Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,690 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, total small business set-aside

USCGC Walnut Door and Scuttles

70Z08525Q0020638

US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.

Response deadline

August 4, 2025 at 11:00 AM EDT

Closed 479 days ago. Posted July 21, 2025. Scheduled to archive August 19, 2025.

Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities

This one closed in 2025

107 like it are open now in ship building and repairing

All 107 open in ship building and repairing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 14 days from the day the solicitation was posted, July 21, 2025, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

CGC Walnut doors and scuttles

RDD: 1/13/2026

Please see SOW in attachments

Consolidated List of References

The below-listed documents form a part of this specification to the extent specified herein.  Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge.  Other Government documents may be accessed – free of charge – from links located on the SFLC website.  Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 225 WLM 167-001, Rev W, 1997, Structural Closures

Coast Guard Drawing 225 WLM 631-002, Rev B, 2019, Paint Schedule

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment

Commercial Item Description (CID) A-A-59316, 2016, Abrasive Materials; for Blasting

Military Specification MIL-A-22262B, March 1996, Abrasive Blasting Media Ship Hull Blast Cleaning

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

The Society for Protective Coatings (SSPC) Surface Preparation Standard No. 11 (SSPC-SP 11), 2013, Power-Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC)/NACE International (NACE) 2007, Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, Near-White Metal Blast Cleaning

  1. ITEM 1: Fabrication of Watertight Door and Scuttle

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to fabricate watertight doors, hatches, and scuttles identified in Table 1 in accordance with drawings and references.

Table 1 - Watertight Doors and Scuttle locations

Description

Location

P/N and Description

QTY

Drawing

Weathertight Door (01-27-1)

01-26-0-C Buoy Deck Control Booth

PN: 20

Weathertight Steel Door 26”x66”, Right Hand, w/ hasp and staple

  01 Each

225 WLM 167-001

Raised Watertight Quick Acting Scuttle (01-20-2)

Escape Trunk

(1-19-2-T)

PN: 6

Scuttle – 21” Dia C.O. Raised, Quick-acting, Watertight

01 Each

225 WLM 167-001

1.2 Government-furnished property

None

2. REFERENCES

Coast Guard Drawings

Coast Guard Drawing 225 WLM 167-001, Rev W, 1997, Structural Closures

Coast Guard Drawing 225 WLM 631-002, Rev B, 2019, Paint Schedule

Coast Guard Publications

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

Other References

Commercial Item Description (CID) A-A-59316, 2016, Abrasive Materials; for Blasting

Military Specification MIL-A-22262B, March 1996, Abrasive Blasting Media Ship Hull Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) 2007, Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, Near-White Metal Blast Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Standard No. 11 (SSPC-SP 11), 2013, Power-Tool Cleaning to Bare Metal

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures.  Not Applicable

3.1.4 Interferences. Not Applicable

3.1.5 Fabrication. Contractor shall fabricate the door and scuttle listed in Table 1 and in accordance with the references listed in section 2 of this document.

3.1.6 Testing. All testing to be completed in accordance with drawings and Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes.

3.1.7 Shipping.  Contractor shall construct container to ship doors and hatches and must include pricing for shipping to CGC WALNUT, CO LTJG Daniel Zarillo, USCGC WALNUT (WLB 205), 211 South Ave Suite C, Pensacola, FL, 32508.

4. NOTES

None.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 21, 2025

    Combined synopsis and solicitation

    Due August 4, 2025 at 11:00 AM EDT. SAM.gov, notice 980a79ad2a2743b283cc0e806c95095e

    1 revision on SAM
    • July 21, 2025: publish, combined synopsis and solicitation

Points of contact