Justification
FY25 Base Water Six Month
FA309925p0008
Department of the Air Force, FA3099 47 Conf CC. Water Supply and Irrigation Systems.
Awarded
$228,822.16 obligated so far on USAspending, April 1, 2025, contract FA309925P0008
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one was awarded in 2025
6 like it are open now in water supply and irrigation systems
- Re-Activation of Snake River Water Pump
Department of the Air Force, FA4897 366 Cons PKP
Combined synopsis and solicitationSmall businessNAICS 221310Mountain Home AFB, IDFA489727Q0004Due in 5 daysNov 30 - Water Treatment Chemicals, Testing, Monitoring, and Reporting- Sources Sought Notice / Request for Information
Federal Prison System / Bureau of Prisons, National Acquisitions - Co
Sources soughtNAICS 221310Washington, DC15B70027PR000089Closes in 8 daysDec 3 - Reverse Osmosis, Deionization Equipment and PE Water Softene 2026-2027
Department of Veterans Affairs, 262-Network Contract Office 22
SolicitationNAICS 221310Long Beach, CA36C26227Q0106Closes in 9 daysDec 4
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Justification. Why an agency limited competition or awarded without it, citing the FAR authority. Glossary
- How it ended
- Awarded to City of Del Rio on April 1, 2025. The contracting office reported 1 offer (not available for competition).
Description
As published on SAM.gov.
The Contractor shall provide water service to Laughlin Air Force Base (LAFB). The water provided shall be potable water and meet the Government’s everyday needs for the proper operation of the stated facility. All services provided by the Contractor shall be in conformity with all applicable laws, rules, codes, industry standards, permits, and regulations, promulgated by any and all governmental authorities having jurisdiction.
a.Estimated Service Requirements are:(1)Max Daily Demand: 1,660 Kgal(2)Estimated Annual Consumption: 171,131 Kgal
Water shall be continuously available to the Government facility at a rate of 1,100 gallons per minute at a minimum pressure 80 psi gauge. The usage amounts shown in this paragraph are estimates only and do not constitute a Government usage guarantee. Meter/s shall be installed by the Contractor in a manner that allows verification of billing determinants by Government personnel. Meter/s shall be placed in the vicinity of the points of delivery at San Felipe Springs. Meter/s shall be owned, maintained, and calibrated by the Contractor. Calibration reports shall be produced and sent to the Government annually.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 230712 Single Source Justification and Approval Signed.pdf1.5 MB, March 26, 2025
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- City of Del Rio
- UEI
- WGHMJSE4Y8K6
- CAGE
- 4ARQ0
- Vendor location
- Del Rio, TX
- Contract
- FA309925P0008, purchase order
- Obligated
- $228,822.16, current value $343,000
- Actions
- 3 between March 26, 2025 and December 8, 2025
- Competition
- Not Available for Competition, 1 offer received
- Set-aside reported
- No Set Aside Used.
- Described as
- FY25 Six Month Base Water Contract (1 Apr 2025 - 30 Sep 2025)
- Match
- award number FA309925P0008 equals the contract number; same awarding office FA3099 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 26, 2025
Justification
SAM.gov, notice 0961570547244db6b0314fe26fd4fb5e
1 revision on SAM
- March 26, 2025: publish, justification
Points of contact
- Jose Pinajose.pina.3@us.af.mil8302984862
- Alejandro Alvaradoalejandro.alvarado.3@us.af.mil8302985992