# CGC STRATTON - Overhaul repair load Bank testing

Canonical: https://sealedbidder.com/opportunities/70z08525q02333

- Solicitation number: 70Z08525Q02333
- Notice type: Combined synopsis and solicitation
- Status: Closed. Deadline was February 10, 2025 at 8:00 AM EST
- Department: Department of Homeland Security
- Agency: US Coast Guard
- Contracting office: SFLC Procurement Branch 2 (70Z085)
- NAICS: 336611 Ship Building and Repairing
- Product or service code: 2090 Miscellaneous Ship and Marine Equipment
- Set-aside: Total small business set-aside
- Small business size standard: 1,300 employees (13 CFR 121.201, NAICS 336611)
- Place of performance: California
- Who can bid, by location: Anywhere in the US. Location does not limit who can bid: a product shipped to the buyer, research at the performer's facility, or work at the contractor's site. A state shown is the delivery point.
- County: Alameda County (FIPS 06001). https://sealedbidder.com/counties/alameda-county-ca-06001
- First posted: February 3, 2025
- Last posted: February 3, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/f4a95ccbe0d4455ea60b8733ee7bdf05/view

## Reading this notice

- Kind of notice: Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates.
- Time to respond: Bidders had 7 days from the day the solicitation was posted, February 3, 2025, to the deadline.

## Description

WORK ITEM 1: Ship Service Diesel Generator, Load testing, perform

1.  SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform load testing of designated Ship Service Diesel Generator (i.e., SSDG) listed in Table 1.

TABLE 1 &ndash; LIST OF SHIP SERVICE GENERATOR

CATERPILLAR mODEL NO.

DESCRIPTION

location

3512B

No.2 Ship Service Diesel Generator,1360 KW, 450 Volt AC, 3 Phase, 60 Hz

Forward Main Machinery Room (5-44-01-E)

1.2 Government-furnished property.

None.

2.  REFERENCES

Coast Guard Drawings

Coast Guard Drawing 750-WMSL-501-002, Rev E, Machinery Arrangements (ASC501001)

Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans

Coast Guard Publications

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Coast Guard Technical Publication (TP) 7119, Ship Service Diesel Generator - Model 3512B

Coast Guard Technical Publication (TP) 7165B, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power &ndash; Operation, Maintenance & Installation &ndash; Volume 1

Coast Guard Technical Publication (TP) 7166B, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power &ndash; Operation, Maintenance & Installation &ndash; Volume 2 & 4

Coast Guard Technical Publication (TP) 7167, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power &ndash; Operation, Maintenance & Installation &ndash; Volume 3

Other References

COMDTINST 9077.1 (series) Equipment Lockout-Tags-Plus Instruction

MIL-STD-1310, Sep 2009, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety

3.  REQUIREMENTS

3.1 General. contractor to provide load bank and OEM technical representative services to oversee overall break-in and run-up procedures for reassembled Caterpillar 3512B engine, to include all steps required from initial startup to satisfactory completion of 100% load operation for OEM prescribe timeframe.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

None.

3.1.3 Protective measures.  The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences.  The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

	Piping

	Electrical Cables

	Switchboard Enclosure

	Vent Ducting

	Motor Operated Valves

3.1.5 Background information.  SSDG listed in Table 1 will be modified by the Coast Guard for the following task:

	Generator Bearing Replacement

	Shaft Alignment

	Pinning and Machine Work

	Diesel Engine Top-end Overhaul

3.1.5.1 After completion of above listed tasks, this Work Item is to be used for the Contractor to perform load testing of designated SSDG listed in Table 1.

3.2 Work location. The concerned work area is listed in Table 1. See the applicable drawings in References in Paragraph 2 for guidance, locations, and details.

3.2.1 Proposed temporary cable routing must be developed using USCG Dwg 418A-WMSL-801-001. Submit a CFR.

3.2.1.1 Temporary load bank cables must be routed from the switchboard to the load bank via a single route, and must not be routed separately by any method which would lead to unbalanced phase cables to transit through hull or bulkhead openings.

3.3 Grounding.  The Contractor must ensure conductive surfaces of the load bank enclosure are appropriately bonded and grounded for protection of personnel.

3.4 Contractor Furnished Materials (CFM).  The Contractor must furnish materials listed in the Table 2 for load testing of the SSDG listed in Table 1.

TABLE 2 &ndash; CONTRACTOR furnish MATERIALS

MATERIALS

description

SOURCE OF SUPPLY

Load Bank

1500 KW, 450 Volt AC, 3 Phase, 60 Hz, Resistive

Electrical Equipment&rsquo;s Rental Company

Load Bank Cables

Approximate length of 300 Feet Cables with ring tongue compression lugs, 6 Paralleled #4/0 copper (single conductor) per phase (18 Total x 300 Feet) and one additional length for the equipment grounding conductor or Six LSTSGU-400

Tony Santiago

Murray Benjamin Electric

397 West Ave.

Stamford CT 06902

(203-705-2100) OR Any Electrical Cable Supplier

3.4.1 The contractor must provide miscellaneous hardware required for electrical installation (i.e. Nylon Stuffing Tubes, Chafing Gear, Box Connectors, Lugs, Fasteners, Wire Nuts, Tapes, Cable ties & Cable Mounting Brackets, etc) of the electrical equipment.

3.5 Load testing.  The Contractor must provide labor and crane services as necessary for placing load bank at suitable location (i.e., On the pier or the ship). After completion of load bank testing of SSDG, the Contractor must remove all installed equipment and cables used during testing.

3.5.1 Testing plan. The Contractor must submit a plan for load testing of the SSDG in accordance with TP 7119.

3.5.1.1 The plan must cover the following topics at a minimum:

	Steady increase of load in multiple steps up to 100% real power load

	No less than 2 hours of continuous testing at 100% load

	Simulated start of 450 HP load (assume no more than 200% FLA)

	Emergency shutdown procedures

	Load bank specification and location

	Cable locations for load bank

	No-load tests

	Data to be collected during tests

	All proposed connections, cable and load bank configurations

3.5.1.2 The Contractor must start testing of the SSDG after COR Approval of submitted Test Plan and official acceptance by the Contract Officer (KO).

3.5.2 After placing load bank at suitable location (i.e., On the pier or the ship) the Contractor must install the cables from the load bank to associated SS Switchboard bus bars (i.e. Back side of SS Switchboard No.2S), according to the agreed upon cable routing.

CAUTION

THE BACK SIDE OF THE SWITCHBOARD SHOULD BE ROPED OFF AS A PERSONNEL EXCLUSION AREA (APPROXIMATELY 10 FOOT RADIUS FROM ANY VISIBLE LIVE BUS

3.5.2.1 The Contractor must route the cables from designated SSDG to load bank through hatches and passageway. The Contractor must run cables in overheads as much as possible to avoid trip hazards.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

SAFETY

At any point in the load test or operational testing period if the need presents itself the engine &ndash; Prime mover may be shut down by the Tech rep with communication to the USCG operational Engineer utilizing the local EOS, E stop or shut down from the switch gear.  Any of the three options will automatically open the SSDG buss breaker

3.5.3 After warmup of SSDG until coolant temperature reaching 140 Degree F, the Contractor must perform the load testing of designated SSDG listed in Table 1 at following load condition.

TABLE 3 &ndash; LOAD TESTING

LOAD

HOURS

 *No Load

0.5 Hrs

25 % Load

0.5 Hrs

50 % Load

0.5 Hrs

75 % Load

0.5 Hrs

100 % Load

2.0 Hrs

No Load

0.5 Hrs

	Running no load testing. No load testing will consist of running the engine at idle rpm until the engine coolant temperature reaches 140 deg. F during that warmup time safety testing will be performed for oil pressure, temp warning, emergency shut down conditions, and coolant temp. warning and shutdown. Shipboard alarm verification will be observed at that time as well.

3.5.3.1 Engine parameter readings during the load bank test must be taken every 15 minutes including, but not limited to the bullet points in this paragraph. Submit a CFR.

	Engine temp, Coolant temp, oil pressure, boost pressure, intake air temp after the aftercooler, exhaust stack temp, left and right bank exhaust temperatures.

	In addition to the generator load test form, a Caterpillar steady state engine performance file shall be recorded on the engine ECM all related available information.

	Generator information, voltage reading per phase, amperage readings per phase, HZ, bearing and winding temps.

	Pre and post-test PSSRP shall be saved on the ECM to provide verification of all available diagnostic codes and events.

	All electronic files and reports must be submitted via CFR.

3.6 Load test documentation.  After completion of testing, the Contractor must provide all collected data sheets to the Contracting Officer.

4.  NOTES

This section is not applicable to this work item.

## Attachments

- [STRATTON_Statement of Work_SSDGLoadbankTest.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2d33acce525343529ba4fc0cd9911fa4/download)

## Open now in the same industry

107 open in NAICS 336611.

- USCG STA SAN FRANCISCO (45667) FY27 DD REPAIRS (70ZU0327QSBPL0001), due December 2, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/70zu0327qsbpl0001
- Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair (70Z08527QLREP0001), due December 7, 2026 at 3:30 PM EST. https://sealedbidder.com/opportunities/70z08527qlrep0001
- USNS CITY OF BISMARCK (T-EPF 9) VRA KR (N6264927RK003), due November 26, 2026 at 8:00 PM EST. https://sealedbidder.com/opportunities/n6264927rk003

## Publications

- February 3, 2025: Combined synopsis and solicitation, due February 10, 2025 at 8:00 AM EST. Notice f4a95ccbe0d4455ea60b8733ee7bdf05. https://sam.gov/workspace/contract/opp/f4a95ccbe0d4455ea60b8733ee7bdf05/view