Sources sought
Repair Intersection Runway 03-21 & 15-33
FA441826R00XX
Department of the Air Force, FA4418 628 Cons PK. Highway, Street, and Bridge Construction.
Response deadline
March 9, 2026 at 12:00 PM EDT
Closed 261 days ago. Posted February 12, 2026. Scheduled to archive March 24, 2026.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2026
36 like it are open now in highway, street, and bridge construction
- Repair Taxiway Alpha & Bravo - North Auxiliary Airfield
Department of the Air Force, FA4418 628 Cons PK
SolicitationSmall businessNAICS 237310North, SCFA441827R0002Due in 7 daysDec 2 - AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due in 2 daysNov 27 - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Department of the Army, W07V Endist Rock Island
Presolicitation8(a)NAICS 237310MichiganW912EK27BA003Due in 5 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of February 12, 2026. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The scope of this project includes removal and replacement of 136 individual pavement panels that measure 25 ft wide x 25 ft long x 24 inches deep, located at the intersection of the primary and secondary runways at Joint Base Charleston-Air Base. Replacement panels will be 25 ft wide x 25 ft long by 26 inches deep. All work will be during a 6–8-hour period between approximately 2300 hrs to 0700, Thursday through Monday. It is anticipated that the process will involve 3 primary activities each night, saw cutting, removal and installation of temporary panels, and placement of permanent panels. Each permanent panel will be constructed from fast setting concrete, capable of achieving aircraft traffic strength during a 3–4-hour cure period. The runway intersection shall open for daily aircraft traffic each morning. The project necessitates specialized capabilities and equipment, such as sawing and removal equipment for 24-inch pavement and volumetric mixers, sufficient in quantity to place a minimum of 50 cubic yards of fast setting concrete. Ancillary work includes milling and overlay of existing asphalt shoulders, installation of new runway centerline and edge lightings within the limits of work, installation of runway markings, pavement grinding for smoothness and pavement grooving.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Sources Sought - Rpr Runway 03-21 15-33.docx23 KB, February 12, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 12, 2026
Sources sought
Due March 9, 2026 at 12:00 PM EDT. SAM.gov, notice 67c47020212647638b1bfc97cc4594be
2 revisions on SAM
- May 7, 2026: publish, solicitation
- February 12, 2026: publish, sources sought