Combined synopsis and solicitation, total small business set-aside
USCGC Alder Cargo Hatch Welding
70z08526Q0024676
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
May 11, 2026 at 11:00 AM EDT
Closed 199 days ago. Posted April 30, 2026. Scheduled to archive May 26, 2026.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2026
107 like it are open now in ship building and repairing
- USCG STA SAN FRANCISCO (45667) FY27 DD REPAIRS
US Coast Guard, Cg-Sea-C23
Combined synopsis and solicitationSmall businessNAICS 336611San Francisco, CA70ZU0327QSBPL0001Due in 6 daysDec 2 - Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair
US Coast Guard, Cg-Sea-C22
Combined synopsis and solicitationSmall businessNAICS 336611Alameda, CA70Z08527QLREP0001Closes in 11 daysDec 7 - USNS CITY OF BISMARCK (T-EPF 9) VRA KR
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
SolicitationNAICS 336611Outside the USN6264927RK003Due tomorrowNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 11 days from the day the solicitation was posted, April 30, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Statement of Work
USCGC ALDER (WLB 216)
Cargo Hold Hatch Cofferdam Drain Piping Crop & Renew
1. Purpose and Scope
. KTR shall renew necessary portions of the cargo hold hatch cofferdam drain piping
located in compartment 2-30-0-AA, Cargo Hold.
2. Deliverables and Performance Requirements
. Protective measures: The KTR must furnish and install all protective measures IAW
SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment
protection).
. Interferences: The KTR must handle all interferences IAW SFLC Std Spec0000,
(Interferences).
. Contamination prevention: The KTR must take all precautions to prevent
contamination of personnel and spaces IAW all applicable Federal, state, and local
regulations.
. Fluid handling: The KTR must remove and dispose of removed fluids from the
affected piping system, IAW all applicable Federal, state, and local regulations. Do not
drain any fluids into any spaced, bilge, or exterior location.
. Piping renewal particulars: The KTR must accomplish the following tasks, using
Coast Guard Drawing 225–WLB–528–001, REV K as guidance:
o Crop out necessary length of piping (3” & 2” diameter), to include all necessary
funnel pieces of the cofferdam system.
o Fabricate necessary piping arrangement previously cropped IAW CG Drawing.
o Install all fabricated piping to include all required gaskets/seals IAW CG
Drawing.
o KTR must provide a means of sealing any open piping while any portion of the
system is open (i.e.: upstream valve blind flange).
. Pipe hangers: Furnish, fit, and install new pipe hangers, as necessary.
. Pipe labeling: The KTR must label affected piping as follows:
o Name of the piping system service.
o Destination, where feasible.
o Direction of flow, indicated by an arrow three inches long pointing away from
the lettering.
. Leak Test: After completing all authorized mechanical (i.e. threaded, bolted, etc.)
joint repairs, the Contractor must test the affected piping system's operation using the
system fluid at normal operating pressure. Ensure zero visible leakage from or
deformation of mechanical parts by repairing all leaks and discrepancies.
. Touch-up preservation: The KTR must prepare and coat all new and disturbed
surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310,
(Touch-ups and minor coating repairs.)
. Piping insulation installation: The KTR must install new insulation materials over
the exposed pipe surfaces at thicknesses appropriate to the application and temperature
ranges specified in ASTM F683 Tables.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- ALDER_SOW_CargoHoldHatchCofferdamDrainPiping_CropRenew.pdf1.5 MB, April 30, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 30, 2026
Combined synopsis and solicitation
Due May 11, 2026 at 11:00 AM EDT. SAM.gov, notice 6b6676b2d9c540c19a86465f50635c2e
1 revision on SAM
- April 30, 2026: publish, combined synopsis and solicitation
Points of contact
- Lindsay Mongiovilindsay.n.mongiovi@uscg.mil5716086752
- Justin Wooldridgejustin.r.wooldridge2@uscg.mil2068205327