Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,710 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, total small business set-aside

USCG PATOKA MOLD REMEDIATION AND RE-INSULATION

70Z08526Q0001423

US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.

Awarded

AD4K LLC

$119,690.20 obligated so far on USAspending

Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities

This one was awarded in 2026

107 like it are open now in ship building and repairing

  • USNS CITY OF BISMARCK (T-EPF 9) VRA KR

    Department of the Navy, NAVSUP FLT Log CTR Yokosuka

    SolicitationNAICS 336611Outside the USN6264927RK003
    Due tomorrowNov 27
  • Ship Repair

    Department of the Navy, NAVSUP FLC Sigonella Naples Office

    SolicitationNAICS 336611Outside the USN6817127QN013
    Due tomorrowNov 27
  • WATCH SUPV CHAIR

    Department of the Navy, NAVSUP Weapon Systems Support Mech

    SolicitationNAICS 336611Ship to the buyerN0010427QBB55
    Due tomorrowNov 27

All 107 open in ship building and repairing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 23 days from the day the solicitation was posted, January 13, 2026, to the deadline. The deadline moved once: it was first January 27, 2026 and ended as February 5, 2026.
How it ended
Awarded to AD4K LLC on May 12, 2026, 96 days after offers were due. The contracting office reported 11 offers (competed under simplified acquisition procedures).

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

This RFQ had been extented to close on 02/05/2026 to give an opportunitty to all vendors to do cite visit for this requirenment. Please feel free to contact the below POC if requesting any cite visit:

michael.d.zimmer2@uscg.mil

MKC Michael Zimmer

WLR/WLM Asset Manger

USCG Surface Forces Logistics Center

2401 Hawkins Point RD

Baltimore, MD. 21226

This is a combined synopsis/solicitation

This is a combined synopsis/solicitation for commercial items/services prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. Request for Quotations number is 70Z08526Q0001423 and is issued as a request for quotations (RFQ). This announcement constitutes only solicitation; quotations are being requested, and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-65 dated January 29, 2013. The NAICS Code is 336611. The small business size standard is 1250. This is a totally small business set aside. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. All responses from interested vendors must be received on/before 0800 Pacific Time, January 27th, 2026, and will be reviewed by the Government.   

The United States Coast Guard Surface Force Logistics Center has a requirement for the following:

Contractor shall provide parts requested for USCGC PATOKA Mold Remediation Spare Parts:

 STATEMENT OF WORK (SOW)

FOR

USCGC PATOKA MOLD REMEDIATION AND REINSULATION

PATOKA discovered mold in their berthing and common areas and has an immediate need for technical support for tasks outlined in this Statement of Work (SOW).

1.0 GENERAL

    1. Background 

The 75’ WLR asset, USCGC PATOKA, had a previous mold remediation completed were contractors removed and replaced approximately 1510 square feet of overhead and bulkhead insulation and panels. However, the contractor did not fill all the air gaps between the false bulkhead and the bulkhead, leaving room for air to condensate on the panels.  The contractor also installed the incorrect panels, using a type of steel instead of aluminum, this steel paneling has begun to rust as moisture condenses on the panels.  

    1.  Scope 

The scope of this contract is defined by the efforts and tools required to support USCGC PATOKA (WLR 75408). The Contractor shall provide all labor, materials, and tools necessary to remove insulation, remediate mold (if found), reinsulate leaving no air gaps between false bulkhead and bulkhead, and install new aluminum panels.

    1. OBJECTIVE

The goal is to return CGC PATOKA air quality and habitability conditions to acceptable conditions.

    1. APPLICABLE DOCUMENTS

      1. Compliance Documents

The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:

               

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2022, General Requirements

29 Code of Federal Regulations (CFR) Part 1915, Occupational Safety and Health Standards for Shipyards 

ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery

NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details

  1. SPECIFIC REQUIREMENTS/TASKS

Unless otherwise stated, this contract applies to on-site support for USCGC PATOKA (WLR 75408) in GREENVILLE, MS.

2.1 Remediate Mold

The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.

      1. The Contractor shall remove all overhead and bulkhead panels in the following spaces (all square footage is an estimate):
        1.   Bridge (234 sq. ft.)
        2.   OIC Stateroom (330 sq. ft.)
        3.   CPO Stateroom (275 sq. ft.)
        4.   CPO Head (40 sq. ft.)
        5.   CPO Passageway (25 sq. ft)
        6.   Main Deck Passageway
        7.   Log Office (182 sq. ft.)
        8.   Crew Berthing (490 sq. ft.)
        9.   Crew Head (84 sq ft)
        10. Laundry (91 sq. ft.)
        11. Galley (79.6 sq. ft.)
        12. Messdeck (240 sq. ft.)
      2. The contractor shall remove any interferences such as structures, lights, outlets, speakers, and alarms and work with the Engineer Petty Officer (EPO) or the EPO’s designated representative to ensure power is properly secured before removal.
      3. The Contractor shall remove and dispose of all existing insulation in areas designated in section 2.1.1.
      4. The Contractor shall remove all existing wood support beams in areas designated in section 2.1.1.
      5. The Contractor shall test for mold in in areas designated in section 2.1.1..
      6. The Contractor shall remediate all mold discovered.
        1. Contractor shall use industry standard means of remediation that are approved by federal and state agencies governing mold remediation.
      7. The Contractor shall conduct mold testing to the areas designated in section 2.1.1 to ensure mold was properly remediated.
        1. Testing shall include industry standard means of surface testing as well as air quality testing in the designated spaces in section 2.1.1. 
      8. The Contractor shall install plastic sheeting to all the areas where the bulkhead and overhead panels were removed to prevent insulation dust/debris falling on the crew while underway.

2.2 Test Thoroughly and Document

The Contractor shall ensure the cutter is fully remediated of mold by preforming a walkthrough of all spaces identified in section 2.1.3. with the Engineer Petty Officer (EPO) or the EPO’s designated representative.

2.2.1    The Contractor shall provide a trip report documenting all findings no later             than 7 days after returning to the home office.

    1. Reinsulating and Paneling
      1. Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
      2. Removal. The Contractor shall remove all existing insulation material over the designated pipe surfaces, including associated pipe hangers, valves, fittings, and flanges.
      3. New insulation installation - interior refrigerant, hot water and cold and chill water piping systems (Temperature Range: -20 to +180 Deg. F). The Contractor shall install new insulation material over the exposed pipe surfaces, including associated pipe hangers, valves, fittings, and flanges, in accordance with details in NAVSEA Drawing 804-5959214; select appropriate insulation materials and thicknesses for the application and temperature ranges specified in ASTM F683, Tables S1.1 and 5.
      4. Preservation. The Contractor shall paint the newly installed insulation system, in accordance with SFLC Std Spec 6310, using the system specified for “Insulation Surfaces, Fiberglass Sheet/Closed Cell PVC Foam” in Appendix B (Cutter and Boat Interior Paint Systems).
      5. Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
      6. The Contractor shall install new wood support beams in areas designated in section 2.1.1.
      7. The Contractor shall install new bulkhead insulation that fills the air gap between the false bulkhead panels and the bulkhead meeting Coast Guard Specification 164.109/37/0 in areas designated in section 2.1.1.
      8. The Contractor shall install new aluminum false bulkhead paneling in areas designated in section 2.1.1..
      9. The Contractor shall reinstall any interferences and ensure electrical components have the proper covers installed.

  1. CONTRACTOR PERSONNEL 

3.1          The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.

  1. OTHER APPLICABLE CONDITIONS

    1. Interferences

The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3. (Interferences). Known interferences include, but are not limited to the following:

  • Outlets
  • Lighting
  • Fan units
  • Alarms
  • Speakers
  • Switches
  • Windows

    1. PERIOD of PERFORMANCE: 16FEB2026-02MAR2026

The period of performance for this contract shall not exceed 14 calendar days from the date of award unless approved by the contracting officer.

4.3 PLACE OF PERFORMANCE 

The primary place of performance will be at CGC PATOKA at 1797 Harbor Front RD, Greenville, MS 38701 unless an alternate location is approved by the Coast Guard.

4.4 HOURS OF OPERATION

Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays).  However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Petty Officer (EPO) as scheduling is subject to ship’s operations. 

4.5 TRAVEL 

Contractor travel may be required to support this requirement.  All travel required by this task shall be provided by the Contractor at no expense to the Government.

5.0 GOVERNMENT FURNISHED RESOURCES

NONE

6.0 CONTRACTOR FURNISHED PROPERTY 

The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.

  1. GOVERNMENT ACCEPTANCE PERIOD

The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance.  If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.             

8.0 DELIVERABLES

The Contractor shall provide a trip report and warranty no later                         than 7 days after returning to the home office.

9.0 NOTES

    1. List of known suppliers. Below is a list of known manufacturers/suppliers:
      1. Temperature Inc.

7500Appling Center Dr

Memphis TX 38133

(901)388-4706 O

(901)331-8683 C

Industrial Commercial Marine(ICM) (410) 771-8070

Advanced Thermal Products (ATP), Inc. (800) 826-8417

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

Recipient
AD4K LLC
UEI
DW2MG391FCJ6
CAGE
9SCX3
Vendor location
Buford, GA
Contract
70Z08526PIBCT0089, purchase order
Obligated
$119,690.20
Actions
3 between May 12, 2026 and October 28, 2026
Competition
Competed Under SAP, 11 offers received
Set-aside reported
No Set Aside Used.
Described as
Mold Remediation
Match
solicitation number 70Z08526Q0001423 equals the FPDS solicitation identifier; same awarding office 70Z085 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 13, 2026

    Combined synopsis and solicitation

    Due January 27, 2026 at 11:00 AM EST. SAM.gov, notice d33f22c259a94e76b28d15ea92fbc4e7

    2 revisions on SAM
    • January 23, 2026: publish, combined synopsis and solicitation
    • January 13, 2026: publish, combined synopsis and solicitation
  2. January 23, 2026

    Combined synopsis and solicitation

    Due February 5, 2026 at 11:00 AM EST. SAM.gov, notice 91c837220bb44a91aa59e58648aea4c0

    2 revisions on SAM
    • January 23, 2026: publish, combined synopsis and solicitation
    • January 13, 2026: publish, combined synopsis and solicitation

Points of contact