Combined synopsis and solicitation, total small business set-aside
CGC WALNUT QUINCY AIR COMPRESSOR
70Z08526Q0025240
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
July 6, 2026 at 8:00 AM EDT
Closed 143 days ago. Posted June 29, 2026, first published June 26, 2026. Scheduled to archive July 21, 2026.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2026
107 like it are open now in ship building and repairing
- NONSKID FOR NAVAL SHIPS/VESSELS
Department of the Navy, Southeast Regional Maint Center
SolicitationSmall businessNAICS 336611Jacksonville, FLN4002727R0004Due in 4 daysNov 30 - USCGC RICHARD ETHERIDGE (WPC-1102) DRYDOCK AVAILABILITY
US Coast Guard, Cg-Sea-C21
Sources soughtNAICS 336611Florida70Z08027PBPLRETHERIDGEDue in 6 daysDec 2 - USCGC HAMMER (WLIC 75302) USCG 68A BARGE (68014) DRYDOCK REPAIRS FY2027
US Coast Guard, Cg-Sea-C21
Combined synopsis and solicitationSmall businessNAICS 336611Jacksonville, FL70ZU0127QPBPL0001Due in 6 daysDec 2
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 10 days from the day the solicitation was posted, June 26, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Modification 1 is to answer the below inquire about the prouct requested. See below:
The Base mount unit is built on a none gallon tank and powered by a 7.5hp, 460/3/60. ODP, premium efficiency motor with the compressor operating at 786 rpm.
Horse power: 7.5 HP
Voltage: 450 Volts 3P/ 60Hz
Rated at 26.0 ACFM AT 175 PSIG
Control paner type: Simples-magnetic motor starter
Vibration Isolators - Pad
See also statement of work for this informtion
Solicitation Number: 70Z08526Q0025240
Project Title: CGC WALNUT QUINCY AIR COMPRESSOR
Response Deadline: 06 JUL 2026
COMBINED SYNOPSIS/SOLICITATION
This is a combined synopsis/solicitation for commercial items/services prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. Request for Quotations number is 70Z08526Q0025240 and is issued as a request for quotations (RFQ). This announcement constitutes only solicitation; quotations are being requested, and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-65 dated January 29, 2013. The NAICS Code is 336611. The small business size standard is 1250. This is a totally small business set-aside. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. All responses from interested vendors must be received on/before 06 JUL 2026 and will be reviewed by the Government.
The United States Coast Guard Surface Force Logistics Center has a requirement for the following:
Contractor shall provide parts requested for CGC WALNUT Quincy Air Compressors.
BRAND NAME JUSTIFICATION
THIS IS A BRAND NAME ONLY SOLICITATION.
Please be advised that this requirement is being posted as a Brand Name Justification. Only vendors capable of providing the exact make and model specified in the Statement of Work below are authorized to submit a bid. "Or equal" substitutions or deviations from the required specifications will not be accepted or considered for award.
STATEMENT OF WORK (SOW)
1.1 OBJECTIVE
The objective is to procure and ship replacement air compressors to the U.S. Coast Guard Cutter (CGC) WALNUT (WLB-205). The required delivery date for this purchase is 01 AUG 2026.
The compressor requirements are strict, must not be deviated from, and shall consist of the following:
Item Description
QTY
QUINCY - 340 Reciprocating Air Compressor - Model D340
7.5 hp
450 Volts 3P / 60 Hz
3
SHIPPING
1
1.2 DELIVERY REQUIREMENTS
Parts will be shipped directly to CGC WALNUT. The required delivery address is:
ATTN: MKC Jeremy Eastmead
U.S. Coast Guard Cutter Walnut
211 South Ave Ste C
Pensacola, FL 32508
1.3 POINTS OF CONTACT (POC)
For questions regarding this requirement, please contact the appropriate personnel below:
Responsibility
Name & Title
Phone
SOW / Logistics Center
LTJG Marcos Saldarriaga (SFLC-IBCTPL-ENG-AMS)
(667) 419-5729
marcos.a.saldarriaga@uscg.mil
Ship / Technical
MKC Jeremy Eastmead (Main Propulsion Chief)
(757) 464-9371
Jeremy.A.Eastmead@uscg.mil
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- SOW For QUINCY Compressors.docx38 KB, June 26, 2026
- This a combined synopsis 70Z08526Q0025240.docx16 KB, June 26, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 26, 2026
Combined synopsis and solicitation
Due July 6, 2026 at 8:00 AM EDT. SAM.gov, notice d2a52d65ee0547bd977f50b2cf73aee4
3 revisions on SAM
- June 29, 2026: publish, combined synopsis and solicitation
- June 29, 2026: publish, combined synopsis and solicitation
- June 26, 2026: publish, combined synopsis and solicitation
June 29, 2026
Combined synopsis and solicitation
Due July 6, 2026 at 8:00 AM EDT. SAM.gov, notice 3967ed67043f450d935159d0a9e9ad1e
3 revisions on SAM
- June 29, 2026: publish, combined synopsis and solicitation
- June 29, 2026: publish, combined synopsis and solicitation
- June 26, 2026: publish, combined synopsis and solicitation
June 29, 2026
Combined synopsis and solicitation
Due July 6, 2026 at 8:00 AM EDT. SAM.gov, notice 47c31c097ede46829a5d3be9a979073a
3 revisions on SAM
- June 29, 2026: publish, combined synopsis and solicitation
- June 29, 2026: publish, combined synopsis and solicitation
- June 26, 2026: publish, combined synopsis and solicitation
Points of contact
- McTague, SeanSean.P.McTague@uscg.mil15716143888
- ULISES BALMACEDAUlises.O.Balmaceda@uscg.mil2068200307