Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,708 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, total small business set-aside

USCGC Stratton Load Bank Test

70Z08526Q0001332

US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.

Response deadline

December 4, 2025 at 11:00 AM EST

Closed 357 days ago. Posted December 2, 2025. Scheduled to archive December 19, 2025.

Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities

This one closed in 2025

107 like it are open now in ship building and repairing

All 107 open in ship building and repairing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 2 days from the day the solicitation was posted, December 2, 2025, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

SOW for #1 SSDG Load Bank Testing

 USCGC STRATTON (WMSL-752)

  1. This solicitation is to provide:

Load bank testing of 01 SSDG for CGC STRATTON

  1.  Vendor to Perform work at ships homeport:

CGC STRATTON

UNITED STATES COAST GUARD BASE ALAMEDA

1 EAGLE ROAD ALAMEDA, CA 94501

  1. Security requirements: No special security requirements needed. Vendor will only require base and ship access during POP.

  1. POP: 08DEC25 – 12DEC25

  1. POC:
  • STRATTON Engineer Officer:

LCDR Benjamin Williamsz

443-875-7156

  • STRATTON Port Engineer:

LTJG Summer Gould

206-827-5310

  • STRATTON APM:

LT Adrian Rubio

657-944-8163

31100_BEC_0924_418

WORK ITEM 1: Ship Service Diesel Generator, Load testing, perform

1.  SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform load testing of designated Ship Service Diesel Generator (i.e., SSDG) listed in Table 1.

TABLE 1 – LIST OF SHIP SERVICE GENERATOR

CATERPILLAR mODEL NO.

DESCRIPTION

location

3512B

No.1 Ship Service Diesel Generator (NSC 009), 1360 KW, 450 Volt AC, 3 Phase, 60 Hz

Auxiliary Machinery Room (5-36-01-E)

1.2 Government-furnished property.

None.

2.  REFERENCES

Coast Guard Drawings

Coast Guard Drawing 750-WMSL-501-002, Rev E, Machinery Arrangements (ASC501001)

Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans

Coast Guard Publications

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Coast Guard Technical Publication (TP) 7119, Ship Service Diesel Generator - Model 3512B

Coast Guard Technical Publication (TP) 7165B, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power – Operation, Maintenance & Installation – Volume 1

Coast Guard Technical Publication (TP) 7166B, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power – Operation, Maintenance & Installation – Volume 2 & 4

Coast Guard Technical Publication (TP) 7167, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power – Operation, Maintenance & Installation – Volume 3

Other References

COMDTINST 9077.1 (series) Equipment Lockout-Tags-Plus Instruction

MIL-STD-1310, Sep 2009, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety

3.  REQUIREMENTS

3.1 General. contractor to provide load bank and OEM technical representative services to oversee overall break-in and run-up procedures for reassembled Caterpillar 3512B engine, to include all steps required from initial startup to satisfactory completion of 100% load operation for OEM prescribe timeframe.

3.1.1 CIR.

None.

3.1.2 Tech Rep. 

None.

3.1.3 Protective measures.  The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences.  The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

  • Piping
  • Electrical Cables
  • Switchboard Enclosure
  • Vent Ducting
  • Motor Operated Valves

3.1.5 Background information.  SSDG listed in Table 1 will be modified by the Coast Guard for the following task:

  • Generator Bearing Replacement
  • Shaft Alignment
  • Pinning and Machine Work
  • Diesel Engine Top-end Overhaul

3.1.5.1 After completion of above listed tasks, this Work Item is to be used for the Contractor to perform load testing of designated SSDG listed in Table 1.

3.2 Work location. The concerned work area is listed in Table 1. See the applicable drawings in References in Paragraph 2 for guidance, locations, and details.

3.2.1 Proposed temporary cable routing must be developed using USCG Dwg 418A-WMSL-801-001. Submit a CFR.

3.2.1.1 Temporary load bank cables must be routed from the switchboard to the load bank via a single route, and must not be routed separately by any method which would lead to unbalanced phase cables to transit through hull or bulkhead openings.

3.3 Grounding.  The Contractor must ensure conductive surfaces of the load bank enclosure are appropriately bonded and grounded for protection of personnel.

3.4 Contractor Furnished Materials (CFM).  The Contractor must furnish materials listed in the Table 2 for load testing of the SSDG listed in Table 1.

TABLE 2 – CONTRACTOR furnish MATERIALS

MATERIALS

description

SOURCE OF SUPPLY

Load Bank

1500 KW, 450 Volt AC, 3 Phase, 60 Hz, Resistive

Electrical Equipment’s Rental Company

Load Bank Cables

Approximate length of 300 Feet Cables with ring tongue compression lugs, 6 Paralleled #4/0 copper (single conductor) per phase (18 Total x 300 Feet) and one additional length for the equipment grounding conductor or Six LSTSGU-400

Tony Santiago
Murray Benjamin Electric
397 West Ave.

Stamford CT 06902
(203-705-2100) OR Any Electrical Cable Supplier

3.4.1 The contractor must provide miscellaneous hardware required for electrical installation (i.e. Nylon Stuffing Tubes, Chafing Gear, Box Connectors, Lugs, Fasteners, Wire Nuts, Tapes, Cable ties & Cable Mounting Brackets, etc) of the electrical equipment.

3.5 Load testing.  The Contractor must provide labor and crane services as necessary for placing load bank at suitable location (i.e., On the pier or the ship). After completion of load bank testing of SSDG, the Contractor must remove all installed equipment and cables used during testing.

3.5.1 Testing plan. The Contractor must submit a plan for load testing of the SSDG in accordance with TP 7119.

3.5.1.1 The plan must cover the following topics at a minimum:

  • Steady increase of load in multiple steps up to 100% real power load
  • No less than 2 hours of continuous testing at 100% load
  • Simulated start of 450 HP load (assume no more than 200% FLA)
  • Emergency shutdown procedures
  • Load bank specification and location
  • Cable locations for load bank
  • No-load tests 
  • Data to be collected during tests
  • All proposed connections, cable and load bank configurations

3.5.1.2 The Contractor must start testing of the SSDG after COR Approval of submitted Test Plan and official acceptance by the Contract Officer (KO).

3.5.2 After placing load bank at suitable location (i.e., On the pier or the ship) the Contractor must install the cables from the load bank to associated SS Switchboard bus bars (i.e. Back side of SS Switchboard No.2S), according to the agreed upon cable routing. 

CAUTION

THE BACK SIDE OF THE SWITCHBOARD SHOULD BE ROPED OFF AS A PERSONNEL EXCLUSION AREA (APPROXIMATELY 10 FOOT RADIUS FROM ANY VISIBLE LIVE BUS

3.5.2.1 The Contractor must route the cables from designated SSDG to load bank through hatches and passageway. The Contractor must run cables in overheads as much as possible to avoid trip hazards.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

SAFETY

At any point in the load test or operational testing period if the need presents itself the engine – Prime mover may be shut down by the Tech rep with communication to the USCG operational Engineer utilizing the local EOS, E stop or shut down from the switch gear.  Any of the three options will automatically open the SSDG buss breaker

3.5.3 After warmup of SSDG until coolant temperature reaching 140 Degree F, the Contractor must perform the load testing of designated SSDG listed in Table 1 at following load condition.

TABLE 3 – LOAD TESTING

LOAD

HOURS

 *No Load

0.5 Hrs

25 % Load

0.5 Hrs

50 % Load

0.5 Hrs

75 % Load

0.5 Hrs

100 % Load

2.0 Hrs

No Load

0.5 Hrs

  • Running no load testing. No load testing will consist of running the engine at idle rpm until the engine coolant temperature reaches 140 deg. F during that warmup time safety testing will be performed for oil pressure, temp warning, emergency shut down conditions, and coolant temp. warning and shutdown. Shipboard alarm verification will be observed at that time as well.

3.5.3.1 Engine parameter readings during the load bank test must be taken every 15 minutes including, but not limited to the bullet points in this paragraph. Submit a CFR.

  • Engine temp, Coolant temp, oil pressure, boost pressure, intake air temp after the aftercooler, exhaust stack temp, left and right bank exhaust temperatures.
  • In addition to the generator load test form, a Caterpillar steady state engine performance file shall be recorded on the engine ECM all related available information.
  • Generator information, voltage reading per phase, amperage readings per phase, HZ, bearing and winding temps.
  • Pre and post-test PSSRP shall be saved on the ECM to provide verification of all available diagnostic codes and events.
  • All electronic files and reports must be submitted via CFR.

3.6 Load test documentation.  After completion of testing, the Contractor must provide all collected data sheets to the Contracting Officer.

4.  NOTES

This section is not applicable to this work item.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. December 2, 2025

    Combined synopsis and solicitation

    Due December 4, 2025 at 11:00 AM EST. SAM.gov, notice 537307f402f94f79a70b2db313bca716

    1 revision on SAM
    • December 2, 2025: publish, combined synopsis and solicitation

Points of contact