Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,666 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Removed from SAM.gov Sources sought, total small business set-aside

Buckley-FA2543-GasValveReplacement

Buckley-FA2543-GasValveReplacement

Department of the Air Force, FA2543 460 Cons. Industrial Valve Manufacturing.

237 open like this No longer on SAM.govMarkdown

Status

Removed from SAM.gov

SAM.gov stopped publishing this solicitation on October 10, 2026. The agency may have withdrawn it or reposted it under a new notice ID. What follows is the record as it last appeared.

Last posted March 24, 2026; the response deadline was March 31, 2026 at 6:00 PM EDT.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

SAM.gov no longer publishes this one

237 like it are open now in industrial valve manufacturing

  • VALVE,THROTTLE

    Defense Logistics Agency, DLA Weapons Support

    Combined synopsis and solicitationNAICS 332911Ship to the buyerSPE7M227U0060
    Due tomorrowNov 27
  • VALVE,REGULATING,FLUID

    Defense Logistics Agency, DLA Weapons Support

    Combined synopsis and solicitationSmall businessNAICS 332911Ship to the buyerSPE7M227U0061
    Due tomorrowNov 27
  • BODY,VALVE

    Defense Logistics Agency, DLA Weapons Support

    Combined synopsis and solicitationNAICS 332911Ship to the buyerSPE7M227U0094
    Due tomorrowNov 27

All 237 open in industrial valve manufacturing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 332911 (industrial valve manufacturing), means no more than 750 employees, counted with affiliates. Open Small business opportunities

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

The purpose of the sources sought is to help determine technical capability and a price estimate, FOR MARKET RESEARCH ONLY

Reference pictures not in the below text are included in the attachment to this sources sought. 1.0 Scope of Work 1.1 Primary Objective The contractor shall provide fully qualified technicians to replace seven (7) gas control valves suspected of damage from a faulty gas regulator.

1.2 Inspections and Re-commissioning Following valve replacement, the contractor shall: - Conduct comprehensive leak checks on all affected equipment. - Perform a full safety inspection of all gas-fired equipment, including internal components such as burners, heat exchangers, and all electrical/mechanical parts. - Perform multiple leak checks on each piece of equipment, both while the units are static and again while under full operational load. - Re-commission all boilers and water heaters after a full operational test to certify their continued safe operation.

1.3 Deficiency Reporting Upon completion of the re-commissioning, the contractor will deliver a deficiency report detailing any compromised components or units requiring further attention. If additional work or a full system replacement is recommended, the contractor must provide a separate, detailed report with clear justification for the recommendation. 1.4 Contractor-Furnished Items The contractor is responsible for providing all necessary materials and equipment, including but not limited to:

- Gas control valves, assemblies, fittings, gaskets, and valve replacement kits. - All specialized tools required to re-commission units, perform gas pressure tests, conduct combustion analysis, and complete operational tests of all gas-fired equipment.

1.5 Governing Standards All work shall be performed in strict accordance with the manufacturer's specifications and the latest editions of the following codes and standards: - UFC 3-410-01: Heating, Ventilating, and Air Conditioning Systems - UFC 3-420-01: Plumbing Systems - ASME Boiler and Pressure Vessel Codes - All applicable state and local laws/codes UFC criteria can be accessed via the Whole Building Design Guide at https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc.

2.0 Project Logistics & Scheduling - Period of Performance: To be determined. - Building Downtime: No specific building-wide downtime is required. Individual units can be isolated for work as needed, ensuring continuous operations. 3.0 Technical & Compliance Requirements 3.1 Definition of Qualified Labor The contractor must ensure all technicians are certified and licensed to service and repair commercial boilers in accordance with the standards listed in Section 1.5. Furthermore, all technicians must possess specialized certification and experience with the following specific equipment models: - Rinnai Tankless Water Heaters:

Model # REU-KBD3237FFUDC-US - Lochinvar Knight Boilers:

Model # KBN601 - Lochinvar Knight Boilers: Model # KBN286 - RHEEM RUUD Universal Water Heaters: Model # G100-200 3.2 System Pressure Testing Protocol The contractor shall verify the maximum and minimum inlet gas pressures for each unit via its data plate before commencing work. Inlet pressure tests must be performed before and after new valve installation.

Under no circumstances shall any valve be exposed to pressures exceeding the manufacturer's maximum inlet pressure specification.After installation, the contractorwill verify the working gas pressure with all systems running to ensure valves are functioningwithin manufacturer specifications.

3.3 Reporting & Deliverables Upon project completion, the contractor shall submit a final report containing the following detailed information: - Pre- and post-installation gas pressure readings. - Results of all leak checks (for both static and operational states). - A summary of all operational and safety checks performed. - A complete combustion analysis report. - A log of all replaced parts. - A detailed summary of any unit deficiencies discovered during re-commissioning.

3.4 Return of Materials The contractor shall tag all removed parts with the corresponding unit they were removed from and return them directly to the 460 CES project manager.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 24, 2026

    Sources sought, removed from SAM.gov October 10, 2026

    Due March 31, 2026 at 6:00 PM EDT. No longer on SAM.gov, notice 600b8c735bb940768361f83a39ad760d

  2. March 24, 2026

    Sources sought, removed from SAM.gov October 10, 2026

    Due March 31, 2026 at 6:00 PM EDT. No longer on SAM.gov, notice 9a673cc234ac477eb6db941f55343d38

Points of contact