63100PR270000009 Repair Floating Dock
70ZL74
US Coast Guard, Tracen Yorktown. Other Heavy and Civil Engineering Construction.
Response deadline
November 9, 2026 at 11:00 AM EST
Closed 16 days ago. Posted November 5, 2026. Scheduled to archive November 24, 2026.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed 16 days ago
144 like it are open now in other heavy and civil engineering construction
- Fort Eustis Dredge Material Management Area Construction in Newport News, Virginia
Department of the Army, W2SD Endist Norfolk
Sources soughtNAICS 237990VirginiaW91236-26-B-1AVXDue in 6 daysDec 1 - Norfolk Harbor Inner Channel and Channel to Newport News Maintenance Dredging
Department of the Army, W2SD Endist Norfolk
SolicitationNAICS 237990VirginiaW9123627BA003Closes in 8 daysDec 3 - Fort Eustis Dredge Material Management Area (FEDMMA)
Department of the Army, W2SD Endist Norfolk
SolicitationSmall businessNAICS 237990VirginiaW9123626BA008Closes in 48 daysJan 12, 2027
All 144 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
Contractor to provide all labor, materials, and equipment necessary to repair the floating Jet Docks, BLDG 292. Work consists of:
- Remove and replace 18 damaged large Module Assemblies (MAs).
- Remove and replace 40 open well style or damaged small MAs and replace with standard small MAs.
- Remove and replace keel deflection system (KDS) on all nine docks.
- Remove and replace all pontoon straps and hardware (36” lifting eyes) for all nine docks.
- Remove and replace all 27 structural support beams and all 18 pontoon guide beams across all nine docks – 45 total.
- Install new cathodic protection system on all beams – 45 total.
- Remove valves and wiring on powerhead for all nine docks and replace with standard valves and wires.
- Install two freshwater washdown hoses, 40 ft length, per dock – 18 total.
- Install protection system between MAs and piling – one per dock, nine total.
- Install bunk tusk system, one per dock, nine total.
- Rebuild the dock stern to include intermediate corrugation support on all nine docks.
- Remove and replace any damaged pontoons with the same size and kind. If no longer in production, replace with closest approximation – approximately 6 pontoons.
- Install additional MAs on docks that are assigned the 29 ft RB-S II boats – 5 docks total, approximately 30 large MAs, 5 small MAs.
- Install new inner bunk systems on all docks to accommodate the boats described below:
- 29 ft RB-S II boats (8,400 lbs),
- 26 ft TANB boats (7,300 lbs), and
- 26 ft CB-OTH-V boats (7,470 lbs).
- Calibrate existing and replacement pontoons for the boats described above.
- For a layout of dock assignments, refer to the included drawing 2-29202-1.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 12a. 31300766 SOW.pdf342 KB, November 5, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 5, 2026
Special notice
Due November 9, 2026 at 11:00 AM EST. SAM.gov, notice 3fabfd029cae4da5acddb68dff0c5ee6