Presolicitation, total small business set-aside
Audio Visual System Upgrade – Room 2F100 (Resource Library)
75N98026Q00806
National Institutes of Health, National Institutes of Health Olao. Audio and Video Equipment Manufacturing.
Response deadline
July 25, 2026 at 9:00 AM EDT
Closed 124 days ago. Posted July 15, 2026. Scheduled to archive July 26, 2026.
Get the next one like this from National Institutes of Health by email, the day it is posted.Find my opportunities
This one closed in 2026
52 like it are open now in audio and video equipment manufacturing
- CIRCUIT CARD ASSEMB
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 334310Ship to the buyerN0010426QND96Due tomorrowNov 27 - HOLDER,HANDSET
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 334310Ship to the buyerSPE7M227U0054Due in 2 daysNov 27 - HEADSET,ELECTRICAL
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 334310Ship to the buyerSPE7M527U0079Due in 2 daysNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 334310 (audio and video equipment manufacturing), means no more than 750 employees, counted with affiliates. Open Small business opportunities
- What comes next
- No solicitation has been published under this number yet. The presolicitation of July 15, 2026 is the earliest notice of the purchase.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Requirements:
Audio Visual System Upgrade – Room 2F100 (Resource Library)
National Institutes of Health (NIH) – Office of AIDS Research (OAR)
1. Background
The NIH Office of AIDS Research requires modernization of the audio-visual system in Room 2F100, Resource Library, located at 5601 Fisher Lane, Rockville, Maryland. The current system is outdated, no longer supported by information technology staff, and does not reliably support current meeting and collaboration needs. The upgraded system is intended to align with the functionality and user experience of Room 3F100 and provide a standardized, reliable, and easy-to-use meeting environment.
2. Objective
The objective of this effort is to design, procure, install, and implement a fully integrated audio-visual system that supports high-quality in-room and virtual collaboration, improves usability, and ensures long-term supportability.
3. Scope of Work
3.1 General Requirements
The Contractor shall provide all labor, materials, equipment, and supervision necessary to design, install, integrate, test, and deliver a complete and operational audio-visual system.
3.2 Design and Engineering
The Contractor shall:
-
Develop a complete system design package, including system layouts, signal flow diagrams, and equipment lists
-
Align system design with the functionality and user experience of Room 3F100
-
Conduct a design review with Government stakeholders prior to implementation
3.3 Removal and Preparation
The Contractor shall:
-
Remove and properly dispose of or turn over existing equipment as directed
-
Coordinate all removal activities with Government personnel
-
Prepare the space for installation of the new system
3.4 Government Furnished Equipment (GFE)
The Contractor shall:
-
Evaluate existing Government Furnished Equipment for reuse
-
Test and confirm functionality and compatibility
-
Integrate reusable equipment where appropriate
3.5 Procurement and Installation
The Contractor shall:
-
Procure and install all required system components, including but not limited to:
-
Display systems
-
Audio capture and playback components
-
Video conferencing equipment
-
Control interfaces
-
Install equipment in a professional manner consistent with industry standards
-
Ensure all cabling, mounting, and system components are secure, labeled, and organized
3.6 Integration and Configuration
The Contractor shall:
-
Configure and integrate all system components into a unified solution
-
Ensure compatibility with Government-provided network and collaboration platforms
-
Provide a user interface that is intuitive and consistent with existing NIH standards
3.7 Testing and Commissioning
The Contractor shall:
-
Perform system testing to verify full functionality
-
Conduct audio and video performance tuning
-
Resolve all identified deficiencies prior to Government acceptance
3.8 Training
The Contractor shall:
-
Provide training for designated Government personnel
-
Deliver instruction on system operation and basic troubleshooting
3.9 Documentation and Closeout
The Contractor shall provide a complete turnover package, including:
-
As-built drawings
-
System configuration documentation
-
Equipment inventory
-
Warranty information
-
User guides
4. Performance Requirements
The system shall:
-
Provide clear and intelligible audio coverage throughout the room
-
Support high-quality video conferencing and content sharing
-
Enable dual-display presentation capability
-
Provide a consistent and user-friendly control experience
-
Operate reliably during normal business use
5. Deliverables
The Contractor shall provide, at a minimum:
-
Design package (for review and approval)
-
Installed and fully functional system
-
Training session(s)
-
Final documentation package
6. Acceptance Criteria
The Government will accept deliverables when:
-
The system is fully installed and operational
-
All required components are integrated and functioning as intended
-
Performance requirements are met
-
Documentation is complete and accurate
-
Training has been completed
7. Period of Performance
[TBD]
8. Place of Performance
5601 Fisher Lane
2nd Floor – Room 2F100
Rockville, MD
9. Government Responsibilities
The Government will:
-
Provide access to the facility and workspace
-
Provide network connectivity and required system access
-
Participate in design reviews and acceptance activities
10. Contractor Responsibilities
The Contractor shall:
-
Coordinate all work with Government personnel
-
Comply with all applicable facilities and safety requirements
-
Perform work during approved hours unless otherwise authorized
11. Assumptions and Constraints
-
Existing infrastructure (power, data, pathways) is sufficient to support the system
-
No major construction or structural modifications are required
-
Work will be performed during standard business hours unless otherwise approved
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Requirements 3.docx24 KB, July 15, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 15, 2026
Presolicitation
Due July 25, 2026 at 9:00 AM EDT. SAM.gov, notice 9eeb35a700a3403291df5b07418a847b
1 revision on SAM
- July 15, 2026: publish, presolicitation
Points of contact
- John Burtonburtonjo@mail.nih.gov