Solicitation
B1825 LIGHTNING PROTECTION SYSTEM
FA462626Q0008
Department of the Air Force, FA4626 341 Cons LGC. Other Building Equipment Contractors.
Response deadline
March 20, 2026 at 3:00 PM EDT
Closed 250 days ago. Posted March 16, 2026, first published March 2, 2026. Scheduled to archive April 4, 2026.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2026
18 like it are open now in other building equipment contractors
- Construction Services for replacing the wire ropes and designated associated sheave blocks, Franklin, New Hampshire.
Department of the Army, W2SD Endist New England
Sources soughtNAICS 238290Franklin, NHW912WJ27X1CX1Due todayNov 25 - Pneumatic Tube System Preventive Maintenance
Department of Veterans Affairs, 248-Network Contract Office 8
Sources soughtNAICS 238290San Juan, PR36C24827Q0155Due tomorrowNov 26 - JLM Roll Up Door Replacement
Department of Veterans Affairs, 256-Network Contract Office 16
Combined synopsis and solicitationSDVOSBNAICS 238290North Little Rock, AR36C25627Q0092Due in 5 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238290 (other building equipment contractors), means no more than $22 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 18 days from the day the solicitation was posted, March 2, 2026, to the deadline. The deadline moved once: it was first March 19, 2026 and ended as March 20, 2026.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This requirement is to provide all items, articles, materials, operations, or methods listed, mentioned or scheduled on the drawings and/or as specified herein, including all labor, materials, equipment, and incidentals necessary and required for completion of a lightning protection system (LPS) upgrade and inspection. The LPS system cables shall be up sized to AWG 4/0 (approximately ½”) copper to bring the system up to code, and a small quantity of frayed cable will be replaced. The LPS inspection shall be compliant with the most current edition of NFPA 780. The Contractor shall provide and deliver to the United States Air Force a hard copy and a digital CD of the acceptance testing results and the UL Lightning Protection Inspection Certificate for the facility. The UL Lightning Protection Inspection Certificate shall be certified to NFPA 780 Chapter 8. The Contractor shall have attended and completed the Senior Inspector AMMO 47 or better training or equivalent.
Please See attached SOW for complete details.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- SOW Bldg 1825 Lightning Protection System.docx47 KB, March 2, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 2, 2026
Solicitation
Due March 19, 2026 at 3:00 PM EDT. SAM.gov, notice 77fbc6aa7a6940ee89232d56c92379bd
2 revisions on SAM
- March 16, 2026: publish, solicitation
- March 2, 2026: publish, solicitation
March 16, 2026
Solicitation
Due March 20, 2026 at 3:00 PM EDT. SAM.gov, notice 9c11ce7fec9f438ba84415a4f18fd557
2 revisions on SAM
- March 16, 2026: publish, solicitation
- March 2, 2026: publish, solicitation
Points of contact
- Jeffrey Kriegerjeffrey.krieger@us.af.mil4067314014
- Charles McClinticcharles.mcclintic@us.af.mil4067314463