS, and vibration amplitude in inches, taken at the centerline of\n\nblast impingement on deflector. The results of all such readings may not be greater than the readings submitted for\n\nthe specified deflector, for each corresponding item.\n\n7.1.3 Contractor must submit results of smoke-pot tests behind similar deflectors, demonstrating that smoke and\n\ngases are deflected in a vertical direction, with no evidence of smoke dispersal behind deflectors.\n\n7.1.4 Contractor must submit evidence of satisfactory operation for at least two (2) years in actual field service for\n\ncontinued testing of similar aircraft and jet engines.\n\n7.1.5 Contractor must submit detailed design analysis, showing loads and stresses in structural members, deflecting\n\nsurface and bolted joints, using the maximum pressure measured in Paragraph 7.1.2, as the average pressure for load\n\ncalculations. Welds subjected to tension or vibration may not be used; all bolts must be heat treated if subjected to\n\nblast temperatures.\n\n7.1.6 Because of thermal shock and cavitation effects, which results in cracking and spalling, concrete deflectors\n\nmay not be used as an alternate. Perforated deflecting surfaces are not acceptable for this use.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA466126R0008","place_of_performance":{"zip":"79607","city":{"code":"TX-07","name":"Dyess AFB"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BZ"},{"dates":{"posted":"2026-10-16","posted_at":"2026-10-16T19:09:09.952Z","created_at":"2026-10-15T15:40:27.301Z","modified_at":"2026-10-16T19:09:09.956Z","response_deadline":{"raw":"2026-10-27T10:00:00-05:00","utc":"2026-10-27T15:00:00Z","date":"2026-10-27","time":"10:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/53e4c88753fc408d949f29d55a8f2798/view"},"naics":{"codes":["238120"],"primary":"238120"},"title":"Airfield Blast Shield","agency":{"office":{"code":"FA4661","name":"FA4661 7 CONS CD"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"79607-1581","city":"DYESS AFB","state":"TX","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-11-11","archive_type":"auto15"},"history":[{"index":6,"title":"Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-16T19:09:09.952Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53e4c88753fc408d949f29d55a8f2798","solicitation_number":"FA466126R0008","parent_opportunity_id":"255eb9065b18475981b985fdeecd134d","related_opportunity_id":"2946120541a34c9ea319ada79e61bb63"},{"index":5,"title":"Airfield Blast Shield","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-13T21:14:17.075Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4bb38cb2028845d9b1df70564dbd5f49","solicitation_number":"FA466126R0008","parent_opportunity_id":"255eb9065b18475981b985fdeecd134d","related_opportunity_id":"2946120541a34c9ea319ada79e61bb63"},{"index":4,"title":"Airfield Blast Shield","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-18T19:49:44.948Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"255eb9065b18475981b985fdeecd134d","solicitation_number":"FA466126R0008","related_opportunity_id":"2946120541a34c9ea319ada79e61bb63"},{"index":3,"title":"Construction Airfield Blast Shield","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-18T20:54:42.027Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2946120541a34c9ea319ada79e61bb63","solicitation_number":"FA466126R0008","related_opportunity_id":"ca1619a1576b4c85970aa23b7bc5d0ea"}],"contacts":[{"name":"James Lynch","role":"primary","email":"james.lynch.18@us.af.mil","phone":"3256961457"},{"name":"Traci Hughes","role":"secondary","email":"traci.hughes.1@us.af.mil","phone":"3256962272"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"53e4c88753fc408d949f29d55a8f2798","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"255eb9065b18475981b985fdeecd134d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-17T04:06:50.170735620Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"45f5f84422ac664dbaa4a4e82901cfd2099e1bed04321de561c4bace2a2afd63","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-10-17T03:46:55.913926114Z"},"description":{"html":"<p><strong>Amendment 0002 (16 Oct 2026)</strong>&nbsp;<strong>The purpose of this amendment is to:</strong></p>\n\n<p>1. Incorporate the attached Questions and Answers (Q&amp;A) document providing Government responses to submitted solicitation questions.</p>\n\n<p>2. All other solicitation requirements remain unchanged and in full effect.</p>\n\n<p><strong>Amendment 0001 (13 Oct 2026): The purpose of this amendment is to</strong></p>\n\n<p>1. Extend the Proposal Due Date to 27 October 2026.</p>\n\n<p>2. All other solicitation requirements remain unchanged and in full effect.</p>\n\n<p></p>\n\n<p>1.1 PROJECT DESCRIPTION:</p>\n\n<p>1.1.1 Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and<br />\nperforming all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B.<br />\nAll work shall comply with the contract specifications and shall be in accordance with the latest International<br />\nBuilding Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL&rsquo;s),<br />\nand all applicable Federal, State and local regulations/codes.</p>\n\n<p>2.1 GENERAL:</p>\n\n<p>2.1.1 The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations<br />\nrunning in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall be<br />\nconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectors<br />\nmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.<br />\nThe blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blast<br />\nfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle<br />\n90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.<br />\n2.1.2 Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul<br />\nRoute subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access.<br />\n2.1.3 Construction Storage Yard &amp; Contractor Limits: Contractor shall store all equipment and material within the<br />\ndesigned laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,<br />\nthe yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor<br />\nshall obtain approval for any project limits changes prior to construction commencement from 7 CES through the<br />\nContracting Officer. The approved laydown yard will be provided at the pre-construction meeting.<br />\n2.1.4 Contractor shall provide material submittals for all materials &amp; products used in the project on an AF Form<br />\n3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.<br />\n2.1.5 Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least<br />\none week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each<br />\nday, crew sizes, and work locations.</p>\n\n<p>3.1 BLAST DEFLECTOR CONTRUCTION:</p>\n\n<p>3.1.1 Structural frames which support the deflecting surface will be of structural shapes, rolled, punches, and<br />\nprefabricated for bolting together at site. Deflecting surface will be of galvanized corrugated steel with a minimum<br />\nof 2 oz. zinc coating per Fed. Spec. WW-P-00405. Sheets shall have a section modulus of not less than 0.0163 inches<br />\ncurbed per inch and shall be of corrosion resistant material with yield point in 50,000 psi range.<br />\n3.1.2 All bolts subject to blast temperatures shall be of SAE 1038 steel, heat treated. All nuts, except on anchor bolts,<br />\nshall be made of all-steel, self-locking type.</p>\n\n<p>4.1 BLAST DEFLECTOR ANCHORAGE</p>\n\n<p>4.1.1 Blast Deflectors shall be installed on existing concrete. Existing concrete has a minimum thickness of 16&rdquo;.<br />\nLynnco &quot;Epoxy-Locked&quot; anchors, with Lynnco No. 22 Epoxy Resin were used to lock in place the existing blast<br />\ndeflectors.</p>\n\n<p>5.1 BLAST DEFLECTOR ASSEMBLY:</p>\n\n<p>5.1.1 All components will be assembled by bolting together with flat washers, under heads and nuts. Welding, brazing<br />\nor burning of holes is not permitted. All nuts and bolts will be tightened to torques specified by manufacturer.</p>\n\n<p>6.1 BLAST DEFLECTOR FINISH:</p>\n\n<p>6.1.1 All bolts, nuts and washers will be cadmium or zinc plated. All structural<br />\nmembers, parts, and corrugated metal<br />\nwill be hot dip galvanized with a minimum coating of 2.0 oz. zinc per square foot of surface. Painting of galvanized<br />\nsurfaces is not required, but any galvanized surface badly scratched or marred, will be re-galvanized or otherwise<br />\nrepaired to the satisfaction of the Contracting Officer.<br />\n6.1.2 Contractor shall paint the corresponding aircraft parking position number on the front of the blast deflectors.<br />\nThe Contactor shall provide a 2&rsquo;x2&rsquo; number sign mounted 15&rsquo; above the concrete at the midpoint on the backside of<br />\nthe blast deflector. Markings/sign shall follow details 2 and 8 on sheet C2 of the attached drawings.</p>\n\n<p>7.1 BLAST DEFLECTOR ALTERNATIVES:</p>\n\n<p>7.1.1 At the option of the Contracting Officer, and as specified in Paragraph 2, the Contractor may substitute an<br />\nalternate type of blast deflector, providing that the following information and data is submitted, prior to the time of<br />\nbid opening and approved in writing.<br />\n7.1.2 Contractor will submit for approval a tabulation of results of full-scale instrumented field tests witnessed and<br />\ncertified by an accredited testing laboratory, in which proposed alternate is subject to the intermediate throttle power<br />\nof similar engines totaling # 30,000 afterburner thrust @ approx. 90 feet distance from the leading edge of the<br />\ndeflector measured along centerline of bast impingement. Tabulation must show the maximum pressure in psi,<br />\ntemperature in degrees F., vibration frequency in CPS, and vibration amplitude in inches, taken at the centerline of<br />\nblast impingement on deflector. The results of all such readings may not be greater than the readings submitted for<br />\nthe specified deflector, for each corresponding item.<br />\n7.1.3 Contractor must submit results of smoke-pot tests behind similar deflectors, demonstrating that smoke and<br />\ngases are deflected in a vertical direction, with no evidence of smoke dispersal behind deflectors.<br />\n7.1.4 Contractor must submit evidence of satisfactory operation for at least two (2) years in actual field service for<br />\ncontinued testing of similar aircraft and jet engines.<br />\n7.1.5 Contractor must submit detailed design analysis, showing loads and stresses in structural members, deflecting<br />\nsurface and bolted joints, using the maximum pressure measured in Paragraph 7.1.2, as the average pressure for load<br />\ncalculations. Welds subjected to tension or vibration may not be used; all bolts must be heat treated if subjected to<br />\nblast temperatures.<br />\n7.1.6 Because of thermal shock and cavitation effects, which results in cracking and spalling, concrete deflectors<br />\nmay not be used as an alternate. Perforated deflecting surfaces are not acceptable for this use.</p>","text":"Amendment 0002 (16 Oct 2026) The purpose of this amendment is to:\n\n1. Incorporate the attached Questions and Answers (Q&A) document providing Government responses to submitted solicitation questions.\n\n2. All other solicitation requirements remain unchanged and in full effect.\n\nAmendment 0001 (13 Oct 2026): The purpose of this amendment is to\n\n1. Extend the Proposal Due Date to 27 October 2026.\n\n2. All other solicitation requirements remain unchanged and in full effect.\n\n1.1 PROJECT DESCRIPTION:\n\n1.1.1 Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and\n\nperforming all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B.\n\nAll work shall comply with the contract specifications and shall be in accordance with the latest International\n\nBuilding Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL’s),\n\nand all applicable Federal, State and local regulations/codes.\n\n2.1 GENERAL:\n\n2.1.1 The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations\n\nrunning in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall be\n\nconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectors\n\nmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.\n\nThe blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blast\n\nfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle\n\n90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.\n\n2.1.2 Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul\n\nRoute subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access.\n\n2.1.3 Construction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the\n\ndesigned laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,\n\nthe yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor\n\nshall obtain approval for any project limits changes prior to construction commencement from 7 CES through the\n\nContracting Officer. The approved laydown yard will be provided at the pre-construction meeting.\n\n2.1.4 Contractor shall provide material submittals for all materials & products used in the project on an AF Form\n\n3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.\n\n2.1.5 Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least\n\none week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each\n\nday, crew sizes, and work locations.\n\n3.1 BLAST DEFLECTOR CONTRUCTION:\n\n3.1.1 Structural frames which support the deflecting surface will be of structural shapes, rolled, punches, and\n\nprefabricated for bolting together at site. Deflecting surface will be of galvanized corrugated steel with a minimum\n\nof 2 oz. zinc coating per Fed. Spec. WW-P-00405. Sheets shall have a section modulus of not less than 0.0163 inches\n\ncurbed per inch and shall be of corrosion resistant material with yield point in 50,000 psi range.\n\n3.1.2 All bolts subject to blast temperatures shall be of SAE 1038 steel, heat treated. All nuts, except on anchor bolts,\n\nshall be made of all-steel, self-locking type.\n\n4.1 BLAST DEFLECTOR ANCHORAGE\n\n4.1.1 Blast Deflectors shall be installed on existing concrete. Existing concrete has a minimum thickness of 16”.\n\nLynnco \"Epoxy-Locked\" anchors, with Lynnco No. 22 Epoxy Resin were used to lock in place the existing blast\n\ndeflectors.\n\n5.1 BLAST DEFLECTOR ASSEMBLY:\n\n5.1.1 All components will be assembled by bolting together with flat washers, under heads and nuts. Welding, brazing\n\nor burning of holes is not permitted. All nuts and bolts will be tightened to torques specified by manufacturer.\n\n6.1 BLAST DEFLECTOR FINISH:\n\n6.1.1 All bolts, nuts and washers will be cadmium or zinc plated. All structural\n\nmembers, parts, and corrugated metal\n\nwill be hot dip galvanized with a minimum coating of 2.0 oz. zinc per square foot of surface. Painting of galvanized\n\nsurfaces is not required, but any galvanized surface badly scratched or marred, will be re-galvanized or otherwise\n\nrepaired to the satisfaction of the Contracting Officer.\n\n6.1.2 Contractor shall paint the corresponding aircraft parking position number on the front of the blast deflectors.\n\nThe Contactor shall provide a 2’x2’ number sign mounted 15’ above the concrete at the midpoint on the backside of\n\nthe blast deflector. Markings/sign shall follow details 2 and 8 on sheet C2 of the attached drawings.\n\n7.1 BLAST DEFLECTOR ALTERNATIVES:\n\n7.1.1 At the option of the Contracting Officer, and as specified in Paragraph 2, the Contractor may substitute an\n\nalternate type of blast deflector, providing that the following information and data is submitted, prior to the time of\n\nbid opening and approved in writing.\n\n7.1.2 Contractor will submit for approval a tabulation of results of full-scale instrumented field tests witnessed and\n\ncertified by an accredited testing laboratory, in which proposed alternate is subject to the intermediate throttle power\n\nof similar engines totaling # 30,000 afterburner thrust @ approx. 90 feet distance from the leading edge of the\n\ndeflector measured along centerline of bast impingement. Tabulation must show the maximum pressure in psi,\n\ntemperature in degrees F., vibration frequency in CPS, and vibration amplitude in inches, taken at the centerline of\n\nblast impingement on deflector. The results of all such readings may not be greater than the readings submitted for\n\nthe specified deflector, for each corresponding item.\n\n7.1.3 Contractor must submit results of smoke-pot tests behind similar deflectors, demonstrating that smoke and\n\ngases are deflected in a vertical direction, with no evidence of smoke dispersal behind deflectors.\n\n7.1.4 Contractor must submit evidence of satisfactory operation for at least two (2) years in actual field service for\n\ncontinued testing of similar aircraft and jet engines.\n\n7.1.5 Contractor must submit detailed design analysis, showing loads and stresses in structural members, deflecting\n\nsurface and bolted joints, using the maximum pressure measured in Paragraph 7.1.2, as the average pressure for load\n\ncalculations. Welds subjected to tension or vibration may not be used; all bolts must be heat treated if subjected to\n\nblast temperatures.\n\n7.1.6 Because of thermal shock and cavitation effects, which results in cracking and spalling, concrete deflectors\n\nmay not be used as an alternate. Perforated deflecting surfaces are not acceptable for this use.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA466126R0008","place_of_performance":{"zip":"79607","city":{"code":"TX-07","name":"Dyess AFB"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BZ"}],"due_at":"2026-10-27T15:00:00Z","due_date":"2026-10-27","closes_at":"2026-10-27T15:00:00Z","awardable":true,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4661","office_name":"FA4661 7 CONS CD","state":"TX","county":"48441","county_name":"Taylor County","city":"4801000","city_name":"Abilene","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-12T05:40:07.795201Z","principal_notice_id":"53e4c88753fc408d949f29d55a8f2798","description":{"text":"Amendment 0002 (16 Oct 2026) The purpose of this amendment is to:\n\n1. Incorporate the attached Questions and Answers (Q&A) document providing Government responses to submitted solicitation questions.\n\n2. All other solicitation requirements remain unchanged and in full effect.\n\nAmendment 0001 (13 Oct 2026): The purpose of this amendment is to\n\n1. Extend the Proposal Due Date to 27 October 2026.\n\n2. All other solicitation requirements remain unchanged and in full effect.\n\n1.1 PROJECT DESCRIPTION:\n\n1.1.1 Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and\n\nperforming all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B.\n\nAll work shall comply with the contract specifications and shall be in accordance with the latest International\n\nBuilding Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL’s),\n\nand all applicable Federal, State and local regulations/codes.\n\n2.1 GENERAL:\n\n2.1.1 The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations\n\nrunning in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall be\n\nconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectors\n\nmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.\n\nThe blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blast\n\nfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle\n\n90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.\n\n2.1.2 Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul\n\nRoute subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access.\n\n2.1.3 Construction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the\n\ndesigned laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,\n\nthe yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor\n\nshall obtain approval for any project limits changes prior to construction commencement from 7 CES through the\n\nContracting Officer. The approved laydown yard will be provided at the pre-construction meeting.\n\n2.1.4 Contractor shall provide material submittals for all materials & products used in the project on an AF Form\n\n3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.\n\n2.1.5 Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least\n\none week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each\n\nday, crew sizes, and work locations.\n\n3.1 BLAST DEFLECTOR CONTRUCTION:\n\n3.1.1 Structural frames which support the deflecting surface will be of structural shapes, rolled, punches, and\n\nprefabricated for bolting together at site. Deflecting surface will be of galvanized corrugated steel with a minimum\n\nof 2 oz. zinc coating per Fed. Spec. WW-P-00405. Sheets shall have a section modulus of not less than 0.0163 inches\n\ncurbed per inch and shall be of corrosion resistant material with yield point in 50,000 psi range.\n\n3.1.2 All bolts subject to blast temperatures shall be of SAE 1038 steel, heat treated. All nuts, except on anchor bolts,\n\nshall be made of all-steel, self-locking type.\n\n4.1 BLAST DEFLECTOR ANCHORAGE\n\n4.1.1 Blast Deflectors shall be installed on existing concrete. Existing concrete has a minimum thickness of 16”.\n\nLynnco \"Epoxy-Locked\" anchors, with Lynnco No. 22 Epoxy Resin were used to lock in place the existing blast\n\ndeflectors.\n\n5.1 BLAST DEFLECTOR ASSEMBLY:\n\n5.1.1 All components will be assembled by bolting together with flat washers, under heads and nuts. Welding, brazing\n\nor burning of holes is not permitted. All nuts and bolts will be tightened to torques specified by manufacturer.\n\n6.1 BLAST DEFLECTOR FINISH:\n\n6.1.1 All bolts, nuts and washers will be cadmium or zinc plated. All structural\n\nmembers, parts, and corrugated metal\n\nwill be hot dip galvanized with a minimum coating of 2.0 oz. zinc per square foot of surface. Painting of galvanized\n\nsurfaces is not required, but any galvanized surface badly scratched or marred, will be re-galvanized or otherwise\n\nrepaired to the satisfaction of the Contracting Officer.\n\n6.1.2 Contractor shall paint the corresponding aircraft parking position number on the front of the blast deflectors.\n\nThe Contactor shall provide a 2’x2’ number sign mounted 15’ above the concrete at the midpoint on the backside of\n\nthe blast deflector. Markings/sign shall follow details 2 and 8 on sheet C2 of the attached drawings.\n\n7.1 BLAST DEFLECTOR ALTERNATIVES:\n\n7.1.1 At the option of the Contracting Officer, and as specified in Paragraph 2, the Contractor may substitute an\n\nalternate type of blast deflector, providing that the following information and data is submitted, prior to the time of\n\nbid opening and approved in writing.\n\n7.1.2 Contractor will submit for approval a tabulation of results of full-scale instrumented field tests witnessed and\n\ncertified by an accredited testing laboratory, in which proposed alternate is subject to the intermediate throttle power\n\nof similar engines totaling # 30,000 afterburner thrust @ approx. 90 feet distance from the leading edge of the\n\ndeflector measured along centerline of bast impingement. Tabulation must show the maximum pressure in psi,\n\ntemperature in degrees F., vibration frequency in CPS, and vibration amplitude in inches, taken at the centerline of\n\nblast impingement on deflector. The results of all such readings may not be greater than the readings submitted for\n\nthe specified deflector, for each corresponding item.\n\n7.1.3 Contractor must submit results of smoke-pot tests behind similar deflectors, demonstrating that smoke and\n\ngases are deflected in a vertical direction, with no evidence of smoke dispersal behind deflectors.\n\n7.1.4 Contractor must submit evidence of satisfactory operation for at least two (2) years in actual field service for\n\ncontinued testing of similar aircraft and jet engines.\n\n7.1.5 Contractor must submit detailed design analysis, showing loads and stresses in structural members, deflecting\n\nsurface and bolted joints, using the maximum pressure measured in Paragraph 7.1.2, as the average pressure for load\n\ncalculations. Welds subjected to tension or vibration may not be used; all bolts must be heat treated if subjected to\n\nblast temperatures.\n\n7.1.6 Because of thermal shock and cavitation effects, which results in cracking and spalling, concrete deflectors\n\nmay not be used as an alternate. Perforated deflecting surfaces are not acceptable for this use.","html":"<p><strong>Amendment 0002 (16 Oct 2026)</strong>&nbsp;<strong>The purpose of this amendment is to:</strong></p>\n\n<p>1. Incorporate the attached Questions and Answers (Q&amp;A) document providing Government responses to submitted solicitation questions.</p>\n\n<p>2. All other solicitation requirements remain unchanged and in full effect.</p>\n\n<p><strong>Amendment 0001 (13 Oct 2026): The purpose of this amendment is to</strong></p>\n\n<p>1. Extend the Proposal Due Date to 27 October 2026.</p>\n\n<p>2. All other solicitation requirements remain unchanged and in full effect.</p>\n\n<p></p>\n\n<p>1.1 PROJECT DESCRIPTION:</p>\n\n<p>1.1.1 Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and<br />\nperforming all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B.<br />\nAll work shall comply with the contract specifications and shall be in accordance with the latest International<br />\nBuilding Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL&rsquo;s),<br />\nand all applicable Federal, State and local regulations/codes.</p>\n\n<p>2.1 GENERAL:</p>\n\n<p>2.1.1 The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations<br />\nrunning in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall be<br />\nconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectors<br />\nmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.<br />\nThe blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blast<br />\nfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle<br />\n90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.<br />\n2.1.2 Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul<br />\nRoute subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access.<br />\n2.1.3 Construction Storage Yard &amp; Contractor Limits: Contractor shall store all equipment and material within the<br />\ndesigned laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,<br />\nthe yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor<br />\nshall obtain approval for any project limits changes prior to construction commencement from 7 CES through the<br />\nContracting Officer. The approved laydown yard will be provided at the pre-construction meeting.<br />\n2.1.4 Contractor shall provide material submittals for all materials &amp; products used in the project on an AF Form<br />\n3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.<br />\n2.1.5 Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least<br />\none week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each<br />\nday, crew sizes, and work locations.</p>\n\n<p>3.1 BLAST DEFLECTOR CONTRUCTION:</p>\n\n<p>3.1.1 Structural frames which support the deflecting surface will be of structural shapes, rolled, punches, and<br />\nprefabricated for bolting together at site. Deflecting surface will be of galvanized corrugated steel with a minimum<br />\nof 2 oz. zinc coating per Fed. Spec. WW-P-00405. Sheets shall have a section modulus of not less than 0.0163 inches<br />\ncurbed per inch and shall be of corrosion resistant material with yield point in 50,000 psi range.<br />\n3.1.2 All bolts subject to blast temperatures shall be of SAE 1038 steel, heat treated. All nuts, except on anchor bolts,<br />\nshall be made of all-steel, self-locking type.</p>\n\n<p>4.1 BLAST DEFLECTOR ANCHORAGE</p>\n\n<p>4.1.1 Blast Deflectors shall be installed on existing concrete. Existing concrete has a minimum thickness of 16&rdquo;.<br />\nLynnco &quot;Epoxy-Locked&quot; anchors, with Lynnco No. 22 Epoxy Resin were used to lock in place the existing blast<br />\ndeflectors.</p>\n\n<p>5.1 BLAST DEFLECTOR ASSEMBLY:</p>\n\n<p>5.1.1 All components will be assembled by bolting together with flat washers, under heads and nuts. Welding, brazing<br />\nor burning of holes is not permitted. All nuts and bolts will be tightened to torques specified by manufacturer.</p>\n\n<p>6.1 BLAST DEFLECTOR FINISH:</p>\n\n<p>6.1.1 All bolts, nuts and washers will be cadmium or zinc plated. All structural<br />\nmembers, parts, and corrugated metal<br />\nwill be hot dip galvanized with a minimum coating of 2.0 oz. zinc per square foot of surface. Painting of galvanized<br />\nsurfaces is not required, but any galvanized surface badly scratched or marred, will be re-galvanized or otherwise<br />\nrepaired to the satisfaction of the Contracting Officer.<br />\n6.1.2 Contractor shall paint the corresponding aircraft parking position number on the front of the blast deflectors.<br />\nThe Contactor shall provide a 2&rsquo;x2&rsquo; number sign mounted 15&rsquo; above the concrete at the midpoint on the backside of<br />\nthe blast deflector. Markings/sign shall follow details 2 and 8 on sheet C2 of the attached drawings.</p>\n\n<p>7.1 BLAST DEFLECTOR ALTERNATIVES:</p>\n\n<p>7.1.1 At the option of the Contracting Officer, and as specified in Paragraph 2, the Contractor may substitute an<br />\nalternate type of blast deflector, providing that the following information and data is submitted, prior to the time of<br />\nbid opening and approved in writing.<br />\n7.1.2 Contractor will submit for approval a tabulation of results of full-scale instrumented field tests witnessed and<br />\ncertified by an accredited testing laboratory, in which proposed alternate is subject to the intermediate throttle power<br />\nof similar engines totaling # 30,000 afterburner thrust @ approx. 90 feet distance from the leading edge of the<br />\ndeflector measured along centerline of bast impingement. Tabulation must show the maximum pressure in psi,<br />\ntemperature in degrees F., vibration frequency in CPS, and vibration amplitude in inches, taken at the centerline of<br />\nblast impingement on deflector. The results of all such readings may not be greater than the readings submitted for<br />\nthe specified deflector, for each corresponding item.<br />\n7.1.3 Contractor must submit results of smoke-pot tests behind similar deflectors, demonstrating that smoke and<br />\ngases are deflected in a vertical direction, with no evidence of smoke dispersal behind deflectors.<br />\n7.1.4 Contractor must submit evidence of satisfactory operation for at least two (2) years in actual field service for<br />\ncontinued testing of similar aircraft and jet engines.<br />\n7.1.5 Contractor must submit detailed design analysis, showing loads and stresses in structural members, deflecting<br />\nsurface and bolted joints, using the maximum pressure measured in Paragraph 7.1.2, as the average pressure for load<br />\ncalculations. Welds subjected to tension or vibration may not be used; all bolts must be heat treated if subjected to<br />\nblast temperatures.<br />\n7.1.6 Because of thermal shock and cavitation effects, which results in cracking and spalling, concrete deflectors<br />\nmay not be used as an alternate. Perforated deflecting surfaces are not acceptable for this use.</p>","origin":"detail"},"contacts":[{"name":"James Lynch","role":"primary","email":"james.lynch.18@us.af.mil","phone":"3256961457"},{"name":"Traci Hughes","role":"secondary","email":"traci.hughes.1@us.af.mil","phone":"3256962272"}],"place_of_performance":{"zip":"79607","city":{"code":"TX-07","name":"Dyess AFB"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"79607-1581","city":"DYESS AFB","state":"TX","country":"USA"},"naics_codes":["238120"],"award":null,"attachments":[{"resource_id":"01458e2ec5554ccd97e1243dc660c4f4","name":"FNWZ 25-0166 South Apron Blast Shields_SoW_Redacted.pdf","kind":"file","mime_type":".pdf","size_bytes":358321,"posted_at":"2026-08-05T21:01:53.414Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/01458e2ec5554ccd97e1243dc660c4f4/download","mirrored":false},{"resource_id":"6cbb7cffe45f4075853f96e14e7fb196","name":"Attachment C - AF Form 3064.xlsx","kind":"file","mime_type":".xlsx","size_bytes":36665,"posted_at":"2026-09-18T19:49:44.948Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6cbb7cffe45f4075853f96e14e7fb196/download","mirrored":false},{"resource_id":"f7feb9bedfd84874994e00afc65e8ab5","name":"WD TX20260278.pdf","kind":"file","mime_type":".pdf","size_bytes":208848,"posted_at":"2026-08-18T20:54:42.027Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f7feb9bedfd84874994e00afc65e8ab5/download","mirrored":false}],"awards":[],"related":[],"similar_open":[{"key":"36C24827R0028","latest_notice_id":"70245311c5e3460c9ede6aa2756fa2c7","title":"Y1DZ--FY27 NRM-Base (PROJ 516-23-604) BB - Install Temp Shoring in Crawl Space at Building 1","solicitation_number":"36C24827R0028","notice_type":"p","first_type":"p","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2027-01-19T19:00:00Z","due_date":"2027-01-19","closes_at":"2027-01-19T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C248","office_name":"248-NETWORK CONTRACT OFFICE 8 (36C248)","naics":"238120","psc":"Y1DZ","set_aside":"SDVOSBC","state":"FL","county":"12103","county_name":"Pinellas County","city":"1204200","city_name":"Bay Pines","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open_total":1,"indexable":false}