Special notice
HEALY Science Winch Snatch Blocks
70Z085Q250019131
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
May 12, 2025 at 11:30 AM EDT
Closed 563 days ago. Posted May 9, 2025. Scheduled to archive May 12, 2025.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2025
107 like it are open now in ship building and repairing
- Maintenance, Repair, and Preservation of 60DS1701
Department of the Navy, Puget Sound Naval Shipyard Imf
Sources soughtNAICS 336611WashingtonN4523A27Q1005Due tomorrowNov 27 - USCGC HEALY Integrated Power Plant Support Services Contract Fiscal Year 2028-2033
US Coast Guard, Cg-Sea-C22
Sources soughtNAICS 336611Seattle, WA70ZU027ILREP1113Due in 4 daysNov 30 - Dockside (DS) – USCGC STORIS Fiscal Year 2027
US Coast Guard, Cg-Sea-C22
Combined synopsis and solicitationSmall businessNAICS 336611Seattle, WA70Z08526QLREP0026Closes in 25 daysDec 21
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
THIS IS TO BE AWARDED SOLE SOURCE
STATEMENT OF WORK (SOW)
FOR
SNATCH BLOCK SERVICE AND REPAIR
CGC Healy has a need for service and repair of multiple winch snatch blocks. The ship doesn’t have enough equipment to perform their primary science mission and has an immediate need for technical support for tasks outlined in this Statement of Work (SOW).
1.0 GENERAL
-
- Background
The 420’ WAGB asset, USCGC HEALY, has five winch snatch blocks in need of service and repair. Snatch blocks are essential for safe and effective use of the Science winch cable for performing their primary science mission. Currently the ship only has two blocks onboard in useable condition, not enough to perform the mission.
-
- Scope
The scope of this contract is defined by the efforts and tools required to support USCGC HEALY (WAGB -20 ). The Contractor shall perform service and repair to all five snatch blocks in order to return them to a useable condition. Contractor will provide replacement parts as needed. Blast and paint each block.
-
- OBJECTIVE
The goal is to return CGC HEALY science winch to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to SMILAX’s Operational Commander. The highest priority is one of the 22” blocks.
- SPECIFIC REQUIREMENTS/TASKS
Blocks to be supplied by USCG:
Serial #
Model #
15445
22-NC
15453
52-NC
15443
22-N
15452
52-N
19430
52-N
4.1 Period of Performance
The period of performance for this contract shall be 4 weeks ARO.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be at the contractors facility in Seattle, WA.
5.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 2.0.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 52000PR250019131_Healy SOW.docx35 KB, May 9, 2025
- Smart Matrix Acquisition.GOV-SERVICE.pdf18 KB, May 9, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 9, 2025
Special notice
Due May 12, 2025 at 11:30 AM EDT. SAM.gov, notice 6bae84d6da124d4eb81d6e38cfdfb66a
1 revision on SAM
- May 9, 2025: publish, special notice
Points of contact
- GEORGE, JERAMYAHJERAMYAH.W.GEORGE@USCG.MIL5104375436
- DONNA O'NEALDonna.J.O'Neal@uscg.mil5103931145