Special notice
Environmental Test and Integration Services (ETIS) IV - eLibrary
National Aeronautics and Space Administration, NASA Goddard Space Flight Center. Engineering Services.
Response deadline
April 30, 2025 at 4:00 PM EDT
Closed 576 days ago. Posted January 21, 2025, first published December 23, 2024. Scheduled to archive May 15, 2025.
Get the next one like this from National Aeronautics and Space Administration by email, the day it is posted.Find my opportunities
This one closed in 2025
98 like it are open now in engineering services
- **Amendment 0002** RFI / SOURCES SOUGHT SYNOPSIS - EXPERIMENTAL FACILITIES TECHNICIAN SUPPORT SERVICES
Department of the Army, W6QK ACC-APG Adelphi
Sources soughtNAICS 541330Aberdeen Proving Ground, MDW911QX27RA003Due in 3 daysNov 30 - Weapons Effect Solicitation
Department of the Navy, NSWC Carderock
SolicitationNAICS 541330Bethesda, MDN0016727R3103Due in 4 daysDec 1 - Spectrum Engineering Technical Support Services
Department of the Navy, NAVSUP FLT Log CTR Norfolk
Sources soughtNAICS 541330MarylandN0018927SSN181126Due in 5 daysDec 2
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
**UPDATED 1/21/25 - The ETIS IV eLibrary corresponding documents have been posted under Attachments/Links.**
*********************************************************************************************************************************************************
Environmental Test and Integration Services (ETIS) IV electronic library of supplemental information have been posted under Attachments/Links.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- TO 10-5 ST 3-5 - SOW.pdf650 KB, December 23, 2024
- TO 10-5 ST 1-0 SOW.pdf523 KB, December 23, 2024
- TO 10 - CY5 Engineering Support SOW Mod 0.pdf691 KB, December 23, 2024
- TO 9 - CY5 Info Sys Mgmt SOW Mod0 Rev1.pdf678 KB, December 23, 2024
- TO 8 - CY5 Facility Engineering SOW Mod 1.pdf158 KB, December 23, 2024
- TO 7 - CY5 Advanced Manufacturing SOW Mod 3.pdf165 KB, December 23, 2024
- TO 6 - CY5 Contamination Control SOW Mod 1.pdf180 KB, December 23, 2024
- TO 5 - CY 5 Facility Maintenance SOW Mod 0.pdf1.5 MB, December 23, 2024
- TO 4 - CY5 Cable Harness SOW - Mod 0_Rev1.pdf771 KB, December 23, 2024
- TO 3 - CY5 Optical Integration SOW Mod1.pdf375 KB, December 23, 2024
- TO 2 - CY5 Mechanical Integration SOW_Mod 1.pdf160 KB, December 23, 2024
- TO 1 - CY5 ET SOW Mod 1 Rev 1.pdf376 KB, December 23, 2024
- ETIS III Source Selection Statement.pdf4.6 MB, December 23, 2024
- Attachment A - Statement of Work.pdf300 KB, December 23, 2024
- ETIS III - Modification Log.pdf74 KB, December 23, 2024
- 80GSFC19C0060 - ETIS III Contract Award.pdf851 KB, December 23, 2024
- ETIS IV - Document Listing 1.pdf89 KB, December 23, 2024
- Contamination Control.pdf35 KB, December 23, 2024
- ASNT-SNT-TC-1A.pdf74 KB, December 23, 2024
- 549-PG-1410.2.1F.pdf220 KB, December 23, 2024
- GPR-8719.1D Current.pdf319 KB, December 23, 2024
- 547-WI-8072.1.1F Current.pdf367 KB, December 23, 2024
- 549-PG-8700.1.1I Current.pdf376 KB, December 23, 2024
- 547-WI-4520.2.2G Current.pdf440 KB, December 23, 2024
- Thermal Blanket Support Process.pdf43 KB, December 23, 2024
- Harness-Cable Fab Support.pdf546 KB, December 23, 2024
- 547-WI-8072.1.2F.pdf863 KB, December 23, 2024
- Bldg 5 East Truck Lock Receiving.pdf950 KB, December 23, 2024
- Cryogenic Safety.pdf1.4 MB, December 23, 2024
- MSD Safety Manual.pdf1019 KB, December 23, 2024
- Acoustic Facility Operating Manual.pdf2.1 MB, December 23, 2024
- ETD Safety Manual.pdf2.0 MB, December 23, 2024
- Mass Properties Fac Manual.pdf4.9 MB, December 23, 2024
- NPR 8715 3D.pdf5.7 MB, December 23, 2024
- EMI Lab Manuals.pdf10.3 MB, December 23, 2024
- GSFC Mgmt System Manual.pdf20.0 MB, December 23, 2024
- Thermal Vacuum Manuals.pdf34.5 MB, December 23, 2024
- ETIS IV - Document Listing 2.pdf121 KB, December 23, 2024
- Optical System Design of the GEDI.pdf1.3 MB, January 21, 2025
- ETIF_Handbook_FINAL_.pdf12.2 MB, January 21, 2025
- Lifting Standard.pdf1.4 MB, January 21, 2025
- ETIS IV - eLibrary Document Listing 3.pdf126 KB, January 21, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
December 23, 2024
Special notice, originally presolicitation
Due March 1, 2025 at 4:00 PM EST. SAM.gov, notice 79978f302af34a83b832dd31a5e56b72
January 21, 2025
Special notice
Due April 30, 2025 at 4:00 PM EDT. SAM.gov, notice 29fb55d453de4226a9f8c62cbedf2fa6
4 revisions on SAM
- January 21, 2025: publish, special notice
- December 23, 2024: publish, special notice
- December 23, 2024: publish, special notice
- December 23, 2024: publish, presolicitation
Points of contact
- Eboni N. Washingtoneboni.n.washington@nasa.gov
- Bria Cromartie Whiteheadbria.d.cromartiewhitehead@nasa.gov