Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,509 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, total small business set-aside

KENNEBEC SWITCHBOARD REPAIRS

70Z085Q250018921

US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.

Response deadline

May 16, 2025 at 11:00 AM EDT

Closed 558 days ago. Posted May 7, 2025. Scheduled to archive May 16, 2025.

Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities

This one closed in 2025

103 like it are open now in ship building and repairing

All 103 open in ship building and repairing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 9 days from the day the solicitation was posted, May 7, 2025, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

THIS IS TO BE AWARDED BASED OFF LOWEST PRICE TECHNICHALLY ACCEPTABLE AND PAST PREFORMANCE

please provide a technical breakdown when submitting a quote "as per spec is not a technical break down."

STATEMENT OF WORK (SOW)

FOR

USCGC KENNEBEC (WLIC-75) SWITCHBOARD

CGC KENNEBEC is unable to parallel between generators and requires technical support to troubleshoot and make repairs for the tasks outlined in this SOW.

1.0 GENERAL

1.1 BACKGROUND 

While underway unit has dropped power when trying to parallel the Ship’s Service Diesel Generators (SSDG). Ship’s force worked with the Naval Engineering Detachment (NED) to replace the SSDG voltage regulators in attempt to correct the issues with negative results. The NED recommended having the switchboard groomed.

    1. ScOPE 

The scope of this contract is defined by the efforts and tools required to support
CGC KENNEBEC. The Contractor shall provide all labor, materials, and tools necessary to troubleshoot and if required make repairs.

    1. OBJECTIVE

The objective is to troubleshoot the switchboard, provide a Condition Found Report (CFR) for repairs and make effective repairs or to replace parts to return CGC KENNEBEC to recommended working, safe condition.

    1. APPLICABLE DOCUMENTS

1.4.1    Coast Guard Publications

  • Surface Forces Logistics Center Standard Specification 0000

(SFLC Std Spec 0000), 2022, General Requirements.

  • Surface Forces Logistics Center Standard Specification 3042

(SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair and Repair.

  • Surface Forces Logistics Center Standard Specification 3100

(SFLC Std Spec 3100), 2022, Inspect, Test and Recondition AC Synchronous Machines In-Place.

2.0 SPECIFIC REQUIREMENTS/TASKS

Unless otherwise stated, this contract applies to on-site support for CGC KENNEBEC in Portsmouth, VA.

2.1 TROUBLESHOOTING SWITCHBOARD

The Contractor shall conduct any troubleshooting or inspections, as deemed necessary, to determine best path forward prior to complete repairs.

      1. The Contractor shall use, monitor, and adhere to Safe Work Practices the entire duration of the job.
      2. The Contractor shall troubleshoot and provide a CFR for repairs needed.
      3. The Contractor shall preform any required test to repairs, as deemed necessary.

2.2 TEST THOROUGHLY AND DOCUMENT

The Contractor shall ensure that repairs are fully functional by performing a system operational test to be witnessed by CGC KENNEBEC Engineering Petty Officer (EPO) or the EPO’s designated representative.

2.2.1    The Contractor shall provide a trip report documenting all findings no later than 48 hours after returning to the home office.

3.0 CONTRACTOR PERSONNEL 

The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.

  1. OTHER APPLICABLE CONDITIONS

4.1 PERIOD of Performance 

The period of performance for this contract shall not exceed 14 calendar days from the date of award.

4.2 PLACE OF PERFORMANCE 

The primary place of performance will be at the location awarded, CGC KENNEBEC,
4000 Coast Guard Blvd Portsmouth, VA. 23703 unless an alternate location is approved by the U.S. Coast Guard. Access to this location/installation will be coordinated with the CGC KENNEBEC EPO.

4.3 HOURS OF OPERATION

Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the CGC KENNEBEC EPO with scheduling being subject to CGC KENNEBEC operations. 

4.4 DAILY PROGESS MEETING

The Contractor shall hold a daily progress meeting with the CGC KENNEBEC EPO and/or Commanding Officer. This meeting shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions CGC KENNEBEC personnel need to be made aware of prior to continuing work.

4.5 GENERAL REPORT REQUIREMENTS

The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications).

5.0 GOVERNMENT FURNISHED RESOURCES

Woodward 0-5 VDC Speed Setting Ctrl, Part Number: 9907-252, 2301, If Applicable

6.0 CONTRACTOR FURNISHED PROPERTY 

The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for any Government Furnished Resources specified in Section 5.0.

  1. GOVERNMENT ACCEPTANCE PERIOD

The CGC KENNEBEC EPO will inspect deliverables prior to acceptance and provide the Contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the CGC KENNEBEC EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.             

8.0 DELIVERABLES

The Contractor shall provide a trip report IAW Section 2.2.1 of this SOW.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 7, 2025

    Combined synopsis and solicitation

    Due May 16, 2025 at 11:00 AM EDT. SAM.gov, notice d592b064e41e424cb926579020f2cc06

    1 revision on SAM
    • May 7, 2025: publish, combined synopsis and solicitation

Points of contact