Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,696 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Solicitation, total small business set-aside, first published as presolicitation

Yellowtail Switchyard DCS Ph I Pre-Fab Bldg/Const

89503225BWA000069

Department of Energy, Western-Rocky Mountain Region. Power and Communication Line and Related Structures Construction.

Response deadline

June 30, 2025 at 4:00 PM EDT

Closed 514 days ago. Posted June 30, 2025, first published May 29, 2025. Scheduled to archive July 15, 2025.

Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities

This one closed in 2025

7 like it are open now in power and communication line and related structures construction

All 7 open in power and communication line and related structures construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 237130 (power and communication line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 12 days from the day the solicitation was posted, June 18, 2025, to the deadline. The deadline moved 2 times: it was first July 25, 2025 and ended as June 30, 2025.
Before the solicitation
The agency published a presolicitation on May 29, 2025, 20 days before the solicitation.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

Yellowtail Switchyard DCS Phase I priniciple components of work include demolishing of existing building, providing a new pre-fabricated building, complying with all applicable safety requirements contained in WAPA's Construction Standard 1 and OSHA Standards, replacing five (5) 230-kV power circuit breakers including their concrete foundations, rotating six (6) 115-kV power circuit breakers 180 degrees, replacing four (4) 115-kV power circuit breaker concrete foundations, removing six (6) pothead steel structures, removing two (2) disconnect switches (steel only), removing eighteen (18) bus poles and their foundations, removing two (2) lighting units and their foundations, removing two (2) disconnect switches and their foundations, removing one (1) 230-kV power circuit breaker and its foundation, removing two (2) single platforms, removing one (1) double platform, installing one (1) bus pole and its foundation, replacing twelve (12) 230-kV disconnecting switches, replacing two (2) 230-kV disconnecting switches with ground blades, installing one (1) 230-kV CCVT and its foundation, installing a prefabricated control building and associated equipment, material and foundations.

Attachments

Links the agency listed on SAM.gov. They open the sites it named, not files on SAM.gov.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 29, 2025

    Presolicitation

    Yellowtail Switchyard DCS Phase I Pre-Fabricated Building and Construction

    Due July 25, 2025 at 4:00 PM EDT. SAM.gov, notice 4e9dc38204af4180b8ff1fba7272aca9

    2 revisions on SAM
    • May 29, 2025: publish, presolicitation
    • June 18, 2025: publish, solicitation
  2. June 18, 2025

    Solicitation, originally presolicitation

    Due August 8, 2025 at 4:00 PM EDT. SAM.gov, notice 9a9750d0743a476ea736c30dd8a55b15

    3 revisions on SAM
    • May 29, 2025: publish, presolicitation
    • June 30, 2025: publish, solicitation
    • June 18, 2025: publish, solicitation
  3. June 30, 2025

    Solicitation

    Due June 30, 2025 at 4:00 PM EDT. SAM.gov, notice 9a230d34cd80400786a777f889a0a0e9

    3 revisions on SAM
    • May 29, 2025: publish, presolicitation
    • June 30, 2025: publish, solicitation
    • June 18, 2025: publish, solicitation

Points of contact