Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,681 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, total small business set-aside

USCGC Willow Oven replacement

70Z08525Q0020473

US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.

Response deadline

July 28, 2025 at 11:00 AM EDT

Closed 486 days ago. Posted July 23, 2025, first published July 9, 2025. Scheduled to archive August 12, 2025.

Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities

This one closed in 2025

107 like it are open now in ship building and repairing

All 107 open in ship building and repairing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 19 days from the day the solicitation was posted, July 9, 2025, to the deadline. The deadline moved once: it was first July 23, 2025 and ended as July 28, 2025.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

***Extended the Solicitation date to 07/28/2025 at 0800

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

CGC Willow Galley Range Replacement

POP 28July25-31-Jul2025

USCGC WILLOW (WLB-202)

1050 Register St

N. Charleston, SC 29405

Project Specification

For Replacement of Galley Ovens

Scope of Work

INTRODUCTION

Both ovens in the galley require replacement. Ovens have been procured by CGC WILLOW.    

SITE VISIT

Site visits are necessary before quotes involving services can be accepted and to ensure proper information and accurate scope of work.

SCOPE OF WORK

The Contractor shall be responsible for the following services, start-up and/or training:

Located in the Galley, contractor will remove old ovens and install new ovens PN: R36C-ATBM and R36C-ATDM.

  • Contractor will remove interferences and disconnect electrical wiring,  
  • Contractor will remove and dispose of old ovens.
  • Contractor will install and reconnect all connections including electrical, piping if need, panels and all other interferences that were removed.
  • Contractor will perform start up and test.
  • Contractor will haul away any trash that may result from the work and leave the space just as it was before they arrived.
  • Contractor will provide necessary information for access to FLETC.

GENERAL DISPOSITIONS

1.0 BASE ENTRY

Contractor will receive form from unit to fill out for every contractor to be able to access FLETC.

2.0 WORK SITE CONDITIONS

2.1 The Contractor shall take all necessary precautions to adequately protect all personnel, public and private property from harm within the areas of work. During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall provide barriers, temporary fencing, covers, fall protection, etc. wherever work could cause injury to workers, visitors, Coast Guard personnel, or dependents.

2.2 The Contractor shall keep the project site clean and free of clutter when work is not performed at the site. Remove rubbish and debris from the site on a daily basis, do not allow it to accumulate inside or outside of the work area.

2.3 Refuse, excess or waste materials resulting from work operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All refuse or recycling disposal shall be done in accordance with federal, state, and local laws and regulations.

3.0 MAINTENANCE SERVICES

3.1 If additional work is required over and above the herein specified, the Contractor shall notify the Engineering Officer for appropriate decision and action.

4.0 PROJECT COMPLETION/PERIOD OF PERFORMACE

4.1 All portion of existing work that has been damaged or altered in any way during performance of work shall be repaired or replaced in kind, in an approved manner, to match existing adjoining work. All work of this nature shall be performed by the Contractor at their expense and left in a condition similar to that which existed prior to the start of the work.

4.2 The Contractor shall have a maximum of thirty (30) calendar days after contract award to complete the project.

4.3 The Contractor shall work with unit to plan the replacement and ensure unit is able to close galley.

4.4 On site work shall last no more than fourteen (14) calendar days and is required to be scheduled a minimum of two (2) weeks in advance.

5.0 PRICING VALIDITY

5.1 Vendor quote must include the following statement:

"Vendor has reviewed the customer's SOW and certifies that the price covers the customer's requirement. No additional funds will be required."

6.0 Unit POC

 

9.1 CGC WILLOW EO, CWO Archibald Newland (843)-529-0158

9.2 CGC WILLOW Aux chief, MKC Andrew Clapp (843)-529-0158

9.3 CGC WILLOW Electrical chief, EMC Calvin Norris (843)-529-0158

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 9, 2025

    Combined synopsis and solicitation

    Due July 23, 2025 at 11:00 AM EDT. SAM.gov, notice 2a3a760ce50a4e07aecc78cafd6d38a2

    2 revisions on SAM
    • July 23, 2025: publish, combined synopsis and solicitation
    • July 9, 2025: publish, combined synopsis and solicitation
  2. July 23, 2025

    Combined synopsis and solicitation

    Due July 28, 2025 at 11:00 AM EDT. SAM.gov, notice 2b8af2a3ccf94ef0b54f5592d81e3955

    2 revisions on SAM
    • July 23, 2025: publish, combined synopsis and solicitation
    • July 9, 2025: publish, combined synopsis and solicitation

Points of contact