{"canonical":"https://sealedbidder.com/opportunities/70z8526q025799","key":"70Z8526Q025799","url":"https://sealedbidder.com/opportunities/70z8526q025799","title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","solicitation_number":"70Z8526Q025799","notice_type":"s","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-07-01T15:00:00Z","first_posted":"2026-06-26","last_posted":"2026-06-27","department":"HOMELAND SECURITY, DEPARTMENT OF","subagency":"US COAST GUARD","office":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"336611","psc":"J020","set_aside":"SBA","place_state":"CA","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"06001","place_county_name":"Alameda County","place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"0219e6f1ac604287a82038c1cff0d6d9","title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","solicitation_number":"70Z8526Q025799","notice_type":"s","base_type":"s","posted":"2026-06-26","posted_at":"2026-06-26T17:37:03.624Z","due_at":"2026-07-01T15:00:00Z","due_date":"2026-07-01","cancelled":false,"archived":true,"archive_date":"2026-07-16","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/0219e6f1ac604287a82038c1cff0d6d9/view","enriched":true,"history":[{"index":4,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-27T15:45:44.102Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"c4badd92b7744228b29cdaecdee64dc8","solicitation_number":"70Z8526Q025799","parent_opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9"},{"index":2,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T17:40:33.095Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"bdc5bda4d5d843a8a06687da23de130b","solicitation_number":"70Z8526Q025799","parent_opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9"},{"index":1,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T17:37:03.624Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9","solicitation_number":"70Z8526Q025799"}]},{"notice_id":"bdc5bda4d5d843a8a06687da23de130b","title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","solicitation_number":"70Z8526Q025799","notice_type":"s","base_type":"s","posted":"2026-06-26","posted_at":"2026-06-26T17:40:33.095Z","due_at":"2026-07-01T15:00:00Z","due_date":"2026-07-01","cancelled":false,"archived":true,"archive_date":"2026-07-16","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/bdc5bda4d5d843a8a06687da23de130b/view","enriched":true,"history":[{"index":4,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-27T15:45:44.102Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"c4badd92b7744228b29cdaecdee64dc8","solicitation_number":"70Z8526Q025799","parent_opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9"},{"index":2,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T17:40:33.095Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"bdc5bda4d5d843a8a06687da23de130b","solicitation_number":"70Z8526Q025799","parent_opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9"},{"index":1,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T17:37:03.624Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9","solicitation_number":"70Z8526Q025799"}]},{"notice_id":"c4badd92b7744228b29cdaecdee64dc8","title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","solicitation_number":"70Z8526Q025799","notice_type":"s","base_type":"s","posted":"2026-06-27","posted_at":"2026-06-27T15:45:44.102Z","due_at":"2026-07-01T15:00:00Z","due_date":"2026-07-01","cancelled":false,"archived":true,"archive_date":"2026-07-16","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c4badd92b7744228b29cdaecdee64dc8/view","enriched":true,"history":[{"index":4,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-27T15:45:44.102Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"c4badd92b7744228b29cdaecdee64dc8","solicitation_number":"70Z8526Q025799","parent_opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9"},{"index":2,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T17:40:33.095Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"bdc5bda4d5d843a8a06687da23de130b","solicitation_number":"70Z8526Q025799","parent_opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9"},{"index":1,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T17:37:03.624Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9","solicitation_number":"70Z8526Q025799"}]}],"latest_notice_id":"c4badd92b7744228b29cdaecdee64dc8","first_type":"s","notices":[{"dates":{"posted":"2026-06-26","posted_at":"2026-06-26T17:37:03.624Z","created_at":"2026-06-26T17:27:40.380Z","modified_at":"2026-07-17T03:55:46.287Z","response_deadline":{"raw":"2026-07-01T08:00:00-07:00","utc":"2026-07-01T15:00:00Z","date":"2026-07-01","time":"08:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/0219e6f1ac604287a82038c1cff0d6d9/view"},"naics":{"codes":["336611"],"primary":"336611"},"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_id":"100187922","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-07-16","archive_type":"auto15"},"history":[{"index":4,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-27T15:45:44.102Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"c4badd92b7744228b29cdaecdee64dc8","solicitation_number":"70Z8526Q025799","parent_opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9"},{"index":2,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T17:40:33.095Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"bdc5bda4d5d843a8a06687da23de130b","solicitation_number":"70Z8526Q025799","parent_opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9"},{"index":1,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T17:37:03.624Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9","solicitation_number":"70Z8526Q025799"}],"contacts":[{"name":"McTague, Sean","role":"primary","email":"Sean.P.McTague@uscg.mil","phone":"15716143888"},{"name":"ULISES BALMACEDA","role":"secondary","email":"Ulises.O.Balmaceda@uscg.mil","phone":"2068200307"}],"base_type":{"code":"s","label":"Special Notice"},"notice_id":"0219e6f1ac604287a82038c1cff0d6d9","set_aside":{"code":"8A","label":"8(a) Set-Aside (FAR 19.8)"},"lineage_id":"0219e6f1ac604287a82038c1cff0d6d9","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-01T00:26:49.760228009Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"791e50c3cda2e24f21a57c98e90f2a2e82ba6eba15f106d205d3a5d7342efa2d","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-01T00:26:49.760228009Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"html":"<p>STATEMENT OF WORK (SOW)</p>\n\n<p>FOR</p>\n\n<p><strong>GAS TURBINE BLEED AIR HOSE INSULATION</strong></p>\n\n<p></p>\n\n<p>CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. &nbsp;The ship&rsquo;s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>1.0&nbsp; GENERAL</strong></p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Background</strong>&nbsp;</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.</p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>&nbsp;</strong><strong>Scope</strong>&nbsp;</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.</p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>OBJECTIVE </strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO&rsquo;s Operational Commander.</p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>APPLICABLE DOCUMENTS</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Reference Documents</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The following documents may be helpful to the Contractor in performing the work described in this document:</p>\n\n<p></p>\n\n<p>Coast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)</p>\n\n<p>Coast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping &amp; Joint Ident (P1 System) Unit 2210</p>\n\n<p></p>\n\n<ol>\n\t<li>SPECIFIC REQUIREMENTS/TASKS</li>\n</ol>\n\n<p></p>\n\n<p>Existing insulation cover dimensions are as follows:</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>Length</strong></p>\n\n<p><strong>Width</strong></p>\n\n<p><strong>Thickness</strong></p>\n\n<p><strong>Inner Layer</strong></p>\n\n<p>34&rdquo;</p>\n\n<p>22&rdquo;</p>\n\n<p>2&rdquo;</p>\n\n<p><strong>Outer Layer</strong></p>\n\n<p>45&rdquo;</p>\n\n<p>28&rdquo;</p>\n\n<p>2&rdquo;</p>\n\n<p></p>\n\n<p>Fabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth &ldquo;wire-inserted&rdquo;. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.</p>\n\n<p></p>\n\n<p><strong>3.0&nbsp; OTHER APPLICABLE CONDITIONS</strong></p>\n\n<p></p>\n\n<p><strong>3.1 &nbsp;Period of Performance</strong>&nbsp;</p>\n\n<p><em>-</em></p>\n\n<p>The period of performance for this contract shall be between 01JUL2026 &amp; 15JUL26.</p>\n\n<p></p>\n\n<p><strong>3.2&nbsp; PLACE OF PERFORMANCE</strong>&nbsp;</p>\n\n<p></p>\n\n<p>The primary place of performance will be at the contractor&rsquo;s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501</p>\n\n<p></p>\n\n<p>4.0&nbsp; CONTRACTOR FURNISHED PROPERTY&nbsp;</p>\n\n<p>The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.</p>\n\n<p></p>\n\n<p><strong>5.0 Points of Contact</strong></p>\n\n<p>USCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil</p>\n\n<p></p>\n\n<p><strong>6.0 Imagery</strong></p>\n\n<p>Outer Lagging&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Inner Lagging</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>","text":"STATEMENT OF WORK (SOW)\n\nFOR\n\nGAS TURBINE BLEED AIR HOSE INSULATION\n\nCGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. The ship’s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).\n\n1.0 GENERAL\n\n•\n\n• Background\n\nUSCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.\n\n•\n\n• Scope\n\nThe scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.\n\n•\n\n• OBJECTIVE\n\nThe goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO’s Operational Commander.\n\n•\n\n• APPLICABLE DOCUMENTS\n\n•\n\n•\n\n• Reference Documents\n\nThe following documents may be helpful to the Contractor in performing the work described in this document:\n\nCoast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)\n\nCoast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping & Joint Ident (P1 System) Unit 2210\n\n• SPECIFIC REQUIREMENTS/TASKS\n\nExisting insulation cover dimensions are as follows:\n\nLength\n\nWidth\n\nThickness\n\nInner Layer\n\n34”\n\n22”\n\n2”\n\nOuter Layer\n\n45”\n\n28”\n\n2”\n\nFabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth “wire-inserted”. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.\n\n3.0 OTHER APPLICABLE CONDITIONS\n\n3.1 Period of Performance\n\n-\n\nThe period of performance for this contract shall be between 01JUL2026 & 15JUL26.\n\n3.2 PLACE OF PERFORMANCE\n\nThe primary place of performance will be at the contractor’s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501\n\n4.0 CONTRACTOR FURNISHED PROPERTY\n\nThe Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.\n\n5.0 Points of Contact\n\nUSCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil\n\n6.0 Imagery\n\nOuter Lagging Inner Lagging","origin":"detail"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"70Z8526Q025799","place_of_performance":{"zip":"94501","state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"J020"},{"dates":{"posted":"2026-06-26","posted_at":"2026-06-26T17:40:33.095Z","created_at":"2026-06-26T17:38:50.391Z","modified_at":"2026-07-17T03:55:46.287Z","response_deadline":{"raw":"2026-07-01T08:00:00-07:00","utc":"2026-07-01T15:00:00Z","date":"2026-07-01","time":"08:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/bdc5bda4d5d843a8a06687da23de130b/view"},"naics":{"codes":["336611"],"primary":"336611"},"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_id":"100187922","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-07-16","archive_type":"auto15"},"history":[{"index":4,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-27T15:45:44.102Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"c4badd92b7744228b29cdaecdee64dc8","solicitation_number":"70Z8526Q025799","parent_opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9"},{"index":2,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T17:40:33.095Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"bdc5bda4d5d843a8a06687da23de130b","solicitation_number":"70Z8526Q025799","parent_opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9"},{"index":1,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T17:37:03.624Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9","solicitation_number":"70Z8526Q025799"}],"contacts":[{"name":"McTague, Sean","role":"primary","email":"Sean.P.McTague@uscg.mil","phone":"15716143888"},{"name":"ULISES BALMACEDA","role":"secondary","email":"Ulises.O.Balmaceda@uscg.mil","phone":"2068200307"}],"base_type":{"code":"s","label":"Special Notice"},"notice_id":"bdc5bda4d5d843a8a06687da23de130b","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"0219e6f1ac604287a82038c1cff0d6d9","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-01T00:55:36.961649026Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"7735783dd092b0bf14068bf3544813e419a95f453f0e21a283f376cf7daa560e","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-01T00:55:36.961649026Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"html":"<p>STATEMENT OF WORK (SOW)</p>\n\n<p>FOR</p>\n\n<p><strong>GAS TURBINE BLEED AIR HOSE INSULATION</strong></p>\n\n<p></p>\n\n<p>CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. &nbsp;The ship&rsquo;s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>1.0&nbsp; GENERAL</strong></p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Background</strong>&nbsp;</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.</p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>&nbsp;</strong><strong>Scope</strong>&nbsp;</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.</p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>OBJECTIVE </strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO&rsquo;s Operational Commander.</p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>APPLICABLE DOCUMENTS</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Reference Documents</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The following documents may be helpful to the Contractor in performing the work described in this document:</p>\n\n<p></p>\n\n<p>Coast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)</p>\n\n<p>Coast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping &amp; Joint Ident (P1 System) Unit 2210</p>\n\n<p></p>\n\n<ol>\n\t<li>SPECIFIC REQUIREMENTS/TASKS</li>\n</ol>\n\n<p></p>\n\n<p>Existing insulation cover dimensions are as follows:</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>Length</strong></p>\n\n<p><strong>Width</strong></p>\n\n<p><strong>Thickness</strong></p>\n\n<p><strong>Inner Layer</strong></p>\n\n<p>34&rdquo;</p>\n\n<p>22&rdquo;</p>\n\n<p>2&rdquo;</p>\n\n<p><strong>Outer Layer</strong></p>\n\n<p>45&rdquo;</p>\n\n<p>28&rdquo;</p>\n\n<p>2&rdquo;</p>\n\n<p></p>\n\n<p>Fabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth &ldquo;wire-inserted&rdquo;. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.</p>\n\n<p></p>\n\n<p><strong>3.0&nbsp; OTHER APPLICABLE CONDITIONS</strong></p>\n\n<p></p>\n\n<p><strong>3.1 &nbsp;Period of Performance</strong>&nbsp;</p>\n\n<p><em>-</em></p>\n\n<p>The period of performance for this contract shall be between 01JUL2026 &amp; 15JUL26.</p>\n\n<p></p>\n\n<p><strong>3.2&nbsp; PLACE OF PERFORMANCE</strong>&nbsp;</p>\n\n<p></p>\n\n<p>The primary place of performance will be at the contractor&rsquo;s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501</p>\n\n<p></p>\n\n<p>4.0&nbsp; CONTRACTOR FURNISHED PROPERTY&nbsp;</p>\n\n<p>The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.</p>\n\n<p></p>\n\n<p><strong>5.0 Points of Contact</strong></p>\n\n<p>USCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil</p>\n\n<p></p>\n\n<p><strong>6.0 Imagery</strong></p>\n\n<p>Outer Lagging&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Inner Lagging</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>","text":"STATEMENT OF WORK (SOW)\n\nFOR\n\nGAS TURBINE BLEED AIR HOSE INSULATION\n\nCGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. The ship’s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).\n\n1.0 GENERAL\n\n•\n\n• Background\n\nUSCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.\n\n•\n\n• Scope\n\nThe scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.\n\n•\n\n• OBJECTIVE\n\nThe goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO’s Operational Commander.\n\n•\n\n• APPLICABLE DOCUMENTS\n\n•\n\n•\n\n• Reference Documents\n\nThe following documents may be helpful to the Contractor in performing the work described in this document:\n\nCoast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)\n\nCoast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping & Joint Ident (P1 System) Unit 2210\n\n• SPECIFIC REQUIREMENTS/TASKS\n\nExisting insulation cover dimensions are as follows:\n\nLength\n\nWidth\n\nThickness\n\nInner Layer\n\n34”\n\n22”\n\n2”\n\nOuter Layer\n\n45”\n\n28”\n\n2”\n\nFabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth “wire-inserted”. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.\n\n3.0 OTHER APPLICABLE CONDITIONS\n\n3.1 Period of Performance\n\n-\n\nThe period of performance for this contract shall be between 01JUL2026 & 15JUL26.\n\n3.2 PLACE OF PERFORMANCE\n\nThe primary place of performance will be at the contractor’s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501\n\n4.0 CONTRACTOR FURNISHED PROPERTY\n\nThe Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.\n\n5.0 Points of Contact\n\nUSCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil\n\n6.0 Imagery\n\nOuter Lagging Inner Lagging","origin":"detail"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"70Z8526Q025799","place_of_performance":{"zip":"94501","state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"J020"},{"dates":{"posted":"2026-06-27","posted_at":"2026-06-27T15:45:44.102Z","created_at":"2026-06-27T15:40:01.614Z","modified_at":"2026-07-17T03:55:46.287Z","response_deadline":{"raw":"2026-07-01T08:00:00-07:00","utc":"2026-07-01T15:00:00Z","date":"2026-07-01","time":"08:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c4badd92b7744228b29cdaecdee64dc8/view"},"naics":{"codes":["336611"],"primary":"336611"},"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_id":"100187922","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-07-16","archive_type":"auto15"},"history":[{"index":4,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-27T15:45:44.102Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"c4badd92b7744228b29cdaecdee64dc8","solicitation_number":"70Z8526Q025799","parent_opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9"},{"index":2,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T17:40:33.095Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"bdc5bda4d5d843a8a06687da23de130b","solicitation_number":"70Z8526Q025799","parent_opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9"},{"index":1,"title":"USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T17:37:03.624Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"0219e6f1ac604287a82038c1cff0d6d9","solicitation_number":"70Z8526Q025799"}],"contacts":[{"name":"McTague, Sean","role":"primary","email":"Sean.P.McTague@uscg.mil","phone":"15716143888"},{"name":"ULISES BALMACEDA","role":"secondary","email":"Ulises.O.Balmaceda@uscg.mil","phone":"2068200307"}],"base_type":{"code":"s","label":"Special Notice"},"notice_id":"c4badd92b7744228b29cdaecdee64dc8","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"0219e6f1ac604287a82038c1cff0d6d9","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-01T00:28:14.257096465Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"c1829884526c12baaccbd9f0cb4659ea86e657cdb62ef580216d1fe5e30ac1b0","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-01T00:28:14.257096465Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"html":"<p>Mofification 1 to this solicitation was to correct the POP in the attached SOW.&nbsp;</p>\n\n<p>Correct: period of performance for this contract shall be between 01JUL2026 &amp; 15JUL26.</p>\n\n<p></p>\n\n<p>STATEMENT OF WORK (SOW)</p>\n\n<p>FOR</p>\n\n<p><strong>GAS TURBINE BLEED AIR HOSE INSULATION</strong></p>\n\n<p></p>\n\n<p>CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. &nbsp;The ship&rsquo;s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>1.0&nbsp; GENERAL</strong></p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Background</strong>&nbsp;</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.</p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>&nbsp;</strong><strong>Scope</strong>&nbsp;</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.</p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>OBJECTIVE </strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO&rsquo;s Operational Commander.</p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>APPLICABLE DOCUMENTS</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Reference Documents</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The following documents may be helpful to the Contractor in performing the work described in this document:</p>\n\n<p></p>\n\n<p>Coast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)</p>\n\n<p>Coast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping &amp; Joint Ident (P1 System) Unit 2210</p>\n\n<p></p>\n\n<ol>\n\t<li>SPECIFIC REQUIREMENTS/TASKS</li>\n</ol>\n\n<p></p>\n\n<p>Existing insulation cover dimensions are as follows:</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>Length</strong></p>\n\n<p><strong>Width</strong></p>\n\n<p><strong>Thickness</strong></p>\n\n<p><strong>Inner Layer</strong></p>\n\n<p>34&rdquo;</p>\n\n<p>22&rdquo;</p>\n\n<p>2&rdquo;</p>\n\n<p><strong>Outer Layer</strong></p>\n\n<p>45&rdquo;</p>\n\n<p>28&rdquo;</p>\n\n<p>2&rdquo;</p>\n\n<p></p>\n\n<p>Fabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth &ldquo;wire-inserted&rdquo;. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.</p>\n\n<p></p>\n\n<p><strong>3.0&nbsp; OTHER APPLICABLE CONDITIONS</strong></p>\n\n<p></p>\n\n<p><strong>3.1 &nbsp;Period of Performance</strong>&nbsp;</p>\n\n<p><em>-</em></p>\n\n<p>The period of performance for this contract shall be between 01JUL2026 &amp; 15JUL26.</p>\n\n<p></p>\n\n<p><strong>3.2&nbsp; PLACE OF PERFORMANCE</strong>&nbsp;</p>\n\n<p></p>\n\n<p>The primary place of performance will be at the contractor&rsquo;s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501</p>\n\n<p></p>\n\n<p>4.0&nbsp; CONTRACTOR FURNISHED PROPERTY&nbsp;</p>\n\n<p>The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.</p>\n\n<p></p>\n\n<p><strong>5.0 Points of Contact</strong></p>\n\n<p>USCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil</p>\n\n<p></p>\n\n<p><strong>6.0 Imagery</strong></p>\n\n<p>Outer Lagging&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Inner Lagging</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>","text":"Mofification 1 to this solicitation was to correct the POP in the attached SOW.\n\nCorrect: period of performance for this contract shall be between 01JUL2026 & 15JUL26.\n\nSTATEMENT OF WORK (SOW)\n\nFOR\n\nGAS TURBINE BLEED AIR HOSE INSULATION\n\nCGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. The ship’s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).\n\n1.0 GENERAL\n\n•\n\n• Background\n\nUSCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.\n\n•\n\n• Scope\n\nThe scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.\n\n•\n\n• OBJECTIVE\n\nThe goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO’s Operational Commander.\n\n•\n\n• APPLICABLE DOCUMENTS\n\n•\n\n•\n\n• Reference Documents\n\nThe following documents may be helpful to the Contractor in performing the work described in this document:\n\nCoast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)\n\nCoast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping & Joint Ident (P1 System) Unit 2210\n\n• SPECIFIC REQUIREMENTS/TASKS\n\nExisting insulation cover dimensions are as follows:\n\nLength\n\nWidth\n\nThickness\n\nInner Layer\n\n34”\n\n22”\n\n2”\n\nOuter Layer\n\n45”\n\n28”\n\n2”\n\nFabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth “wire-inserted”. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.\n\n3.0 OTHER APPLICABLE CONDITIONS\n\n3.1 Period of Performance\n\n-\n\nThe period of performance for this contract shall be between 01JUL2026 & 15JUL26.\n\n3.2 PLACE OF PERFORMANCE\n\nThe primary place of performance will be at the contractor’s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501\n\n4.0 CONTRACTOR FURNISHED PROPERTY\n\nThe Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.\n\n5.0 Points of Contact\n\nUSCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil\n\n6.0 Imagery\n\nOuter Lagging Inner Lagging","origin":"detail"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"70Z8526Q025799","place_of_performance":{"zip":"94501","state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"J020"}],"due_at":"2026-07-01T15:00:00Z","due_date":"2026-07-01","closes_at":"2026-07-01T15:00:00Z","awardable":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","state":"CA","county":"06001","county_name":"Alameda County","city":null,"city_name":null,"country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-01T01:11:37.507596Z","principal_notice_id":"c4badd92b7744228b29cdaecdee64dc8","description":{"text":"Mofification 1 to this solicitation was to correct the POP in the attached SOW.\n\nCorrect: period of performance for this contract shall be between 01JUL2026 & 15JUL26.\n\nSTATEMENT OF WORK (SOW)\n\nFOR\n\nGAS TURBINE BLEED AIR HOSE INSULATION\n\nCGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. The ship’s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).\n\n1.0 GENERAL\n\n•\n\n• Background\n\nUSCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.\n\n•\n\n• Scope\n\nThe scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.\n\n•\n\n• OBJECTIVE\n\nThe goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO’s Operational Commander.\n\n•\n\n• APPLICABLE DOCUMENTS\n\n•\n\n•\n\n• Reference Documents\n\nThe following documents may be helpful to the Contractor in performing the work described in this document:\n\nCoast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)\n\nCoast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping & Joint Ident (P1 System) Unit 2210\n\n• SPECIFIC REQUIREMENTS/TASKS\n\nExisting insulation cover dimensions are as follows:\n\nLength\n\nWidth\n\nThickness\n\nInner Layer\n\n34”\n\n22”\n\n2”\n\nOuter Layer\n\n45”\n\n28”\n\n2”\n\nFabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth “wire-inserted”. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.\n\n3.0 OTHER APPLICABLE CONDITIONS\n\n3.1 Period of Performance\n\n-\n\nThe period of performance for this contract shall be between 01JUL2026 & 15JUL26.\n\n3.2 PLACE OF PERFORMANCE\n\nThe primary place of performance will be at the contractor’s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501\n\n4.0 CONTRACTOR FURNISHED PROPERTY\n\nThe Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.\n\n5.0 Points of Contact\n\nUSCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil\n\n6.0 Imagery\n\nOuter Lagging Inner Lagging","html":"<p>Mofification 1 to this solicitation was to correct the POP in the attached SOW.&nbsp;</p>\n\n<p>Correct: period of performance for this contract shall be between 01JUL2026 &amp; 15JUL26.</p>\n\n<p></p>\n\n<p>STATEMENT OF WORK (SOW)</p>\n\n<p>FOR</p>\n\n<p><strong>GAS TURBINE BLEED AIR HOSE INSULATION</strong></p>\n\n<p></p>\n\n<p>CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. &nbsp;The ship&rsquo;s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>1.0&nbsp; GENERAL</strong></p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Background</strong>&nbsp;</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.</p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>&nbsp;</strong><strong>Scope</strong>&nbsp;</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.</p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>OBJECTIVE </strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO&rsquo;s Operational Commander.</p>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>APPLICABLE DOCUMENTS</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Reference Documents</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The following documents may be helpful to the Contractor in performing the work described in this document:</p>\n\n<p></p>\n\n<p>Coast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)</p>\n\n<p>Coast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping &amp; Joint Ident (P1 System) Unit 2210</p>\n\n<p></p>\n\n<ol>\n\t<li>SPECIFIC REQUIREMENTS/TASKS</li>\n</ol>\n\n<p></p>\n\n<p>Existing insulation cover dimensions are as follows:</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>Length</strong></p>\n\n<p><strong>Width</strong></p>\n\n<p><strong>Thickness</strong></p>\n\n<p><strong>Inner Layer</strong></p>\n\n<p>34&rdquo;</p>\n\n<p>22&rdquo;</p>\n\n<p>2&rdquo;</p>\n\n<p><strong>Outer Layer</strong></p>\n\n<p>45&rdquo;</p>\n\n<p>28&rdquo;</p>\n\n<p>2&rdquo;</p>\n\n<p></p>\n\n<p>Fabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth &ldquo;wire-inserted&rdquo;. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.</p>\n\n<p></p>\n\n<p><strong>3.0&nbsp; OTHER APPLICABLE CONDITIONS</strong></p>\n\n<p></p>\n\n<p><strong>3.1 &nbsp;Period of Performance</strong>&nbsp;</p>\n\n<p><em>-</em></p>\n\n<p>The period of performance for this contract shall be between 01JUL2026 &amp; 15JUL26.</p>\n\n<p></p>\n\n<p><strong>3.2&nbsp; PLACE OF PERFORMANCE</strong>&nbsp;</p>\n\n<p></p>\n\n<p>The primary place of performance will be at the contractor&rsquo;s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501</p>\n\n<p></p>\n\n<p>4.0&nbsp; CONTRACTOR FURNISHED PROPERTY&nbsp;</p>\n\n<p>The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.</p>\n\n<p></p>\n\n<p><strong>5.0 Points of Contact</strong></p>\n\n<p>USCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil</p>\n\n<p></p>\n\n<p><strong>6.0 Imagery</strong></p>\n\n<p>Outer Lagging&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Inner Lagging</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>","origin":"detail"},"contacts":[{"name":"McTague, Sean","role":"primary","email":"Sean.P.McTague@uscg.mil","phone":"15716143888"},{"name":"ULISES BALMACEDA","role":"secondary","email":"Ulises.O.Balmaceda@uscg.mil","phone":"2068200307"}],"place_of_performance":{"zip":"94501","state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"naics_codes":["336611"],"award":null,"attachments":[{"resource_id":"dc53858029644ea7ac21099259e3ea42","name":"SOW_Bleed Air Hose Insulation_V2 UPDATED.docx","kind":"file","mime_type":".docx","size_bytes":211526,"posted_at":"2026-06-26T17:37:03.624Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/dc53858029644ea7ac21099259e3ea42/download","mirrored":false}],"awards":[],"related":[{"key":"70Z08526RRJ001B00","latest_notice_id":"79adb3e9f10f4bceafdeca530cb99fdf","title":"TRS-3D /AN/SPS-75 Radar repairs/ overhaul services","solicitation_number":"70Z08526RRJ001B00","notice_type":"o","first_type":"o","first_posted":"2026-07-15","last_posted":"2026-11-19","notices":8,"due_at":"2026-12-01T17:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"811210","psc":"J059","set_aside":null,"state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"70Z08526Q39002B00","latest_notice_id":"c2c828ffaf9848a1a975736420ad55cf","title":"ACTUATOR,GOVERNOR","solicitation_number":"70Z08526Q39002B00","notice_type":"o","first_type":"o","first_posted":"2025-12-10","last_posted":"2025-12-10","notices":1,"due_at":"2026-12-19T16:00:00Z","due_date":"2026-12-19","closes_at":"2026-12-19T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"336611","psc":"2990","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 2990)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"}],"similar_open":[{"key":"70ZU0327QSBPL0001","latest_notice_id":"86223c5b494f4fd48dd67b18168a18c0","title":"USCG STA SAN FRANCISCO (45667) FY27 DD REPAIRS","solicitation_number":"70ZU0327QSBPL0001","notice_type":"k","first_type":"k","first_posted":"2026-11-02","last_posted":"2026-11-02","notices":1,"due_at":"2026-12-02T19:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70ZU03","office_name":"CG-SEA-C23","naics":"336611","psc":"J999","set_aside":"SBA","state":"CA","county":"06075","county_name":"San Francisco County","city":"0667000","city_name":"San Francisco","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-03T04:52:39.433634Z"},{"key":"70Z08527QLREP0001","latest_notice_id":"a152115a32dd4be7be92f00a0e46c083","title":"Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair","solicitation_number":"70Z08527QLREP0001","notice_type":"k","first_type":"k","first_posted":"2026-11-12","last_posted":"2026-11-24","notices":3,"due_at":"2026-12-07T20:30:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70ZU02","office_name":"CG-SEA-C22","naics":"336611","psc":"J999","set_aside":"SBA","state":"CA","county":"06001","county_name":"Alameda County","city":"0600562","city_name":"Alameda","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"N6264927RK003","latest_notice_id":"a5ed6a1c385f485792cc56d46933645f","title":"USNS CITY OF BISMARCK (T-EPF 9) VRA KR","solicitation_number":"N6264927RK003","notice_type":"o","first_type":"o","first_posted":"2026-11-20","last_posted":"2026-11-24","notices":2,"due_at":"2026-11-27T01:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62649","office_name":"NAVSUP FLT LOG CTR YOKOSUKA","naics":"336611","psc":"J999","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"KOR","place_scope":"overseas","state_source":null,"state_evidence":"KOREA, SOUTH","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open_total":107,"indexable":false}