Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,690 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, total small business set-aside

USCGC ALEX HALEY BOILER TUBE REPAIR & CLEANING

70Z08525Q0030215

US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.

Awarded

Walashek Industrial & Marine, Inc.

$48,747.00 obligated so far on USAspending

Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities

This one was awarded in 2025

107 like it are open now in ship building and repairing

All 107 open in ship building and repairing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 7 days from the day the solicitation was posted, September 11, 2025, to the deadline.
How it ended
Awarded to Walashek Industrial & Marine, Inc. on September 19, 2025, 1 day after offers were due. The contracting office reported 1 offer (competed under simplified acquisition procedures).

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

This is a combined synopsis/solicitation

This is a combined synopsis/solicitation for commercial items/services prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. Request for Quotations number is 70Z08525Q0030215 and is issued as a request for quotations (RFQ). This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-65 dated January 29, 2013. The NAICS Code is 336611. The small business size standard is 1250. This is a totally small business set aside. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. All responses from interested vendors must be received on/before 0800 Pacific Time, September 8th, 2025, and will be reviewed by the Government.   

The United States Coast Guard Surface Force Logistics Center has a requirement for the following:

Contractor shall provide parts requested for USCGC ALEX HALEY Boiler Repair and Cleaning. CTR shall provide the following:

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.3 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550

3.4 Materials. The Contractor must obtain all the materials required to complete this job.

3.5. Period of Performance. The period of performance for this work starts on 19 September 2025 and ends on 26 September 2025.

3.6. Location. The Contractor must perform the work while the USCGC Alex Haley (WMEC 39) is alongside the pier on USCG Base Seattle, 1519 Alaskan Way S, Seattle, WA 98134. The Contractor must provide full name, date of birth, and driver’s license number of contractors, subcontractors, and technical representatives to the designated USCG representative at least 48 hours prior to arriving on-site. Contractor does not require access to designated restricted and/or controlled access spaces on the ship in execution of this work.

3.7 Release of References. For any listed references to be distributed, the contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide your JCP number and expiration date to the listed point of contact (POC) for this work. 

3.8 Solicitation Period Site-Visit. The Contractor can perform a ship check during the solicitation period of this requirement. The Contractor must contact the designated points of contact (POC) at least 24 hours prior to requested access for USCG to process with security. Access prior to award cannot be guaranteed and will depend on the availability of the ship’s crew and the Contractor providing request documentation needed for access. USCG is not responsible for any costs associated with the Contractor’s site visit.

3.9 Documentation for Contractor’s Proposal. The Contractor must include at least the following in their proposal for this requirement: basic information (name, company name, contact details, the date, Unique Entity ID), company overview, past performance (if applicable), project outline and schedule for listed period of performance, technical representative certifications and qualifications, and signature of the authorized person. 

3.10 Points of Contact. The USCG Technical POCs for this requirement include but are not limited to the following: 

3.10.1 SFLC-LREPL, Asset Manager, LT Mike Axelsson, Mikael.J.Axelsson@uscg.mil 

3.10.2 USCGC Alex Haley, Engineer Officer, LT Alex Murdoch, Alexander.S.Murdoch@uscg.mil

51700_BJA_0925_282

  1. ITEM 1: Boiler #2, Repair

1.  SCOPE

1.1 Intent.  This work item describes the requirements for the Contractor to perform work on a Cyclotherm MC-2500 auxiliary boiler. #2 boiler is a two pass, horizontal fire tube unit to recover from water infiltration in the fireside

1.2 Government-furnished property.

None

2.  REFERENCES

Coast Guard Drawings

Coast Guard Drawing 282-WMEC 545-014, Rev M, Diagram Ships Heating & Aux Steam System

Coast Guard Drawing 282-WMEC 601-002, Rev H, Booklet of General Plans

Coast Guard Publications

Coast Guard Technical Publication (TP) 4803, 0951-LP-018-8010 - Auxiliary Boiler

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

Other References

ASME Boiler and Pressure Vessel Code VIII, 2023, Rules for Construction of Pressure Vessels

ASME Boiler and Pressure Vessel Code IX, 2023, Welding, Brazing and Fusing Qualifications.

National Board Inspection Code Part 2, 2023, Inspection

National Board Inspection Code Part 3, 2023, Personnel

3.  REQUIREMENTS

3.1 General.

3.1.1 CIR. 

None.

3.1.2 Tech Rep

3.1.2.1 Inspection Tech Rep. The Contractor must provide the services of a National Board of Boiler and Pressure Vessel Inspectors (NBBI) Commissioned Inspector or Pressure Equipment Inspect for Inservice boilers with an “R” endorsement to accomplish the following tasks – on site:

  • Inspect the boiler
  • Inspect repairs of the boiler

3.1.2.1.1 The Contractor must submit the name of the NBBI inspector and their current credential to in their solicitation proposal for this work.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences.  The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Interferences include but are not limited to.

  • Cables
  • Piping

Note

Coast Guard personnel will operate all shipboard equipment and machinery.

3.2 Operational test - initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

Note

For planning purposes, assume the boiler will take 4 hours from cold iron to operating pressure

3.3 Work Restrictions and Preparations. The Contractor must accomplish the following tasks to prepare for boiler work[A(1] . Accomplish these tasks in accordance with TP 4803, Section 5.

3.3.1 Drain the boiler (approximately 250 gallons) and dispose of residual water or other liquids in compliance with all applicable Federal, state, and local laws, ordinances, regulations and SFLC Standard Specification 0000. Notify the designated USCG representative (in writing) at least 48 hours prior to removal of wastes and fluids.  Document a complete chain of custody record of the removed contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the designated USCG representative upon completion of work.

3.3.2 The Contractor must remove the front and rear cover and handle work controls in accordance with Paragraph 3.3 of SFLC Std Spec 0000.

3.3.2.1 The USCG will provide fire watch personnel, and the Contractor is not required to provide a fire extinguisher. The Contractor must inform the designated USCG representative at least 24 hours prior to beginning hot work via CFR.

3.3.2.2 The Contractor must sufficiently clean the waterside interior of the boiler to gas-free the area and conduct the required repairs in this work item. Collect the wash water and properly dispose of it per guidance in paragraph 3.3.1.

3.4 Boiler Tube Plug.  The Contractor must perform the following work:

3.4.1 Determine which tubes are leaking and submit a CFR identifying them.

3.4.2 Plug up to six tubes[A(2]  in accordance with NBIC Part III. Conduct the welding and associated NDT in accordance with NBIC Part III, ASME Section VII and SFLC Standard Spec 0740 (precedence in that order). The welder must be qualified under ASME Section IX and the NBBI Tech Rep must inspect the repair. The Contractor must submit the name(s) of the qualified welder and their current credential via CFR.

3.5 Fireside cleaning. The Contractor must clean the rust out of the fire side shell, extension and covers down to bare metal with special attention paid to the crevice between the extension and the tube sheet. This must be accomplished on the front (the side with the burner apparatus) and the back of the boiler. The inspection Tech Rep must visually inspect the rusted areas for damage after cleaning.[A(3] 

3.5.1 Figures 1 shows some of the existing damage and an example of what areas need to be cleaned to bare metal.

3.5.2. Figure 2 shows the crevice that requires special attention.

3.6 Post-repair Hydrostatic Test. Upon completion of the re-tubing, the Contractor must conduct a pressure test on the boiler in accordance with NBIC Part II, Paragraph 4.3.1. Visually inspect the boiler for water leakage during the testing. Submit a CFR with results.

3.7 Boiler Restoration. The Contractor must perform the following work.

3.7.1 Reassemble the boiler in accordance with TP 4803 Section 5.

3.7.2 Renew endplate gaskets and any other disturbed seal during reassembly.

Note

The USCG will provide water to refill the boiler

3.8 Operational test - final. Upon completion of work, the Contractor must witness Coast Guard personnel perform a final operational test of all items or shipboard devices that were disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

3.9 Touch-up preservation.  The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable.  Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).

 [A(1]Made this change based on @Axelsson, Mikael J LT USCG SFLC (USA)'s suggestion

 [A(2]Agree with this # as the limit. Cyclotherm advised no more than 10% plugged.

 [A(3]I added this clarification

See attachments

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
X7MMPBHN4PD8
CAGE
78231
Vendor location
Tukwila, WA
Contract
70Z08525PLREP0396, purchase order
Obligated
$48,747.00
Actions
1 between September 19, 2025 and September 19, 2025
Competition
Competed Under SAP, 1 offer received
Set-aside reported
No Set Aside Used.
Described as
Boiler Tube Plug Cleaning
Match
solicitation number 70Z08525Q0030215 equals the FPDS solicitation identifier; same awarding office 70Z085 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 11, 2025

    Combined synopsis and solicitation

    Due September 18, 2025 at 11:00 AM EDT. SAM.gov, notice 22d50dab6cfb4412808665080915aa6f

    1 revision on SAM
    • September 11, 2025: publish, combined synopsis and solicitation

Points of contact