Sources sought
Utility Vehicles
FA2543BCSS001
Department of the Air Force, FA2543 460 Cons. Motorcycle, Bicycle, and Parts Manufacturing.
Response deadline
April 7, 2025 at 1:00 PM EDT
Closed 597 days ago. Posted April 1, 2025. Scheduled to archive April 22, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336991 (motorcycle, bicycle, and parts manufacturing), means no more than 1,050 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of April 1, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
3 EA - Four door Utility Vehicle
3 EA - Two Door Utility Vehicle
(6 Total Utility Vehicles)
Utility Vehicle Shall have a Fully Enclosed Cab
Utility Vehicle Shall have 4-wheel drive
Utility Vehicle Shall have Fully Opening Door and Roll Down Windows
Utility Vehicle shall have Air Conditioning, Heat, and Defrost
Utility Vehicle shall have 24.8 Gross HP
Utility Vehicle Shall have Hydrostatic Power Steering
Utility Vehicle Shall have Hydraulic Cargo Dump
Utility Vehicle Shall have Windshield Wiper
Utility Vehicle Shall have LED Lights
Utility Vehicle shall be Kubota RTV-X4-SKLH-1 or Equal
Utility Vehicle Shall have a governor maxing the total speed at 25 Mile Per Hour (MPH). This governor Must be non-managed and the speed not changeable.
Must be delivered to Buckley Space force Base. A lowboy delivery vehicle will be required, as there is limited access and no off-loading ramp available. The contractor shall deliver the above requirements no later than 7 days after receipt of order.
Items, when delivered, will be accepted and inspected by the government officials responsible for receiving the products and performing any required inspections.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Statement of Need - Utility Vehicles.pdf133 KB, April 1, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 1, 2025
Sources sought
Due April 7, 2025 at 1:00 PM EDT. SAM.gov, notice 35dfb43097654979ba78262aabf64e8a
1 revision on SAM
- April 1, 2025: publish, sources sought
Points of contact
- Blake Campbellblake.campbell.6@spaceforce.mil7208477175