{"canonical":"https://sealedbidder.com/opportunities/fa449725r0007","key":"FA449725R0007","url":"https://sealedbidder.com/opportunities/fa449725r0007","title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","solicitation_number":"FA449725R0007","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-03-21T16:00:00Z","first_posted":"2025-02-07","last_posted":"2025-03-18","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE AIR FORCE","office":"FA4497 436 CONS LGC","naics":"237310","psc":"Y1BD","set_aside":null,"place_state":"DE","place_scope":"site","site":"Dover Air Force Base","place_state_source":null,"place_evidence":null,"place_county":"10001","place_county_name":"Kent County","place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"ea8a142977214358ae639cecc758022e","title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","solicitation_number":"FA449725R0007","notice_type":"o","base_type":"o","posted":"2025-02-07","posted_at":"2025-02-07T20:32:52.106Z","due_at":"2026-03-07T17:00:00Z","due_date":"2026-03-07","cancelled":false,"archived":true,"archive_date":"2026-03-22","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ea8a142977214358ae639cecc758022e/view","enriched":true,"history":[{"index":6,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T13:55:36.576Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"72e54896c1aa458a8bd99b0feacbe6eb","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":4,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-05T20:25:09.314Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1bf364c3b42d4a70aa810f6c64e49c92","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":3,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:03:53.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"292ec111dd864f29957b5cf1bfc6075d","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":2,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:00:31.442Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7947757f10214486adca6a909a1890ae","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":1,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T20:32:52.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ea8a142977214358ae639cecc758022e","solicitation_number":"FA449725R0007"}]},{"notice_id":"292ec111dd864f29957b5cf1bfc6075d","title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","solicitation_number":"FA449725R0007","notice_type":"o","base_type":"o","posted":"2025-02-10","posted_at":"2025-02-10T15:03:53.831Z","due_at":"2025-03-10T16:00:00Z","due_date":"2025-03-10","cancelled":false,"archived":true,"archive_date":"2025-03-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/292ec111dd864f29957b5cf1bfc6075d/view","enriched":true,"history":[{"index":6,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T13:55:36.576Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"72e54896c1aa458a8bd99b0feacbe6eb","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":4,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-05T20:25:09.314Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1bf364c3b42d4a70aa810f6c64e49c92","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":3,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:03:53.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"292ec111dd864f29957b5cf1bfc6075d","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":2,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:00:31.442Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7947757f10214486adca6a909a1890ae","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":1,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T20:32:52.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ea8a142977214358ae639cecc758022e","solicitation_number":"FA449725R0007"}]},{"notice_id":"7947757f10214486adca6a909a1890ae","title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","solicitation_number":"FA449725R0007","notice_type":"o","base_type":"o","posted":"2025-02-10","posted_at":"2025-02-10T15:00:31.442Z","due_at":"2026-03-07T17:00:00Z","due_date":"2026-03-07","cancelled":false,"archived":true,"archive_date":"2026-03-22","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7947757f10214486adca6a909a1890ae/view","enriched":true,"history":[{"index":6,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T13:55:36.576Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"72e54896c1aa458a8bd99b0feacbe6eb","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":4,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-05T20:25:09.314Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1bf364c3b42d4a70aa810f6c64e49c92","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":3,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:03:53.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"292ec111dd864f29957b5cf1bfc6075d","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":2,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:00:31.442Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7947757f10214486adca6a909a1890ae","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":1,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T20:32:52.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ea8a142977214358ae639cecc758022e","solicitation_number":"FA449725R0007"}]},{"notice_id":"1bf364c3b42d4a70aa810f6c64e49c92","title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","solicitation_number":"FA449725R0007","notice_type":"o","base_type":"o","posted":"2025-03-05","posted_at":"2025-03-05T20:25:09.314Z","due_at":"2025-03-21T16:00:00Z","due_date":"2025-03-21","cancelled":false,"archived":true,"archive_date":"2025-04-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1bf364c3b42d4a70aa810f6c64e49c92/view","enriched":true,"history":[{"index":6,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T13:55:36.576Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"72e54896c1aa458a8bd99b0feacbe6eb","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":4,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-05T20:25:09.314Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1bf364c3b42d4a70aa810f6c64e49c92","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":3,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:03:53.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"292ec111dd864f29957b5cf1bfc6075d","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":2,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:00:31.442Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7947757f10214486adca6a909a1890ae","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":1,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T20:32:52.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ea8a142977214358ae639cecc758022e","solicitation_number":"FA449725R0007"}]},{"notice_id":"72e54896c1aa458a8bd99b0feacbe6eb","title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","solicitation_number":"FA449725R0007","notice_type":"o","base_type":"o","posted":"2025-03-18","posted_at":"2025-03-18T13:55:36.576Z","due_at":"2025-03-21T16:00:00Z","due_date":"2025-03-21","cancelled":false,"archived":true,"archive_date":"2025-04-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/72e54896c1aa458a8bd99b0feacbe6eb/view","enriched":true,"history":[{"index":6,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T13:55:36.576Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"72e54896c1aa458a8bd99b0feacbe6eb","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":4,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-05T20:25:09.314Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1bf364c3b42d4a70aa810f6c64e49c92","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":3,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:03:53.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"292ec111dd864f29957b5cf1bfc6075d","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":2,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:00:31.442Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7947757f10214486adca6a909a1890ae","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":1,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T20:32:52.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ea8a142977214358ae639cecc758022e","solicitation_number":"FA449725R0007"}]}],"latest_notice_id":"72e54896c1aa458a8bd99b0feacbe6eb","first_type":"o","notices":[{"dates":{"posted":"2025-02-07","posted_at":"2025-02-07T20:32:52.106Z","created_at":"2025-02-04T19:19:44.143Z","modified_at":"2025-04-06T04:00:10.910Z","response_deadline":{"raw":"2026-03-07T12:00:00-05:00","utc":"2026-03-07T17:00:00Z","date":"2026-03-07","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ea8a142977214358ae639cecc758022e/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","agency":{"office":{"code":"FA4497","name":"FA4497 436 CONS LGC"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19902-5016","city":"DOVER AFB","state":"DE","country":"USA"},"organization_id":"100210314","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-03-22","archive_type":"auto15"},"history":[{"index":6,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T13:55:36.576Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"72e54896c1aa458a8bd99b0feacbe6eb","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":4,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-05T20:25:09.314Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1bf364c3b42d4a70aa810f6c64e49c92","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":3,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:03:53.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"292ec111dd864f29957b5cf1bfc6075d","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":2,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:00:31.442Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7947757f10214486adca6a909a1890ae","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":1,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T20:32:52.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ea8a142977214358ae639cecc758022e","solicitation_number":"FA449725R0007"}],"contacts":[{"name":"Russell Burton","role":"primary","email":"russell.burton.7@us.af.mil","phone":"3026775214"},{"name":"Ms. Omelia Saunders","role":"secondary","email":"omelia.saunders.2@us.af.mil","phone":"3026775545"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"ea8a142977214358ae639cecc758022e","lineage_id":"ea8a142977214358ae639cecc758022e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-23T02:39:08.971837798Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"7bf0c9cad50e18c5e593e063f5b75d3d8f8f03f14423e28a8a4d60feefb48dc8","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-23T02:39:08.971837798Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below:</p>\n\n<p><u><strong>Description of Service</strong>:&nbsp;</u></p>\n\n<p>The project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following:</p>\n\n<p>1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.</p>\n\n<p>2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property.</p>\n\n<p><strong><u>Site Visit Information:</u></strong>&nbsp;A site visit is not necessary to refine this requirement.</p>\n\n<p><strong><u>Proposals:</u></strong>&nbsp;Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by <strong>7 March&nbsp;2025</strong>,&nbsp;<strong>no later than 12:00 PM EST&nbsp;</strong>to the contracting office<strong>&nbsp;by e-mail to all points of contact&nbsp;</strong>listed below in order to be considered. Proposals must be valid through&nbsp;<strong>for 30 calendar days</strong>.</p>\n\n<p><strong><u>Government POCs</u></strong><strong>:</strong></p>\n\n<p>Russell Burton &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;(302) 677-5214&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; russell.burton.7@us.af.mil</p>\n\n<p>Omelia Saunders&nbsp; &nbsp; (302) 677-5042<strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</strong>omelia.saunders.2@us.af.mil</p>\n\n<p></p>","text":"The 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below:\n\nDescription of Service:\n\nThe project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following:\n\n1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.\n\n2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property.\n\nSite Visit Information: A site visit is not necessary to refine this requirement.\n\nProposals: Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by 7 March 2025, no later than 12:00 PM EST to the contracting office by e-mail to all points of contact listed below in order to be considered. Proposals must be valid through for 30 calendar days.\n\nGovernment POCs:\n\nRussell Burton (302) 677-5214 russell.burton.7@us.af.mil\n\nOmelia Saunders (302) 677-5042 omelia.saunders.2@us.af.mil","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA449725R0007","place_of_performance":{"zip":"19902","city":{"code":"DE-01","name":"Dover AFB"},"state":{"code":"DE","name":"Delaware"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BD"},{"dates":{"posted":"2025-02-10","posted_at":"2025-02-10T15:03:53.831Z","created_at":"2025-02-10T15:02:41.063Z","modified_at":"2025-04-06T04:00:10.910Z","response_deadline":{"raw":"2025-03-10T12:00:00-04:00","utc":"2025-03-10T16:00:00Z","date":"2025-03-10","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/292ec111dd864f29957b5cf1bfc6075d/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","agency":{"office":{"code":"FA4497","name":"FA4497 436 CONS LGC"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19902-5016","city":"DOVER AFB","state":"DE","country":"USA"},"organization_id":"100210314","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-03-25","archive_type":"auto15"},"history":[{"index":6,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T13:55:36.576Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"72e54896c1aa458a8bd99b0feacbe6eb","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":4,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-05T20:25:09.314Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1bf364c3b42d4a70aa810f6c64e49c92","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":3,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:03:53.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"292ec111dd864f29957b5cf1bfc6075d","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":2,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:00:31.442Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7947757f10214486adca6a909a1890ae","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":1,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T20:32:52.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ea8a142977214358ae639cecc758022e","solicitation_number":"FA449725R0007"}],"contacts":[{"name":"Russell Burton","role":"primary","email":"russell.burton.7@us.af.mil","phone":"3026775214"},{"name":"Ms. Omelia Saunders","role":"secondary","email":"omelia.saunders.2@us.af.mil","phone":"3026775545"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"292ec111dd864f29957b5cf1bfc6075d","lineage_id":"ea8a142977214358ae639cecc758022e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-23T00:51:24.674721457Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"64ef3d7630bbc07c91a70f4ea9c44a56130f0a6b97d31c15ca1549a098c9cabc","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-23T00:51:24.674721457Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below:</p>\n\n<p><u><strong>Description of Service</strong>:&nbsp;</u></p>\n\n<p>The project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following:</p>\n\n<p>1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.</p>\n\n<p>2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property.</p>\n\n<p><strong><u>Site Visit Information:</u></strong>&nbsp;A site visit is not necessary to refine this requirement.</p>\n\n<p><strong><u>Proposals:</u></strong>&nbsp;Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by <strong>7 March&nbsp;2025</strong>,&nbsp;<strong>no later than 12:00 PM EST&nbsp;</strong>to the contracting office<strong>&nbsp;by e-mail to all points of contact&nbsp;</strong>listed below in order to be considered. Proposals must be valid through&nbsp;<strong>for 120 calendar days</strong>.</p>\n\n<p><strong><u>Government POCs</u></strong><strong>:</strong></p>\n\n<p>Russell Burton &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;(302) 677-5214&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; russell.burton.7@us.af.mil</p>\n\n<p>Omelia Saunders&nbsp; &nbsp; (302) 677-5042<strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</strong>omelia.saunders.2@us.af.mil</p>\n\n<p></p>","text":"The 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below:\n\nDescription of Service:\n\nThe project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following:\n\n1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.\n\n2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property.\n\nSite Visit Information: A site visit is not necessary to refine this requirement.\n\nProposals: Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by 7 March 2025, no later than 12:00 PM EST to the contracting office by e-mail to all points of contact listed below in order to be considered. Proposals must be valid through for 120 calendar days.\n\nGovernment POCs:\n\nRussell Burton (302) 677-5214 russell.burton.7@us.af.mil\n\nOmelia Saunders (302) 677-5042 omelia.saunders.2@us.af.mil","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA449725R0007","place_of_performance":{"zip":"19902","city":{"code":"DE-01","name":"Dover AFB"},"state":{"code":"DE","name":"Delaware"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BD"},{"dates":{"posted":"2025-02-10","posted_at":"2025-02-10T15:00:31.442Z","created_at":"2025-02-10T14:57:50.968Z","modified_at":"2025-04-06T04:00:10.910Z","response_deadline":{"raw":"2026-03-07T12:00:00-05:00","utc":"2026-03-07T17:00:00Z","date":"2026-03-07","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7947757f10214486adca6a909a1890ae/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","agency":{"office":{"code":"FA4497","name":"FA4497 436 CONS LGC"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19902-5016","city":"DOVER AFB","state":"DE","country":"USA"},"organization_id":"100210314","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-03-22","archive_type":"auto15"},"history":[{"index":6,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T13:55:36.576Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"72e54896c1aa458a8bd99b0feacbe6eb","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":4,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-05T20:25:09.314Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1bf364c3b42d4a70aa810f6c64e49c92","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":3,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:03:53.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"292ec111dd864f29957b5cf1bfc6075d","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":2,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:00:31.442Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7947757f10214486adca6a909a1890ae","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":1,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T20:32:52.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ea8a142977214358ae639cecc758022e","solicitation_number":"FA449725R0007"}],"contacts":[{"name":"Russell Burton","role":"primary","email":"russell.burton.7@us.af.mil","phone":"3026775214"},{"name":"Ms. Omelia Saunders","role":"secondary","email":"omelia.saunders.2@us.af.mil","phone":"3026775545"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7947757f10214486adca6a909a1890ae","lineage_id":"ea8a142977214358ae639cecc758022e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-23T01:12:05.326997540Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"d0d906c5a681a3807ea94192a7066d32616ad61d67c5e214b5f014ab9c0b20c2","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-23T01:12:05.326997540Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below:</p>\n\n<p><u><strong>Description of Service</strong>:&nbsp;</u></p>\n\n<p>The project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following:</p>\n\n<p>1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.</p>\n\n<p>2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property.</p>\n\n<p><strong><u>Site Visit Information:</u></strong>&nbsp;A site visit is not necessary to refine this requirement.</p>\n\n<p><strong><u>Proposals:</u></strong>&nbsp;Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by <strong>7 March&nbsp;2025</strong>,&nbsp;<strong>no later than 12:00 PM EST&nbsp;</strong>to the contracting office<strong>&nbsp;by e-mail to all points of contact&nbsp;</strong>listed below in order to be considered. Proposals must be valid through&nbsp;<strong>for 120 calendar days</strong>.</p>\n\n<p><strong><u>Government POCs</u></strong><strong>:</strong></p>\n\n<p>Russell Burton &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;(302) 677-5214&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; russell.burton.7@us.af.mil</p>\n\n<p>Omelia Saunders&nbsp; &nbsp; (302) 677-5042<strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</strong>omelia.saunders.2@us.af.mil</p>\n\n<p></p>","text":"The 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below:\n\nDescription of Service:\n\nThe project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following:\n\n1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.\n\n2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property.\n\nSite Visit Information: A site visit is not necessary to refine this requirement.\n\nProposals: Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by 7 March 2025, no later than 12:00 PM EST to the contracting office by e-mail to all points of contact listed below in order to be considered. Proposals must be valid through for 120 calendar days.\n\nGovernment POCs:\n\nRussell Burton (302) 677-5214 russell.burton.7@us.af.mil\n\nOmelia Saunders (302) 677-5042 omelia.saunders.2@us.af.mil","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA449725R0007","place_of_performance":{"zip":"19902","city":{"code":"DE-01","name":"Dover AFB"},"state":{"code":"DE","name":"Delaware"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BD"},{"dates":{"posted":"2025-03-05","posted_at":"2025-03-05T20:25:09.314Z","created_at":"2025-03-05T19:48:07.327Z","modified_at":"2025-04-06T04:00:10.910Z","response_deadline":{"raw":"2025-03-21T12:00:00-04:00","utc":"2025-03-21T16:00:00Z","date":"2025-03-21","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1bf364c3b42d4a70aa810f6c64e49c92/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","agency":{"office":{"code":"FA4497","name":"FA4497 436 CONS LGC"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19902-5016","city":"DOVER AFB","state":"DE","country":"USA"},"organization_id":"100210314","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-05","archive_type":"auto15"},"history":[{"index":6,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T13:55:36.576Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"72e54896c1aa458a8bd99b0feacbe6eb","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":4,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-05T20:25:09.314Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1bf364c3b42d4a70aa810f6c64e49c92","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":3,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:03:53.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"292ec111dd864f29957b5cf1bfc6075d","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":2,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:00:31.442Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7947757f10214486adca6a909a1890ae","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":1,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T20:32:52.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ea8a142977214358ae639cecc758022e","solicitation_number":"FA449725R0007"}],"contacts":[{"name":"SSgt Mariah Thompson","role":"primary","email":"mariah.thompson@us.af.mil","phone":"3026775104"},{"name":"Ms. Omelia Saunders","role":"secondary","email":"omelia.saunders.2@us.af.mil","phone":"3026775545"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"1bf364c3b42d4a70aa810f6c64e49c92","lineage_id":"ea8a142977214358ae639cecc758022e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-21T02:54:48.284628321Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"d565b17759cf59f06c42602907b0b502f551cc67fc3b29de583d5552d87277df","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-21T02:54:48.284628321Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><u><strong>AMENDMENT 001</strong></u></p>\n\n<p><strong>Please review all attchements for updated information and new RFP Due date.</strong></p>\n\n<p>The 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below:</p>\n\n<p><u><strong>Description of Service</strong>:&nbsp;</u></p>\n\n<p>The project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following:</p>\n\n<p>1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.</p>\n\n<p>2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property.</p>\n\n<p><strong><u>Site Visit Information:</u></strong>&nbsp;A site visit is not necessary to refine this requirement.</p>\n\n<p><strong><u>Proposals:</u></strong>&nbsp;Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by <strong>21&nbsp;March&nbsp;2025</strong>,&nbsp;<strong>no later than 12:00 PM EST&nbsp;</strong>to the contracting office<strong>&nbsp;by e-mail to all points of contact&nbsp;</strong>listed below in order to be considered. Proposals must be valid through&nbsp;<strong>for 120 calendar days</strong>.</p>\n\n<p><strong><u>Government POCs</u></strong><strong>:</strong></p>\n\n<p>SSgt Mariah Thompson&nbsp; &nbsp;(302) 677-5104&nbsp; mariah.thompson@us.af.mil&nbsp;</p>\n\n<p>Omelia Saunders&nbsp; &nbsp; (302) 677-5042<strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</strong>omelia.saunders.2@us.af.mil</p>\n\n<p></p>","text":"AMENDMENT 001\n\nPlease review all attchements for updated information and new RFP Due date.\n\nThe 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below:\n\nDescription of Service:\n\nThe project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following:\n\n1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.\n\n2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property.\n\nSite Visit Information: A site visit is not necessary to refine this requirement.\n\nProposals: Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by 21 March 2025, no later than 12:00 PM EST to the contracting office by e-mail to all points of contact listed below in order to be considered. Proposals must be valid through for 120 calendar days.\n\nGovernment POCs:\n\nSSgt Mariah Thompson (302) 677-5104 mariah.thompson@us.af.mil\n\nOmelia Saunders (302) 677-5042 omelia.saunders.2@us.af.mil","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA449725R0007","place_of_performance":{"zip":"19902","city":{"code":"DE-01","name":"Dover AFB"},"state":{"code":"DE","name":"Delaware"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BD"},{"dates":{"posted":"2025-03-18","posted_at":"2025-03-18T13:55:36.576Z","created_at":"2025-03-18T13:53:16.653Z","modified_at":"2025-04-06T04:00:10.910Z","response_deadline":{"raw":"2025-03-21T12:00:00-04:00","utc":"2025-03-21T16:00:00Z","date":"2025-03-21","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/72e54896c1aa458a8bd99b0feacbe6eb/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","agency":{"office":{"code":"FA4497","name":"FA4497 436 CONS LGC"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19902-5016","city":"DOVER AFB","state":"DE","country":"USA"},"organization_id":"100210314","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-05","archive_type":"auto15"},"history":[{"index":6,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-18T13:55:36.576Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"72e54896c1aa458a8bd99b0feacbe6eb","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":4,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-05T20:25:09.314Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1bf364c3b42d4a70aa810f6c64e49c92","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":3,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:03:53.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"292ec111dd864f29957b5cf1bfc6075d","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":2,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T15:00:31.442Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7947757f10214486adca6a909a1890ae","solicitation_number":"FA449725R0007","parent_opportunity_id":"ea8a142977214358ae639cecc758022e"},{"index":1,"title":"FY25 Airfield Striping & Rubber Removal | Dover AFB, DE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T20:32:52.106Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ea8a142977214358ae639cecc758022e","solicitation_number":"FA449725R0007"}],"contacts":[{"name":"SSgt Mariah Thompson","role":"primary","email":"mariah.thompson@us.af.mil","phone":"3026775104"},{"name":"Justin Bordalo","role":"secondary","email":"justin.bordalo@us.af.mil","phone":"3026772185"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"72e54896c1aa458a8bd99b0feacbe6eb","lineage_id":"ea8a142977214358ae639cecc758022e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-20T03:09:47.670251909Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"ca70862608f713067d849b71b5f74c823c6c6976a7bfcdd804381ece8d727008","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-20T03:09:47.670251909Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><u><strong>AMENDMENT 001</strong></u></p>\n\n<p><strong>Please review all attchements for updated information and new RFP Due date.</strong></p>\n\n<p>The 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below:</p>\n\n<p><u><strong>Description of Service</strong>:&nbsp;</u></p>\n\n<p>The project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following:</p>\n\n<p>1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.</p>\n\n<p>2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property.</p>\n\n<p><strong><u>Site Visit Information:</u></strong>&nbsp;A site visit is not necessary to refine this requirement.</p>\n\n<p><strong><u>Proposals:</u></strong>&nbsp;Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by <strong>21&nbsp;March&nbsp;2025</strong>,&nbsp;<strong>no later than 12:00 PM EST&nbsp;</strong>to the contracting office<strong>&nbsp;by e-mail to all points of contact&nbsp;</strong>listed below in order to be considered. Proposals must be valid through&nbsp;<strong>for 120 calendar days</strong>.</p>\n\n<p><strong><u>Government POCs</u></strong><strong>:</strong></p>\n\n<p>SSgt Mariah Thompson&nbsp; &nbsp;(302) 677-5104&nbsp; mariah.thompson@us.af.mil&nbsp;</p>\n\n<p>SSgt Justin Bordalo&nbsp; &nbsp; (302) 677-3744<strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</strong>Justin.bordalo@us.af.mil</p>\n\n<p></p>","text":"AMENDMENT 001\n\nPlease review all attchements for updated information and new RFP Due date.\n\nThe 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below:\n\nDescription of Service:\n\nThe project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following:\n\n1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.\n\n2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property.\n\nSite Visit Information: A site visit is not necessary to refine this requirement.\n\nProposals: Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by 21 March 2025, no later than 12:00 PM EST to the contracting office by e-mail to all points of contact listed below in order to be considered. Proposals must be valid through for 120 calendar days.\n\nGovernment POCs:\n\nSSgt Mariah Thompson (302) 677-5104 mariah.thompson@us.af.mil\n\nSSgt Justin Bordalo (302) 677-3744 Justin.bordalo@us.af.mil","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA449725R0007","place_of_performance":{"zip":"19902","city":{"code":"DE-01","name":"Dover AFB"},"state":{"code":"DE","name":"Delaware"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BD"}],"due_at":"2025-03-21T16:00:00Z","due_date":"2025-03-21","closes_at":"2025-03-21T16:00:00Z","awardable":true,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4497","office_name":"FA4497 436 CONS LGC","state":"DE","county":"10001","county_name":"Kent County","city":null,"city_name":null,"country":"USA","state_source":null,"state_evidence":null,"site_key":"dover-air-force-base-de","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-20T04:00:16.622230Z","principal_notice_id":"72e54896c1aa458a8bd99b0feacbe6eb","description":{"text":"AMENDMENT 001\n\nPlease review all attchements for updated information and new RFP Due date.\n\nThe 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below:\n\nDescription of Service:\n\nThe project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following:\n\n1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.\n\n2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property.\n\nSite Visit Information: A site visit is not necessary to refine this requirement.\n\nProposals: Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by 21 March 2025, no later than 12:00 PM EST to the contracting office by e-mail to all points of contact listed below in order to be considered. Proposals must be valid through for 120 calendar days.\n\nGovernment POCs:\n\nSSgt Mariah Thompson (302) 677-5104 mariah.thompson@us.af.mil\n\nSSgt Justin Bordalo (302) 677-3744 Justin.bordalo@us.af.mil","html":"<p><u><strong>AMENDMENT 001</strong></u></p>\n\n<p><strong>Please review all attchements for updated information and new RFP Due date.</strong></p>\n\n<p>The 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below:</p>\n\n<p><u><strong>Description of Service</strong>:&nbsp;</u></p>\n\n<p>The project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following:</p>\n\n<p>1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.</p>\n\n<p>2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property.</p>\n\n<p><strong><u>Site Visit Information:</u></strong>&nbsp;A site visit is not necessary to refine this requirement.</p>\n\n<p><strong><u>Proposals:</u></strong>&nbsp;Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by <strong>21&nbsp;March&nbsp;2025</strong>,&nbsp;<strong>no later than 12:00 PM EST&nbsp;</strong>to the contracting office<strong>&nbsp;by e-mail to all points of contact&nbsp;</strong>listed below in order to be considered. Proposals must be valid through&nbsp;<strong>for 120 calendar days</strong>.</p>\n\n<p><strong><u>Government POCs</u></strong><strong>:</strong></p>\n\n<p>SSgt Mariah Thompson&nbsp; &nbsp;(302) 677-5104&nbsp; mariah.thompson@us.af.mil&nbsp;</p>\n\n<p>SSgt Justin Bordalo&nbsp; &nbsp; (302) 677-3744<strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</strong>Justin.bordalo@us.af.mil</p>\n\n<p></p>","origin":"detail"},"contacts":[{"name":"SSgt Mariah Thompson","role":"primary","email":"mariah.thompson@us.af.mil","phone":"3026775104"},{"name":"Justin Bordalo","role":"secondary","email":"justin.bordalo@us.af.mil","phone":"3026772185"}],"place_of_performance":{"zip":"19902","city":{"code":"DE-01","name":"Dover AFB"},"state":{"code":"DE","name":"Delaware"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"19902-5016","city":"DOVER AFB","state":"DE","country":"USA"},"naics_codes":["237310"],"award":null,"attachments":[{"resource_id":"ae8f3540cd7d4d4483c2b9b654d2568a","name":"Solicitation - FA449725R0007.pdf","kind":"file","mime_type":".pdf","size_bytes":1698702,"posted_at":"2025-02-07T20:32:52.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ae8f3540cd7d4d4483c2b9b654d2568a/download","mirrored":false},{"resource_id":"21bdf6b978ca42b897a1f4d16a0d03da","name":"Atch 1 - SOW Airfield Striping-Rubber 2025.pdf","kind":"file","mime_type":".pdf","size_bytes":498557,"posted_at":"2025-02-07T20:32:52.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/21bdf6b978ca42b897a1f4d16a0d03da/download","mirrored":false},{"resource_id":"27c5de453a1e4b86a2515bdf4a442fb9","name":"Atch 8 - FY25 Airfield Striping and Rubber Removal QAs.pdf","kind":"file","mime_type":".pdf","size_bytes":121755,"posted_at":"2025-03-05T20:25:09.314Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/27c5de453a1e4b86a2515bdf4a442fb9/download","mirrored":false},{"resource_id":"0b3393fe2190477eb5ce8da256a256c7","name":"Atch 1a - Airfield Specifications.pdf","kind":"file","mime_type":".pdf","size_bytes":1078815,"posted_at":"2025-02-07T20:32:52.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0b3393fe2190477eb5ce8da256a256c7/download","mirrored":false},{"resource_id":"915fd1aa64044f2ea0a4c7e2797c21e3","name":"Atch 7 - DAFB AT Awareness Guide for Contractors_(Apr 24).pdf","kind":"file","mime_type":".pdf","size_bytes":952238,"posted_at":"2025-03-05T20:25:09.314Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/915fd1aa64044f2ea0a4c7e2797c21e3/download","mirrored":false},{"resource_id":"7ddfe0cee1944bc2a131b5b4c9972571","name":"Atch 2 - Wage Determination_Highway_DE20250004.pdf","kind":"file","mime_type":".pdf","size_bytes":71176,"posted_at":"2025-02-07T20:32:52.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7ddfe0cee1944bc2a131b5b4c9972571/download","mirrored":false},{"resource_id":"40a31ad1b25f4bc78d18e1ecb44d7548","name":"Atch 6 - DAFB AT Awareness for Contractors Trifold_ Apr 24.pdf","kind":"file","mime_type":".pdf","size_bytes":9929788,"posted_at":"2025-03-05T20:25:09.314Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/40a31ad1b25f4bc78d18e1ecb44d7548/download","mirrored":false},{"resource_id":"8c4a19bc25ab4e95894c1ac2eeed9281","name":"Atch 3 - Bid Schedule FY25 Striping Rubber Removal.xlsx","kind":"file","mime_type":".xlsx","size_bytes":63079,"posted_at":"2025-02-07T20:32:52.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8c4a19bc25ab4e95894c1ac2eeed9281/download","mirrored":false},{"resource_id":"53a10b660ccc4d19ab4bbcbe3a1c3e62","name":"Atch 4 - Evaluation Factors Best Value.pdf","kind":"file","mime_type":".pdf","size_bytes":212483,"posted_at":"2025-02-07T20:32:52.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/53a10b660ccc4d19ab4bbcbe3a1c3e62/download","mirrored":false},{"resource_id":"fb4a47076f26440893e6ba4b0a0ba0fc","name":"Atch 5 - Dover AFB OPSEC Awareness Guide for Contractors.pdf","kind":"file","mime_type":".pdf","size_bytes":49861,"posted_at":"2025-02-07T20:32:52.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fb4a47076f26440893e6ba4b0a0ba0fc/download","mirrored":false},{"resource_id":"4213b3c694664bf19f9e0a662ee61555","name":"Atch 6 - DAFB AT Awareness for Contractors Trifold Apr 24.pdf","kind":"file","mime_type":".pdf","size_bytes":1071324,"posted_at":"2025-02-07T20:32:52.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4213b3c694664bf19f9e0a662ee61555/download","mirrored":false},{"resource_id":"0c1821151dd54e49908fe420e5564336","name":"Atch 7 - DAFB AT Awareness Guide for Contractors (Apr 24).pdf","kind":"file","mime_type":".pdf","size_bytes":813972,"posted_at":"2025-02-07T20:32:52.106Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0c1821151dd54e49908fe420e5564336/download","mirrored":false},{"resource_id":"1c33f28cf7684217acb14a40196f68c8","name":"Atch 1 - SOW MAPC Airfield Striping-Rubber 2025 REV 1.pdf","kind":"file","mime_type":".pdf","size_bytes":435857,"posted_at":"2025-03-05T20:25:09.314Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1c33f28cf7684217acb14a40196f68c8/download","mirrored":false},{"resource_id":"5387f1baeebe42fabf8e7ceef7c62174","name":"Atch 5 - Dover AFB OPSEC Awareness Guide for Contractors_.pdf","kind":"file","mime_type":".pdf","size_bytes":166745,"posted_at":"2025-03-05T20:25:09.314Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5387f1baeebe42fabf8e7ceef7c62174/download","mirrored":false},{"resource_id":"e6456c93ec354f148db6072f22f1862d","name":"Atch 4 - Evaluation Factors Best Value dtd 5 Mar 25.pdf","kind":"file","mime_type":".pdf","size_bytes":221231,"posted_at":"2025-03-05T20:25:09.314Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e6456c93ec354f148db6072f22f1862d/download","mirrored":false},{"resource_id":"ad0083fdb9ca45abb22f2c47e199c9dd","name":"Atch 3 - Bid Schedule FY25 Striping Rubber Removal.xlsx","kind":"file","mime_type":".xlsx","size_bytes":59583,"posted_at":"2025-03-05T20:25:09.314Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ad0083fdb9ca45abb22f2c47e199c9dd/download","mirrored":false},{"resource_id":"f84f0230a5a5438da9d101923159fbbc","name":"Atch 2 - Wage Determination_HighwayDE20250004.pdf","kind":"file","mime_type":".pdf","size_bytes":71174,"posted_at":"2025-03-05T20:25:09.314Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f84f0230a5a5438da9d101923159fbbc/download","mirrored":false},{"resource_id":"c957ca28fd8e4563853cd4655a6196c5","name":"Atch 1b - Airfield Striping Rubber Removal Drawings.pdf","kind":"file","mime_type":".pdf","size_bytes":1689361,"posted_at":"2025-03-05T20:25:09.314Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c957ca28fd8e4563853cd4655a6196c5/download","mirrored":false},{"resource_id":"d98be8f2251d4767b2fa56b1a7ba0aef","name":"Atch 1a - Airfield Specifications_.pdf","kind":"file","mime_type":".pdf","size_bytes":1078815,"posted_at":"2025-03-05T20:25:09.314Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d98be8f2251d4767b2fa56b1a7ba0aef/download","mirrored":false},{"resource_id":"bd5e94d078324f21bb93dbcb0d0913fa","name":"Atch 0 - Solicitation Amendment - FA449725R00070001.pdf","kind":"file","mime_type":".pdf","size_bytes":1702499,"posted_at":"2025-03-05T20:25:09.314Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bd5e94d078324f21bb93dbcb0d0913fa/download","mirrored":false}],"awards":[],"related":[{"key":"DOVERAFBSNOWREMOVAL","latest_notice_id":"5858b01d3d444dc7b2488e71d31c875d","title":"Dover AFB - Snow Removal BPA","solicitation_number":"DOVER-AFB_Snow_Removal","notice_type":"r","first_type":"r","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-12-01T17:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4497","office_name":"FA4497 436 CONS LGC","naics":"561790","psc":"S218","set_aside":"SBA","state":"DE","county":"10001","county_name":"Kent County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Dover Air Force Base","site_key":"dover-air-force-base-de","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"FA449727Q0009","latest_notice_id":"936bd372a93f485baaf6489463483372","title":"Grease Traps Maintenance - Dover AFB","solicitation_number":"FA449727Q0009","notice_type":"k","first_type":"k","first_posted":"2026-11-10","last_posted":"2026-11-24","notices":4,"due_at":"2026-12-02T17:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4497","office_name":"FA4497 436 CONS LGC","naics":"562998","psc":"S222","set_aside":"SBA","state":"DE","county":"10001","county_name":"Kent County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Dover Air Force Base","site_key":"dover-air-force-base-de","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"FA449727Q0011","latest_notice_id":"13bc64fa6fbb4a2d87f15f1669b5f60f","title":"Unaccompanied Housing (UH) Campus Broadband Internet – Dover AFB, DE","solicitation_number":"FA449727Q0011","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-24","notices":2,"due_at":"2027-01-15T17:30:00Z","due_date":"2027-01-15","closes_at":"2027-01-15T17:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4497","office_name":"FA4497 436 CONS LGC","naics":"517112","psc":"DG10","set_aside":"SBA","state":"DE","county":"10001","county_name":"Kent County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Dover Air Force Base","site_key":"dover-air-force-base-de","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open":[{"key":"FA449727DOVERAIRFIELD","latest_notice_id":"399bf238646a4125a4d50d34f3da97f1","title":"FY27 Airfield Striping and Rubber Removal","solicitation_number":"FA449727DOVERAIRFIELD","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-02T17:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-F1Q3CN","office_name":"436 CONS LGCA","naics":"237310","psc":"Y1BD","set_aside":"SBA","state":"DE","county":"10001","county_name":"Kent County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"140FF027Q0077","latest_notice_id":"9702a20ddec44a6e9922c43ac0ad75d3","title":"56--AL-WHEELER NWR-WATERMAN GATE","solicitation_number":"140FF027Q0077","notice_type":"o","first_type":"o","first_posted":"2026-11-13","last_posted":"2026-11-16","notices":2,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140FF0","office_name":"FWS CONTRACTING ACTIVITY","naics":"237310","psc":"5630","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 5630)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"W912EK27BA003","latest_notice_id":"c45fd3f122574310b55bca1fb46014ff","title":"W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation","solicitation_number":"W912EK27BA003","notice_type":"p","first_type":"p","first_posted":"2026-10-07","last_posted":"2026-10-07","notices":1,"due_at":"2026-11-30T18:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912EK","office_name":"W07V ENDIST ROCK ISLAND","naics":"237310","psc":"Y1QA","set_aside":"8A","state":"MI","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"title","state_evidence":"W912EK27BA003 - DETROIT PROJECT OFFICE DETROIT, MI","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-08T03:46:32.887903Z"}],"similar_open_total":36,"indexable":false}