- Solicitation number: FA301625Q0017
- Notice type: Solicitation
- Status: Closed. Deadline was January 13, 2025 at 1:00 PM EST
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA3016 502 Cons CL (FA3016)
- NAICS: 333413 Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
- Product or service code: 4140 Fans, Air Circulators, and Blower Equipment
- Set-aside: Total small business set-aside
- Small business size standard: 500 employees (13 CFR 121.201, NAICS 333413)
- Place of performance: JBSA Lackland, Texas
- Who can bid, by location: Anywhere in the US. Location does not limit who can bid: a product shipped to the buyer, research at the performer's facility, or work at the contractor's site. A state shown is the delivery point.
- County: Bexar County (FIPS 48029). https://sealedbidder.com/counties/bexar-county-tx-48029
- First posted: December 10, 2024
- Last posted: January 8, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/17c05c61da18406cb43917c832b6893d/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 333413 (industrial and commercial fan and blower and air purification equipment manufacturing), means no more than 500 employees, counted with affiliates.
- Time to respond: Bidders had 34 days from the day the solicitation was posted, December 10, 2024, to the deadline. The deadline moved 2 times: it was first December 23, 2024 and ended as January 13, 2025.

## Description

Posted Answers to questions that was submitted by 6 Jan 2025. Posted Answers Jan 8, 2025. (see Attached) This Solicitation has been revised with new Proposal date(13 January 2025) and a SITE VISIT scheduled for( 3 January 2025) Please Review all attachments: Statement of Work(SOW) dated 8 Aug 2024. Salent Characterisitces dated 8 Aug 2024 Revised Solicitation Submit any questions and answers on sheet provided The contractor shall provide all personnel, equipment, supplies, tools, materials, and all non-personal services necessary for purchase and to install one industrial ceiling fan in support of the 344th Training Squadron (TRS), at Lackland bldg. 10904 as defined in this Statement of Work (SOW) Offerors shall inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable.

**SPECIFIC REQUIREMENTS:** 1.3.1. The industrial ceiling fan shall be mounted to structural beams and shall have safety cables. 1.3.2. The contractor shall hang the industrial ceiling fan with mount from the manufacturer and installed in accordance with manufacturer specifications. 1.3.3. The contractors shall make electrical connections from the industrial ceiling fan to the power panel. 1.3.4. Structural Grade 8.8 bolts shall be used for mounting. 1.3.5. Wiring shall be in electrical conduit (no exposed wires.)

1.3.6. The contractor shall insure that all possible deflection, vibration, torque, and other such detrimental forces are considered, controlled, and eliminated as necessary. 1.3.7. The contractor shall provide and install all metal conduit, fittings, boxes wire, and switches necessary to establish full and necessary electrical circuits and ensure a perfectly working and code compliant ceiling fan system. 1.3.8. Industrial ceiling fan shall have a minimum drop from support beam of 12”. 1.3.9.

Contractor shall install the Fan (bldg. 10904) on main structural ceiling beam 35’ 8” from South wall and 75’ from the East wall. Fan shall be centered between vertical beams. 1.3.10. Contractor shall install a ceiling fan control box 44’ from the east wall next to the current light switch at the south entrance/exit door.

## Open now in the same industry

21 open in NAICS 333413.

- FAN,TUBEAXIAL (N0010426QSD50), due November 25, 2026 at 3:30 PM EST. https://sealedbidder.com/opportunities/n0010426qsd50
- FILTER UNIT,AIR PUR (N0010426QYAK6), due November 27, 2026 at 3:30 PM EST. https://sealedbidder.com/opportunities/n0010426qyak6
- M48 Gas Particulate Filter Sets (N00174-26-RFPREQ-W16-0017), due November 27, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/n0017426rfpreqw160017

## Publications

- December 10, 2024: Solicitation, due December 23, 2024 at 1:00 PM EST. Notice 0366a04e4fb74efbbc15fe19930d1f5b. https://sam.gov/workspace/contract/opp/0366a04e4fb74efbbc15fe19930d1f5b/view
- December 10, 2024: Solicitation, due December 23, 2024 at 1:00 PM EST. Notice 4b9904e47ea44da29d0a53e0ea5b4fde. https://sam.gov/workspace/contract/opp/4b9904e47ea44da29d0a53e0ea5b4fde/view
- December 19, 2024: Solicitation, due January 9, 2025 at 1:00 PM EST. Notice f85d7ba0b1c94eff8422be13765909dd. https://sam.gov/workspace/contract/opp/f85d7ba0b1c94eff8422be13765909dd/view
- January 7, 2025: Solicitation, due January 13, 2025 at 1:00 PM EST. Notice 750d3d345ec54379b4021bdcea0ac5e2. https://sam.gov/workspace/contract/opp/750d3d345ec54379b4021bdcea0ac5e2/view
- January 8, 2025: Solicitation, due January 13, 2025 at 1:00 PM EST. Notice 17c05c61da18406cb43917c832b6893d. https://sam.gov/workspace/contract/opp/17c05c61da18406cb43917c832b6893d/view

## Points of contact

- Caroline Holmon, caroline.holmon.1@us.af.mil, 2106714757
- Belinda Tindal, belinda.tindal.1@us.af.mil, 2106174334

---