Special notice, total small business set-aside
L/O Flush
70Z085Q250012030
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
March 24, 2025 at 11:00 AM EDT
Closed 612 days ago. Posted March 20, 2025. Scheduled to archive March 24, 2025.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2025
107 like it are open now in ship building and repairing
- BEARING, SLEEVE
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationNAICS 336611Ship to Richmond, VASPE4A627Q0130Due in 4 daysNov 30 - SUBMARINE, THE OHIO CLASS SSBN (TRIDENT); INDICATOR, RUDDER ANGLE;
Defense Logistics Agency, DLA Aviation
PresolicitationSmall businessNAICS 336611Ship to VASPE4A727R0058Closes in 18 daysDec 14 - USNS CITY OF BISMARCK (T-EPF 9) VRA KR
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
SolicitationNAICS 336611Outside the USN6264927RK003Due tomorrowNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
THIS HAS BEEN AWARDED EMERGENT SOLE SOURCE
24100_TAB_0325_754
- ITEM 1: Main Reduction Gear and Cross Connect Gear Hydraulic System, Flush
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform a high turbulent oil flush of the Port and Starboard Main Reduction Gear (MRG) and Cross-Connect Gear (CCG) Reduction gears.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 750-WMSL 100-83, Rev A, Booklet of General Plans (NSC 5 and follow) (ASC801001) (UNSIGNED)
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems
Coast Guard Technical Publication (TP) 7073, SWBS 241, Jun 2007, Reduction Gear -Type AS 2/250-AS 198F –book 1, parts 1 thru 8
Other References
International Organization for Standardization (ISO) 4406, 1999, Hydraulic Fluid Power – Fluids – Method for Coding the Level of Contamination by Solid Particles
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not Applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.3.1 Hydraulic system. The Contractor must maintain existing hydraulic system cleanliness and take all necessary precautions to prevent the introduction of contaminants into the hydraulic system. Immediately after disconnecting or removing components from the hydraulic system, the Contractor must completely seal all openings to the rest of the system using caps for externally threaded connection points, bolt-on blanks, or taped-on discs/covers made of durable plastic or sheet-metal that is no less than 1/16-inch thick.
NOTE
Plastic bags may be used only when arrangement or configuration prevents the use of the other sealing methods specified above.
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 System flushing. The Contractor must flush the subject hydraulic system in accordance with paragraph C2.8.1 of SFLC Std Spec 5000. Submit a detailed flushing plan in accordance with paragraph C2.8.1.1 of SFLC Std Spec 5000 via a CFR.
3.2.1 Contractor must ensure the following Table 1 minimum flow rates are maintained for each circuit. If multiple loops are flushed concurrently each loop must be provided with a flow measuring device. These flow rates represent minimum flows needed to achieve a turbulent flow condition and maximize benefits of flushing effort. The Contractor must provide calibrated flow meters. Prior to flushing the certification of calibration must be shown to the CG Inspector.
TABLE 1 - MINIMUM FLOW RATE FOR FLUSHING WITH FLUID
Pipe Size inside dia, Inch
Gal/Min
To 0.5
18
0.5 to 0.75
34
0.75 to 1.0
56
1.0 to 1.25
100
1.25 to 1.5
138
1.5 to 2.0
230
2.0 to 2.5
330
2.5 to 3.0
420
NOTE
Flow rate selected for flow velocity of 25 ft/sec in the schedule 80/160 pipe, as applicable. If there is a conflict between the pressure and flow rate requirements of this specification, the minimum flow rates must be governing, unless the working pressure of the system is exceeded. The uses of by-pass (flow control) valves are not allowed downstream of the flow meters.
3.2.2 Whenever a noticeable increase in the pressure drop across strainers is observed, the strainers should be cleaned and bag renewed. Be aware that this may occur as frequency as 15 min intervals.
3.2.3 During flushing, constant monitoring of the flushing oil must be maintained to determine the contamination level. Filtering must continue until the fluid entering the return flow filter meets the particle population ISO cleanliness code of 17/14, in accordance with ISO 4406. All flushing fluid must pass through the return filter after passing through each system flushing circuit. All samples must be taken at a point just prior to this filter.
3.2.4 Take a representative sample of oil from the hydraulic system of the hydraulic system. Send samples out for laboratory analysis. Analysis must include viscosity, moisture content, total acid number, particle size and population in sufficient detail to determine ISO cleanliness code of 17/14, in accordance with ISO 4406. Submit CFR.
4. NOTES
This section is not applicable to this work item.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- SOW - 24100_TAB_0325_754_Red_Gear_Flush.doc84 KB, March 20, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 20, 2025
Special notice
Due March 24, 2025 at 11:00 AM EDT. SAM.gov, notice 7edd3b2a6f70419bba557f766cbe9187
1 revision on SAM
- March 20, 2025: publish, special notice
Points of contact
- GEORGE, JERAMYAHJERAMYAH.W.GEORGE@USCG.MIL5104375436
- DONNA O'NEALDonna.J.O'Neal@uscg.mil5103931145