Presolicitation, hubzone set-aside
Synopsis AGE Parking Pad.
FA446125Q0154
Department of the Air Force, FA4661 7 Cons CD. Highway, Street, and Bridge Construction.
Response deadline
July 12, 2025 at 3:00 PM EDT
Closed 501 days ago. Posted June 27, 2025. Scheduled to archive July 27, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2025
36 like it are open now in highway, street, and bridge construction
- Road Paving IAH (Houston Bush) Airport
Federal Aviation Administration, 697DCK Regional Acquisitions SVCS
SolicitationSmall businessNAICS 237310Texas697DCK-27-R-00033Closes in 50 daysJan 14, 2027 - AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due in 2 daysNov 27 - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Department of the Army, W07V Endist Rock Island
Presolicitation8(a)NAICS 237310MichiganW912EK27BA003Due in 5 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- HUBZone set-aside. Reserved for certified HUBZone small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. Open HUBZone opportunities
- What comes next
- No solicitation was published under this number after the presolicitation of June 27, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The work shall consist of designing and constructing a new PCC parking area and associated storm water drainage systems. The Conceptual Site Plan layouts indicated in the Attachments only conceptually define the spaces and approximate square footages required. The Contractor shall provide a COMPLETE design to function in existing spaces, limitations, & Code requirements additionally defined by this SoW. The Contractor shall develop preliminary & final designs, & details based off existing dimensions, field measurements, existing limitations, and design limitations.
*Note: The attachments and Statement of Work (SOW) will be provided in the solicitation phase.
1. This Synopsis will close 12 July 2025 at 2:00 PM CST.
2. A solicitation will be posted on or around 14 July 2025.
3. In accordance with FAR 36.204(f), the disclosure of magnitude is between $1,000,000 and $5,000,000.
4. This post does not obligate the Government or Contractor in any way shape or form.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 27, 2025
Presolicitation
Due July 12, 2025 at 3:00 PM EDT. SAM.gov, notice d3264c716a9f4843af34e3b5178a652d
1 revision on SAM
- June 27, 2025: publish, presolicitation
Points of contact
- Marshal khinnomarshal.khinno@us.af.mil325-696-3553
- SrA John G. Craigjohn.craig.16@us.af.mil3256963863