Sources sought
IRA - High-Temperature Chamber Furnace
89243327NEX000003
Department of Energy, National Energy Technology Laboratory. Industrial Process Furnace and Oven Manufacturing.
Response deadline
November 16, 2026 at 1:00 PM EST
Closed 10 days ago. Posted November 10, 2026, first published November 5, 2026. Scheduled to archive December 1, 2026.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed 10 days ago
9 like it are open now in industrial process furnace and oven manufacturing
- IRA - Brand Name or Equal: HTK 25 GR/26 Automatic
Department of Energy, National Energy Technology Laboratory
SolicitationNAICS 333994Ship to the buyer89243327QEX000009Closes in 8 daysDec 4 - Deep Pit Furnace
Department of the Army, W6QK ACC-RI
Combined synopsis and solicitationSmall businessNAICS 333994Ship to Rock Island, ILW519TC-27-Q-A019Due in 2 daysNov 28 - Dehumidifier Large Buy
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationNAICS 333994Ship to Philadelphia, PA4440-01-699-4396Due in 4 daysNov 30
All 9 open in industrial process furnace and oven manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333994 (industrial process furnace and oven manufacturing), means no more than 500 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation has been published under this number yet. The sources sought of November 5, 2026 is the earliest notice of the purchase.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Q1. Facility Access and Rigging: The specifications require installation at the R&D plateau on the NETL Pittsburgh site. Does the specific facility have a loading dock capable of receiving standard freight, and is there a clear, at-grade, or freight-elevator-accessible path to the final installation room with adequate door clearances for a 100 kW system?
A1: NETL has a clear path to the final installation area with adequate door clearances for a 100 kW system.
Q2. Utility Proximity: The furnace requires a 480-volt, three-phase, 60 Hz power supply supporting an overall power of at least 100 kW. Is the necessary hardwire drop or disconnect already existing within the immediate footprint of the intended installation area, or will the contractor be responsible for routing power from a distant sub-panel?
A2: NETL is responsible for installing all necessary hardwire drops or disconnects.
Q3. Gas Supply and Exhaust: The system requires a fueled incinerator torch to combust organic outgassing. Will the Government supply the necessary process and sweep gases (e.g, Argon, Nitrogen, Propane/Natural gas) via existing facility lines, and is there an existing facility exhaust or fume hood integration point for the torch output?
A3: NETL is responsible for installing all necessary gases, gas lines, and venting lines.
Q4. Lead Times and Compliance: Given that Brand Name or Equal highly customized vacuum furnaces built to NRTL, UL 508A, and NFPA 79 standards often have commercial lead times exceeding 6 to 9 months, will the anticipated RFQ allow for standard commercial lead times? Additionally, can you confirm if this procurement will be subject to the Trade Agreements Act (TAA) or strict Buy American Act (BAA) provisions?
A4: NETL will accept standard commercial lead times for this procurement. This procurement will be subject to the FAR 52.225-5 Trade Agreements Act (TAA).
Attachments
Links the agency listed on SAM.gov. They open the sites it named, not files on SAM.gov.
- Click here to see more information about this opportunity on FedConnectLink to fedconnect.net, November 5, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 5, 2026
Sources sought
Due November 16, 2026 at 1:00 PM EST. SAM.gov, notice bb937945e9da43868b15a4c6fdbb5294
1 revision on SAM
- November 5, 2026: publish, sources sought
November 10, 2026
Sources sought
Due November 16, 2026 at 1:00 PM EST. SAM.gov, notice 1c49db41c3ed48d8a2b515db088a9727
2 revisions on SAM
- November 10, 2026: publish, sources sought
- November 5, 2026: publish, sources sought
Points of contact
- Lahey, David J.David.Lahey@netl.doe.gov412-386-9187