Solicitation, total small business set-aside
CGC BISCAYNE BAY WATER MIST FIRE SUPPRESSION INSPECTION
70Z8526Q024276
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
May 15, 2026 at 11:00 AM EDT
Closed 194 days ago. Posted May 11, 2026. Scheduled to archive May 30, 2026.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2026
107 like it are open now in ship building and repairing
- USS HERSHEL WOODY WILLIAMS VRA
Department of the Navy, NAVSUP FLC Bahrain
SolicitationNAICS 336611Florida, PRN4033927RF502Due todayNov 25 - Sterndrive replacement
US Coast Guard, Cg-Sea-C23
Combined synopsis and solicitationSmall businessNAICS 336611Urban Honolulu, HI52000PR270001125Due todayNov 25 - CGC NEAH BAY ANCHOR WINDLASS REPAIRS
US Coast Guard, Cg-Sea-C22
Combined synopsis and solicitationSmall businessNAICS 336611Ship to Cleveland, OH70ZU0227Q0001147Due todayNov 25
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 4 days from the day the solicitation was posted, May 11, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
STATEMENT OF WORK
CGC BISCAYNE BAY OPFAC: 17504 LOCATION: ST IGNACE, MI
EQUIPMENT: Hi-Fog Water Mist Fire Suppression System
COMPONENT AFFECTED: ANNUAL INSPECTION OF SYSTEM
MPC: R-A-13380, R-M-13373, R-C-14526
Contractor must be HI-FOG certified Technician. Contractor must set up water mist system for testing; complete the water mist system test; and place water mist system back in normal operation once test is completed. Contractor must ensure all connections, fittings, and equipment within the water mist system are operating correctly as well. Contractor shall use MPC R-A-13380 as guidance.
The contractor is authorized to perform minor adjustments and tuning as required to restore the system to normal operation, provided these actions do not require any new parts or incur any additional labor costs.
Any discrepancy found that requires new parts or significant labor beyond the scope of a standard annual inspection shall be documented in the Final Service Report. The contractor shall not proceed with any repairs. The Government Technical Point of Contact (TPOC) will route the report to the Contracting Officer, who is the sole authority for authorizing any work that results in additional cost.
POP: 25MAY26-28MAY26
LOCATION/POC:
Witko, Shane CWO-2 USCG CGC BISCAYNE BAY (USA) Shane.d.witko@uscg.mil
Address:
CGC BISCAYNE BAY WTGB (104)
1075 HURON ST
ST IGNACE, MI 49781-0000
958-285-2047
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 25023-BISCAYNE BAY-SOW FOR ANNUAL WATER MIST INSPECTION_edits.docx16 KB, May 11, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 11, 2026
Solicitation
Due May 15, 2026 at 11:00 AM EDT. SAM.gov, notice 0be1f4060e08488eb9e9cc34d44bf709
1 revision on SAM
- May 11, 2026: publish, solicitation
Points of contact
- McTague, SeanSean.P.McTague@uscg.mil15716143888
- ULISES BALMACEDAUlises.O.Balmaceda@uscg.mil2068200307