# B1000 Carpet Replacement

Canonical: https://sealedbidder.com/opportunities/7cd9b779a3e14d3c8ee396745378a581

- Solicitation number: 4600
- Notice type: Sources sought
- Status: Closed. Deadline was July 4, 2025 at 11:00 AM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA4600 55 Cons PKP (FA4600)
- NAICS: 314110 Carpet and Rug Mills
- Product or service code: S214 Carpet Laying and Cleaning
- Set-aside: Total small business set-aside
- Small business size standard: 1,500 employees (13 CFR 121.201, NAICS 314110)
- Place of performance: Offutt AFB, Nebraska
- County: Sarpy County (FIPS 31153). https://sealedbidder.com/counties/sarpy-county-ne-31153
- City: Offutt AFB. https://sealedbidder.com/cities/offutt-afb-ne-3135875
- First posted: June 27, 2025
- Last posted: June 30, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/62b4107620a4492aa8b4e17ba694f3a3/view

## Reading this notice

- Kind of notice: Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 314110 (carpet and rug mills), means no more than 1,500 employees, counted with affiliates.
- What comes next: No solicitation was published under this number after the sources sought of June 27, 2025. An agency sometimes issues the solicitation under a new number.

## Description

CONTRACTING OFFICE CONTACT INFORMATION

SrA Thearith Em: thearith.em@us.af.mil

Casey L Hupton: casey.hupton.1@us.af.mil

We looking for looking potential vendors who can complete the work according to the SOO for market research purposes.

Please let us know if you can provide both sets of carpet according to the SOO or not.

Please provide a capability statement if you are interested to the emails above.

Project includes, but not limited to the following work elements.  The contractor shall furnish all labor, equipment, materials, services, and incidentals.  No alterations, additions, or deletions shall be made unless with prior approval of the Contractor Project Manager and the government Procuring Contracting Officer (PCO).  Work shall be completed in a neat, substantial, and competent manner.  Work shall be done in compliance with the manufacturer&rsquo;s instructions.

Replace approximately 2350 sq yards of carpet on Lower Level 1:

&bull;    Purchase new, approximately 1450 sq yards of carpet, Carpet to be Shaw Sculpt Loop (Style number 5T183), Color Clay installed Monolithic to match in progress project on Level 1.

&bull;    Remove existing & replace with new, approximately 1100 sq yards of corridor carpet, salvaging as much reusable carpet as possible for reuse in office spaces.

&bull;    Remove existing & replace with new, approximately 350 sq yards of corridor carpet in secure area, salvaging as much reusable carpet as possible for reuse in office spaces. (Escorts will be required)

&bull;    Work shall be performed in a manner that corridors remain open during work.

&bull;    Purchase new approximately 300 sq yards of carpet to match Shaw Knit Color Sterling currently used in office spaces.  No purchase required to match Mixed metal carpet.

&bull;    Use both the salvaged carpet tiles from the corridors and new carpet tiles to replace carpet tiles in private office spaces at 1002 desks, approx. 900 sq yards. (Escorts will be required)

&bull;    See attached schedules that list both corridors and rooms affected.

Prior to carpet removal & installation, the Contractor shall provide a critical path method construction schedule, to include the phasing/sequencing of carpet removal & replacement activities, as required.  Coordinate all activities associated with this project with J431 Project Manager to minimize any mission impacts and contractor delays.

The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to complete the installation and integration of the prime mission equipment in accordance with the approved site design and installation plan.

## Attachments

- [SOO-Carpet Replacement LL1 CAO 11 Feb 25.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b316ab94e1a24c0784fe630ca09a54de/download)

## Publications

- June 27, 2025: Sources sought, due July 4, 2025 at 11:00 AM EDT. Notice 7cd9b779a3e14d3c8ee396745378a581. https://sam.gov/workspace/contract/opp/7cd9b779a3e14d3c8ee396745378a581/view
- June 30, 2025: Sources sought, due July 4, 2025 at 11:00 AM EDT. Notice 62b4107620a4492aa8b4e17ba694f3a3. https://sam.gov/workspace/contract/opp/62b4107620a4492aa8b4e17ba694f3a3/view

## Points of contact

- Casey Hupton, casey.hupton.1@us.af.mil, 4022321475
- Thearith Em, Thearith.em@us.af.mil, 4022321459

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/7cd9b779a3e14d3c8ee396745378a581.
