Sources sought, first published as solicitation
ENGINEERING, PROCUREMENT, AND FABRICATION FOR A PILOT-SCALE HYDROTHERMAL LIQUEFACTION PLANT
899043
Department of Energy, PNNL Contracts - DOE Contractor. All Other Professional, Scientific, and Technical Services.
Response deadline
August 26, 2025 at 4:00 PM EDT
Closed 456 days ago. Posted July 15, 2025, first published June 2, 2025. Scheduled to archive August 26, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
31 like it are open now in all other professional, scientific, and technical services
- U.S. Coast Guard Air Station Port Angeles Annual Fire Suppression & System Tests
US Coast Guard, Base Seattle
Combined synopsis and solicitationSmall businessNAICS 541990Port Angeles, WA70Z0L3227Q20190002Closes in 16 daysDec 11 - MQ-4C Triton Unmanned Aircraft System (UAS) Sustaining Engineering and Support (SES) IV Contract Modification to Incorporate Royal Australian Air Force (RAAF) Technical Services Contract Line Item Numbers (CLINs)
Department of the Navy, Naval Air Systems Command
PresolicitationNAICS 541990San Diego, CAN00019-25-RFPREQ-WPM262-0376Due todayNov 25 - NOTICE OF INTENT TO SOLE SOURCE AIHA LAB ACCREDITATION
Defense Health Agency (Dha), Army Med Res Acq Activity
PresolicitationNAICS 541990MarylandPANDHA26P0000049497Due in 7 daysDec 2
All 31 open in all other professional, scientific, and technical services
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 541990 (all other professional, scientific, and technical services), means no more than $19.5 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 85 days from the day the solicitation was posted, June 2, 2025, to the deadline. The deadline moved 3 times: it was first June 11, 2025 and ended as August 26, 2025.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Purpose
Battelle as operator of Pacific Northwest National Laboratory (PNNL) is requesting information from companies with demonstrated engineering, procurement, and fabrication experience of biomass processing and conversion plants (or hydrothermal processing technologies) with specific interest in hydrothermal liquefaction plants.
The information gained from this RFI will identify companies with the interest and experience to successfully design and fabricate a pilot scale hydrothermal liquefaction (HTL) pilot plant capable of processing biomass at a scale of 0.5 dry tons per day (dtpd) based on Battelle’s internal concept. The primary purpose of the HTL pilot plant will be to demonstrate successful, uninterrupted operation for 500 consecutive hours producing approximately 1 barrel per day of biocrude product.
Background
HTL has the potential to be a nexus between diverse organic waste management and biofuels production. HTL is well suited for conversion of high moisture organic materials, such as municipal wastewater sludges, algae, food waste, manures, and other agricultural wastes into biocrude oil. The resulting biocrude is suitable for refining into renewable liquid fuels, including synthetic aviation fuel, marine fuel, and renewable diesel.
The principles of the HTL process were first outlined over a century ago. While conceptually straightforward, the development of HTL technology at pilot and commercial scales has been limited. HTL involves the use of hot, near-critical, compressed water (373.9 °C and 220.6 bar) as both a solvent and reactant to convert biomass into biocrude. During this process, a series of reactions take place, enabling the breakdown of polymeric substances within biomass into a water-insoluble biocrude, alongside water-soluble compounds in an aqueous phase, gases, and solid residues.
Interest in the HTL process surged during the crude oil crises of the 1970s and 1980s, prompting significant research and development efforts. Key contributions came from research institutions like PNNL, Lawrence Berkeley National Laboratory, and the Pittsburgh Energy Research Center. Presently, there are limited examples of subcritical HTL pilot, demonstration, or commercial scale systems in North America, a HTL demonstration plant is under construction at Metro Vancouver Annacis Island Wastewater Treatment Plant in Delta (Canada) while in Europe, Circlia Nordic is offering small scale HTL systems (up to 15 dtpd) for commercial purchase.
Despite its promising results, HTL technology has yet to see widespread adoption. Comprehensive performance evaluations and detailed engineering studies are needed to guide industrial-scale implementation. Further pilot and demonstration projects are critical to attracting stakeholders for the necessary investment for the construction of commercial-scale plants. Battelle has interest in housing the largest hydrothermal liquefaction process research facility in the U.S. to implement develop and prove technology at relevant scale.
Through DOE support, Battelle has carried out research to advance the technical readiness of HTL including operation of an engineering-scale modular process development unit (PDU) capable of processing approximately 50 kg (dry basis) of biomass per day. To further develop the technology, Battelle is redesigning the PNNL HTL PDU to enhance process reliability, reduce downtime, maintain product quality, and increase operator safety. The redesign will target a feed throughput of approximately 0.5 dtpd, resulting in approximately one barrel per day of biocrude production.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 02. RFI Attachment 1.docx20 KB, July 15, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 2, 2025
Solicitation
CUSSP SURF Drilling Services
Due June 11, 2025 at 4:00 PM EDT. SAM.gov, notice b54eee681f6c4ccb84688bb27e56fd37
4 revisions on SAM
- June 24, 2025: publish, solicitation
- June 24, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 2, 2025: publish, solicitation
June 10, 2025
Solicitation
CUSSP SURF Drilling Services
Due June 25, 2025 at 4:00 PM EDT. SAM.gov, notice 2ca75bf27a64438b9d047cd1f10a037f
4 revisions on SAM
- June 24, 2025: publish, solicitation
- June 24, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 2, 2025: publish, solicitation
June 24, 2025
Solicitation
CUSSP SURF Drilling Services
Due July 2, 2025 at 4:00 PM EDT. SAM.gov, notice a687e34b19df434da662965f18ad1a9a
4 revisions on SAM
- June 24, 2025: publish, solicitation
- June 24, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 2, 2025: publish, solicitation
June 24, 2025
Solicitation
CUSSP SURF Drilling Services
Due July 2, 2025 at 4:00 PM EDT. SAM.gov, notice bb4e60ea0fd44a2c8e4dfede2284fe88
4 revisions on SAM
- June 24, 2025: publish, solicitation
- June 24, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 2, 2025: publish, solicitation
July 15, 2025
Sources sought
Due August 26, 2025 at 4:00 PM EDT. SAM.gov, notice e8d6867c351a4f1ebcc5edb190957cc0
2 revisions on SAM
- July 15, 2025: publish, sources sought
- July 15, 2025: publish, sources sought
Points of contact
- Garrett Prathergarrett.prather@pnnl.gov5093727754