Combined synopsis and solicitation, total small business set-aside
ALDER REFER REPAIR
70Z085Q250011384
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
March 5, 2025 at 11:00 AM EST
Closed 631 days ago. Posted February 25, 2025. Scheduled to archive March 5, 2025.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2025
107 like it are open now in ship building and repairing
- USCG STA SAN FRANCISCO (45667) FY27 DD REPAIRS
US Coast Guard, Cg-Sea-C23
Combined synopsis and solicitationSmall businessNAICS 336611San Francisco, CA70ZU0327QSBPL0001Due in 6 daysDec 2 - Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair
US Coast Guard, Cg-Sea-C22
Combined synopsis and solicitationSmall businessNAICS 336611Alameda, CA70Z08527QLREP0001Closes in 11 daysDec 7 - USNS CITY OF BISMARCK (T-EPF 9) VRA KR
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
SolicitationNAICS 336611Outside the USN6264927RK003Due tomorrowNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 8 days from the day the solicitation was posted, February 25, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Statement of Work Guide 1. Purpose and Scope CGC ALDER’s reach in reefer units are plagued with multiple different issues outside of SF and NED capabilities. Civilian KTR shall conduct repairs to each reefer unit, rectify all issues, and return to OEM spec. Civilian KTR shall provide all required parts, tools, and consumables to repair the three systems listed below to restore them to full functionality including condenser/evaporator components, defrost/timers, thermostatic control components, and fully charge all systems insure they are free of leaks. 2. Deliverables and Performance Requirements • Civilian KTR shall provide all required parts, tools, and consumables to repair the three systems listed below to restore them to full functionality including condenser/evaporator components, defrost/timers, thermostatic control components, and fully charge all systems insure they are free of leaks. KTR shall procure and dispose of all hazardous materials IAW all federal, state, and local laws/requirements. • Galley reach in freezer: Evaporator coil ices up coil heater is in-op and defrost timer does not cut in or out heater, condensing unit runs non-stop and icing up evaporator coil. • Salad Bar Reach in Cooler: Unit works and drops temperature to thermowell and reach but runs too long and over cools thermowell and refrigerator. • Wardroom Cooler and Freezer: Unit freezer and fridge work in reverse when operating for short time. Unit fans run separately not allowing proper air flow over evaporator. System performance is unreliable due to suspected refrigerant leaks. 3. Period of Performance Completion before 1JUN2025 4. Location and Method of Performance USCGC ALDER (WLB 216) Coast Guard Sector San Francisco 1 Yerba Buena Island San Francisco, CA 94130 5. Roles and Responsibilities Contractor shall provide all equipment described in paragraph 2. Contractor shall provide a qualified technician for all contractor equipment. Ship will provide qualified personnel to assist as needed for the operation of ship installed equipment. 6. Acceptance Criteria N/A 7. Security and Confidentiality Ship POC will escort contractor and contractor vehicle from base access to the ship. Contractor shall notify ship POC upon arrival. 8. Reporting Requirements KTR shall provide invoice/trip report within one week of completion of contracted work. 9. Legal Compliance N/A 10. Performance Monitoring Contractor will comply with all regulations described in paragraph 2. Additional Considerations Personal must be certified to service installed refrigerant systems/equipment.
THIS IS TO BE AWARDED BASED OF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PERFORMANCE.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- ALDER SWO Reach In Reefer Freezer.pdf106 KB, February 25, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 25, 2025
Combined synopsis and solicitation
Due March 5, 2025 at 11:00 AM EST. SAM.gov, notice 73102017c8034605ae0b564fdcdb1010
1 revision on SAM
- February 25, 2025: publish, combined synopsis and solicitation
Points of contact
- DONNA O'NEALDonna.J.O'Neal@uscg.mil5103931145
- GEORGE, JERAMYAHJERAMYAH.W.GEORGE@USCG.MIL5104375436