Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,708 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, total small business set-aside

CGC HAMILTON - Exhaust piping, Renew

70Z08525Q12600

US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.

Response deadline

April 14, 2025 at 11:00 AM EDT

Closed 591 days ago. Posted April 11, 2025. Scheduled to archive April 14, 2025.

Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities

This one closed in 2025

107 like it are open now in ship building and repairing

All 107 open in ship building and repairing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 3 days from the day the solicitation was posted, April 11, 2025, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

Please see attached SOW. 

EDD/POP: 4/21/25-4/25/25

Place of performance: 

CGC HAMILTON

Attn: Engineering Officer

1050 Register St.

North Charleston, SC 29405

Please submit all bids to Tyler.K.Melton@uscg.mil NLT 0800 14APR25. Please submit your quote in PDF format and provide as detailed description of how your estimate was reached to speed up the review process.

1. SCOPE  

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs for Coast Guard vessels performed by commercial contractors at USCG Facilities.  

 
2. REFERENCES  

 
COAST GUARD DRAWINGS  

 
None.  

 
COAST GUARD PUBLICATIONS  

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements  

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes  

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response  
 

OTHER REFERENCES  

None  

3. REQUIREMENTS  

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.  

  

3.2 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.  

3.3 Fire Prevention. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550. Coordinate with COR/KO and submit to upon contract award.

3.3.1 Fire Watch. The Coast Guard will provide fire watch personnel and equipment.  

3.4 Period of Performance. The period of performance for this work is 21 April 2025 through 25 April 2025. 

3.5 Location. The Contractor must perform the work while the USCGC HAMILTON is alongside the pier at the Federal Law Enforcement Training Center (corner of S. Hobson Ave and Chaffe St), Charleston, SC 29405. 

3.6 FLETC Base access is required. Vendor must have a valid US driver’s license and show identification. Contractors working on this project must not have felony convictions. Forms will be provided for base access. A CG representative from the cutter will sponsor and escort vendor to the cutter. 

S25_000_23410_BJA_0425_754

  1. ITEM 1: Nr. 3 SSDG Exhaust Piping, Renew

1.  SCOPE

1.1 Intent.  This work item describes the requirements for the Contractor to renew a section of exhaust piping and install lagging for the Nr.3 Ships Service Diesel Generator.

2.  REFERENCES

Coast Guard Drawings

Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements 

Coast Guard Drawing 750-WMSL-100-041, Rev H, Unit 3220 Structure 1st Platform to 2nd Deck – FR 76 to 88

Coast Guard Drawing 750-WMSL-508-001, Rev C, Piping and Machinery Insulation Schedule and L/M

  Coast Guard Publications

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

Other References

None

3.  REQUIREMENTS

3.1 General.

3.1.1 CIR. 

None.

3.1.2 Tech Rep. 

Not applicable.

3.1.3 Protective measures.  The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences.  The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

  • Oil in bilges (gas free certification required for hot work)
  • Fuel tank 5-44-0-F
  • Deck plating/grating
  • Piping
  • Piping Supports

3.1.5 Gas Free. The Contractor must certify and maintain work area to a condition ‘Safe for Hotwork’ in accordance with SFLC Std Spec 0740 paragraph 3.3.

3.1.5.1 The affected piping is in the Central Storeroom, 1st Platform, Frame 77.

3.1.6 Fluid handling. The Contractor must remove and dispose of removed fluids from the affected piping system and any cleaning fluids, in accordance with all applicable Federal, state, and local regulations and SFLC Std Spec 0000

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 11, 2025

    Combined synopsis and solicitation

    Due April 14, 2025 at 11:00 AM EDT. SAM.gov, notice 683e758a99fa41cc8ad75b003562ff5c

    1 revision on SAM
    • April 11, 2025: publish, combined synopsis and solicitation

Points of contact