Solicitation
Updated with Pics and New Measurement - Shade Structure Fabric Replacement and Installation
FA2543RFQTF0003
Department of the Air Force, FA2543 460 Cons. Sporting and Athletic Goods Manufacturing.
Response deadline
September 3, 2025 at 11:00 AM EDT
Closed 448 days ago. Posted September 2, 2025, first published August 20, 2025. Scheduled to archive September 18, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2025
3 like it are open now in sporting and athletic goods manufacturing
- SHOCKWAVE THERAPY SYSTEM
Department of the Army, W6QM Micc-Ft Drum
Combined synopsis and solicitationSmall businessNAICS 339920Ship to FLW911S227U0205Due in 2 daysNov 27 - Total Small Business Set Aside (5) 200 ft+ Diving Bell Umbilicals - Delivery by 12/15/26
Department of the Navy, Naval Surface Warfare Center
Combined synopsis and solicitationSmall businessNAICS 339920Ship to Panama City Beach, FLN61331-27-Q-TR11Due in 6 daysDec 1 - Monterey Golf Range Technology
Department of the Navy, Commander Navy Installations CMD
SolicitationNAICS 339920Ship to San Diego, CANAVMWR-27-R-0001Closes in 20 daysDec 15
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 339920 (sporting and athletic goods manufacturing), means no more than 750 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 14 days from the day the solicitation was posted, August 20, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
UPDATED WITH PICS and New Measurement - REQUEST FOR QUOTES – Buckley Space Force Base, Colorado
UPDATE - Shade structures for the requirement are identified as Shades 1, 2, and 6 in the photos. Additionally, please supply a quote for Shade 7 - measurements are pending. A few vendors have asked for photos of attachment style/method. I have identified the Shade# and picture sequence so that they can be identified separately. There are also overhead Google Maps views of the area that are with and without the number identifiers. I am working on getting the brand name for the cloth materials. Should have brand posted by Tuesday, September 2.
UPDATE#2 - shade measured at approximately 40-feet by 50-feet (measured each post, center-to-center). Staff did not know the brand name for sure of the sail cloth manufacturer, but the original installer was PlayMart. Added to list and is in bold and italicized font.
Shade Structure Fabric Replacement and Installation
The Buckley Space Force Base (Buckley SFB) A-Basin Child Development Center (A-Basin CDC) is requesting quotes to replace worn shade structure fabrics and cables for three (3) existing frame/structures.
The three (3) frame/structures are designated as Pre-Toddler, Toddler, and Preschool. Measurements/Requirements for each are provided below:
Pre-Toddler:
Shade Size: 15’ x 15’
Unit Type: 4-point Sails
Entry Height: 10’
Number of Columns: 4
Number of Fabric Types: 2
Cable/Hardware Finish: Galvanized
Toddler:
Shade Size: 25’ x 18’
Unit Type: 4-point Sails
Entry Height: 10’
Number of Columns: 4
Number of Fabric Types: 2
Cable/Hardware Finish: Galvanized
Preschool:
Shade Size: 28’ x 20’
Unit Type: 4-point Sails
Entry Height: 10’
Number of Columns: 4
Number of Fabric Types: 2
Cable/Hardware Finish: Galvanized
Shade #7:
Shade Size: 40’ x 50’ (approximately - measured center-to-center of the mounting poles)
Unit Type: 4-point Sails
Entry Height: 20’ (approximately)
Number of Columns: 4
Number of Fabric Types: 1
Cable/Hardware Finish: Galvanized
Delivery:
Liftgate required, limited access delivery. The contractor shall deliver three 4-point sails to meet the above requirements no more than 60 days after receipt of the order. Sails shall be delivered to Building 351, located at Buckley Space Force Base, CO 80011.
Delivered items will be inspected and accepted by the government officials responsible for receiving the products and performing any required inspections.
Installation:
The Contractor shall be responsible for the removal and off-base disposal of the existing fabric & cabling, and shall install and tension the new fabric, complete with hardware.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Shade 1 - pic 2.jpg207 KB, August 29, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 20, 2025
Solicitation
Shade Structure Fabric Replacement and Installation
Due September 3, 2025 at 11:00 AM EDT. SAM.gov, notice 378a57ec43e247c9b0074cf2eca5e37f
3 revisions on SAM
- September 2, 2025: publish, solicitation
- August 29, 2025: publish, solicitation
- August 20, 2025: publish, solicitation
August 29, 2025
Solicitation
Updated with Pics - Shade Structure Fabric Replacement and Installation
Due September 3, 2025 at 11:00 AM EDT. SAM.gov, notice 02adda60f7444c018128d8e3894803fb
3 revisions on SAM
- September 2, 2025: publish, solicitation
- August 29, 2025: publish, solicitation
- August 20, 2025: publish, solicitation
September 2, 2025
Solicitation
Due September 3, 2025 at 11:00 AM EDT. SAM.gov, notice 2c911c4aca974fd0868dc147da1f4bba
3 revisions on SAM
- September 2, 2025: publish, solicitation
- August 29, 2025: publish, solicitation
- August 20, 2025: publish, solicitation
Points of contact
- Travis Frittstravis.fritts.1@spaceforce.mil7208476571