Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,707 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Special notice

Industry Day - Ground Based Strategic Deterrent Utility Corridor, Francis E. Warren Air Force Base, Wyoming

Department of the Army, W071 Endist Omaha. Power and Communication Line and Related Structures Construction.

Response deadline

June 18, 2025 at 12:00 PM EDT

Closed 526 days ago. Posted June 18, 2025, first published May 21, 2025. Scheduled to archive July 2, 2025.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

7 like it are open now in power and communication line and related structures construction

All 7 open in power and communication line and related structures construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary

Description

As published on SAM.gov.

*****************************************************************************************

UPDATE 18 June 2025: 

The inactive date has been extended to 2 July 2025 coinciding with the Sources Sought inactive date. The slides and attendee list of today's briefing are being attached with this update. And as a reminder, below is the link to the concurren Sources Sought posting:

https://sam.gov/opp/42d554102a774386a363bae5a4d90d04/view

*****************************************************************************************

INDUSTRY DAY- GROUND BASED STRATEGIC DETERRENT (GBSD) UTILITY CORRIDOR (UC), FRANCIS E. WARREN (FEW) AIR FORCE BASE (AFB)

LOCATION: Virtual. Microsoft Teams Information Provided below.

DATE: 18 June 2026

TIME: 10:00 AM to 11:00 AM (MDT)

DESCRIPTION:

The U.S. Army Corps of Engineers, Northwestern Division – Omaha District (NWO) is hosting a Virtual Industry Day on 18 June 2025 to provide additional information and gain feedback from industry on an upcoming requirement for the Sentinel Ground Based Strategic Deterrent Intercontinental Ballistic Missile System at F.E. Warren (FEW) Air Force Base (AFB), new utility and communication routes and connections to meet Weapon System criteria. As such, the Government anticipates a project requirement for military construction (MILCON) of a Sentinel Utility Corridor at FEW AFB missile fields located within Wyoming (WY), Colorado (CO), and Nebraska (NE). The majority of the project work will occur along the existing Hardened Intersite Cable System (HICS). As such, planning and design activities are currently ongoing to maintain execution and delivery timelines.

The event will allow prime contractors, subcontractors, and suppliers to learn about this upcoming construction project. The event aims to seek industry input regarding best practices and examples of past success on similar projects. The one-hour event will include presenting the project history, a summary of major work features, constraints and challenges, and project delivery methods. A live question and answer session with USACE personnel will immediately follow the presentation.

The Government anticipates this procurement to be solicited as a competitive fixed-price type contract. In addition, the anticipated construction delivery method would be design-build (DB).

NAICS Code:  237130 Power and Communication Line and Related Structures Construction, with a small business size standard of $45,000,000 annual revenue.

You must register for both events in advance, separately—more details to follow.

SUMMARY OF PROJECT SCOPE:

The Sentinel Ground Based Strategic Deterrent Intercontinental Ballistic Missile System at F.E. Warren (FEW) Air Force Base (AFB) requires new utility and communication routes and connections to meet Weapon System criteria. As such, the Government anticipates a project requirement for military construction (MILCON) of a Sentinel Utility Corridor at FEW AFB missile fields located within Wyoming (WY), Colorado (CO), and Nebraska (NE). The majority of the project work will occur along the existing Hardened Intersite Cable System (HICS). As such, planning and design activities are currently ongoing to maintain execution and delivery timelines. The project is planned to have incremental funding from Fiscal Year (FY) 2025 through 2029; incremental funding is anticipated to be approximately 20% of the total project cost per FY. The project involves constructing utility corridors connecting the Sentinel Missile Field Launch Facilities, Launch Centers, and Wing Command Center at FEW AFB. The total length of the utility corridor infrastructure is anticipated to be between 1,500 and 2,500 miles. The project requirements will include the installation of conduits by various means, communication lines, construction of pull vaults and manholes, and boring under roadways, rivers, railways, etc., and the purchase and installation of the communications media. Facilities will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria (UFC) 1-200-01, General Building requirements. This project will comply with Department of Defense antiterrorism/ force protection requirements per UFC 4-010-01.

Note, that permanent real estate and temporary construction work easements are being procured via separate contract action. Thus, USACE is seeking feedback on the construction industry’s ability to support design and acquisition of the project as well as input on construction methods to streamline project completion and assure efficient real estate acquisition.

Special construction and functional requirements:

Due to evolving project requirements, mission-critical need of the project, incremental funding, and separate real estate procurement effort, the Government is seeking ways to phase or increment the project, identify construction methods to minimize disturbance on non-Government owned lands, plan construction methodologies to assure predictable permanent land acquisitions, definable and efficient temporary real estate easements to support construction, and streamline timelines for project completion. 

Project Period of Performance: As described within the attached questionnaire, a construction completion date of 2031 is currently being considered. However, this may change based on the responses received.

ATTENDING THE INDUSTRY DAY IS HIGHLY RECOMMENDED FOR ALL PROSPECTIVE VENDORS. The industry day is open to the vendor community of prime contractors and significant subcontractors.

         

Below is the link to register in advance for this webinar:

https://www.eventbrite.com/e/industry-day-utility-corridor-construction-fe-warren-afb-tickets-1371246427979?utm-campaign=social&utm-content=attendeeshare&utm-medium=discovery&utm-term=listing&utm-source=cp&aff=ebdsshcopyurl 

After registering, you will receive a confirmation email containing information about joining the webinar.

Additionally, a Sources Sought is being performed with this project and below is the link:

https://sam.gov/opp/42d554102a774386a363bae5a4d90d04/view

Thank you for your interest in this USACE project and we look forward to your participation!

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 21, 2025

    Special notice, originally sources sought

    Due June 18, 2025 at 12:00 PM EDT. SAM.gov, notice ea7b8a83bee9455f8d05bbaca7f0e97c

    3 revisions on SAM
    • June 18, 2025: publish, special notice
    • May 21, 2025: publish, special notice
    • May 20, 2025: publish, sources sought
  2. June 18, 2025

    Special notice

    Due June 18, 2025 at 12:00 PM EDT. SAM.gov, notice eac4144c70e44bfbb43c94d5dbb6e91d

    3 revisions on SAM
    • June 18, 2025: publish, special notice
    • May 21, 2025: publish, special notice
    • May 20, 2025: publish, sources sought

Points of contact