# FA2543OutdoorScoreboard

Canonical: https://sealedbidder.com/opportunities/fa2543outdoorscoreboard

- Solicitation number: FA2543OutdoorScoreboard
- Notice type: Sources sought
- Status: Closed. Deadline was May 14, 2026 at 4:00 PM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA2543 460 Cons (FA2543)
- NAICS: 339950 Sign Manufacturing
- Product or service code: 9905 Signs, Advertising Displays, and Identification Plates
- Small business size standard: 500 employees (13 CFR 121.201, NAICS 339950)
- Place of performance: Aurora, Colorado
- Who can bid, by location: Anywhere in the US. Location does not limit who can bid: a product shipped to the buyer, research at the performer's facility, or work at the contractor's site. A state shown is the delivery point.
- County: Adams County (FIPS 08001). https://sealedbidder.com/counties/adams-county-co-08001
- City: Aurora. https://sealedbidder.com/cities/aurora-co-0804000
- First posted: May 5, 2026
- Last posted: May 6, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/7649546fedbd43ce9c906d2949bc3697/view

## Reading this notice

- Kind of notice: Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 339950 (sign manufacturing), means no more than 500 employees, counted with affiliates.
- What comes next: No solicitation was published under this number after the sources sought of May 5, 2026. An agency sometimes issues the solicitation under a new number.

## Description

This is Sources Sought RFI is for MARKET RESEARCH PURPOSES ONLY.

Please review the attached documentation for information regarding this requirement.

The Buckley Space Force Base (BSFB) 460th Contracting Squadron is requesting information from vendors that provide the subject part number. The North American Industry Classification System (NAICS) code is 238990 All Other Specialty Trade Contractors, and the small business size standard is $19.0 Million

The contractor shall provide all necessary labor, materials, transportation, equipment, and supervision to deliver a complete, finished, and fully functional scoreboard system as outlined in the SOW. The project includes the design, engineering, procurement, and installation of the scoreboard unit to include creating the foundation.

The exterior area will be accessible for a large truck, a lift device. The contractor is to provide necessary and ancillary tools, equipment, and vehicles needed to accomplish this project. All scoreboard packaging and foundation debris will be cleaned up and hauled away by the contractor. If the new electrical line has not been installed by that time, the contractor will be responsible for bringing a portable generator, or a similar device, to test their unit.

Questions/Answers to include in Contractor&rsquo;s Sources Sought Response

1. Can you provide examples and references from at least two similar scoreboard installation projects you have completed for government, municipal, or educational institutions within the last five years?

2. What is the specific make and model of the scoreboard you are proposing for this project, and how does it meet all the technical requirements listed in the SOW?

3. Please describe your process for developing and certifying the required engineering drawings for the foundation. Who is your licensed engineering partner for this?

4. What is the full warranty on the scoreboard unit, controller, and your installation labor? Please provide detailed warranty documentation.

5. What is your projected timeline for this project, from contract award to final acceptance, including lead time for materials and permitting?

6. How do you plan to handle testing and verification if the permanent electrical connection is not in place by the time of your installation?

7. What training, if any, is included for our staff on the operation and basic maintenance of the new scoreboard and wireless controller?

8. What are the key challenges you foresee with this project, and what is your plan to mitigate them?

## Attachments

- [Statement of Work - 460 FSS Outdoor Scoreboard.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a727d5d965c24b6890408a875dc02aba/download)

## Open now in the same industry

4 open in NAICS 339950.

- Wayfinding Signage System (19AU9027Q0002), due December 3, 2026 at 4:00 AM EST. https://sealedbidder.com/opportunities/19au9027q0002
- Facility 30011 - Facility Signage Update (FA860127Q0018), due December 4, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/fa860127q0018
- USDA Forest Service Boundary/Survey Markers (1284LM27Q0008), due December 4, 2026 at 7:00 PM EST. https://sealedbidder.com/opportunities/1284lm27q0008

## Publications

- May 5, 2026: Sources sought, due May 14, 2026 at 4:00 PM EDT. Notice 48b37d3893634ba5bed3192267cd0517. https://sam.gov/workspace/contract/opp/48b37d3893634ba5bed3192267cd0517/view
- May 6, 2026: Sources sought, due May 14, 2026 at 4:00 PM EDT. Notice 7649546fedbd43ce9c906d2949bc3697. https://sam.gov/workspace/contract/opp/7649546fedbd43ce9c906d2949bc3697/view

## Points of contact

- Ethan Sullivan, ethan.sullivan@spaceforce.mil, 7208476446

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/fa2543outdoorscoreboard.
