Special notice, total small business set-aside
CGC ALDER Single Phase Uninterruptable Power Supply (UPS)
70Z085Q250012804
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
April 28, 2025 at 11:00 AM EDT
Closed 577 days ago. Posted April 21, 2025. Scheduled to archive April 28, 2025.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2025
107 like it are open now in ship building and repairing
- USCG STA SAN FRANCISCO (45667) FY27 DD REPAIRS
US Coast Guard, Cg-Sea-C23
Combined synopsis and solicitationSmall businessNAICS 336611San Francisco, CA70ZU0327QSBPL0001Due in 6 daysDec 2 - Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair
US Coast Guard, Cg-Sea-C22
Combined synopsis and solicitationSmall businessNAICS 336611Alameda, CA70Z08527QLREP0001Closes in 11 daysDec 7 - USNS CITY OF BISMARCK (T-EPF 9) VRA KR
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
SolicitationNAICS 336611Outside the USN6264927RK003Due tomorrowNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
THIS IS TO BE AWARDED SOLE SOURCE
Statement of Work
USCGC ALDER (WLB 216)
Provide Single Phase Uninterruptable Power Supply (UPS)
1. Purpose and Scope
• Vendor shall provide the required UPS that meet MIL-STD-461, MIL-STD-810, MIL-STD-1399, MIL-STD-167, to CGC ALDER
2. Deliverables
• Vendor shall provide the following to include expedited shipping.
1. One UPS cabinet 45.17”H x 43.23” D x 23.87” wide with all items mounted. Model NEDM-C-20/10X-120-XXXHS.
2. One UPS Internal Assembly, Model NEDM20/10X-120-XXXHS
3. Two 5 kW Power Modules NEPD5KX-120-XXXHS
4. One 7.5 kVA input isolation transformer TR7.5K6-120:120
5. Includes two pairs of chassis slides for the battery drawers (Code CS)
3. Required Delivery Date
• Delivery of the UPS to CGC ALDER is required within 5 weeks of receipt of award contract.
4. Delivery Location
• Guard Sector San Fransisco
1 Yerba Buena Island
San Francisco, CA 94130
5. Roles and Responsibilities
• KTR shall provide Marine Chemist to include certification and all associated documentation for initial certification for hot work.
• KTR shall provide competent person to include certification and all associated documentation for recertification for hot work.
• KTR shall notify USCGC ALDER POC of any planned hot work prior to COB the day prior to planned hot work.
• USCGC ALDER shall provide all necessary fire watches during working hours (0700-1500).
• KTR shall provide all necessary fire watches after working hours.
6. Acceptance Criteria
• N/A
7. Security and Confidentiality
• N/A
8. Reporting Requirements
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- ALDER UPS SOW.pdf144 KB, April 21, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 21, 2025
Special notice
Due April 28, 2025 at 11:00 AM EDT. SAM.gov, notice b789b31714fc4840bb3083819b310d63
1 revision on SAM
- April 21, 2025: publish, special notice
Points of contact
- GEORGE, JERAMYAHJERAMYAH.W.GEORGE@USCG.MIL5104375436
- DONNA O'NEALDonna.J.O'Neal@uscg.mil5103931145