Combined synopsis and solicitation, total small business set-aside
USCGC Bristol Bay Bow Thruster Shaft Repair
70Z08525Q0020361
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
July 28, 2025 at 11:00 AM EDT
Closed 486 days ago. Posted July 14, 2025. Scheduled to archive August 12, 2025.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2025
107 like it are open now in ship building and repairing
- USNS CITY OF BISMARCK (T-EPF 9) VRA KR
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
SolicitationNAICS 336611Outside the USN6264927RK003Due tomorrowNov 27 - Ship Repair
Department of the Navy, NAVSUP FLC Sigonella Naples Office
SolicitationNAICS 336611Outside the USN6817127QN013Due tomorrowNov 27 - WATCH SUPV CHAIR
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 336611Ship to the buyerN0010427QBB55Due tomorrowNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 14 days from the day the solicitation was posted, July 14, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
USCGC Bristol Bay Bow Thruster Shaft repair
POP: 01 AUG- 15 OCT
Thruster Unit, Shaft replacement
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and perform shaft repalement on bow thruster units for the 120 class barges.
1.2 Government-furnished property.
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST
($/UNIT)
Y
**Propeller Shaft
NSN: 2010-01-659-2443
PN: 1013898
1 ea.
9,821.00
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 120-BARGE 568-1, Rev A, Bow Thruster Arrangement
Coast Guard Drawing 120-BARGE 802-2, Rev -, Outboard Profile & Main Deck Plan
Coast Guard Publications
Coast Guard Technical Publication (TP) 3385, Manufacturers Instruction Book-SWBS Group(s) 568-573
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
Other References
Overhaul Kit, Bow Thruster
NSN: 2010-01-659-2615
PN: SBJ-112
1 ea.
21,980.90
3. REQUIREMENTS
3.1 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
- Gear case disassembly
- Remove Propeller shaft
NOTE
Coast Guard personnel will remove the gearcase and shaft assembly from the thruster unit and deliver to contractor as well as new shaft and propeller.
The Contractor must perform the following maintenance requirements to the thruster units in accordance with Coast Guard Technical Publication (TP) 3385 and CG DWG 120-BARGE 568-1.
3.2. Disassembly and inspection. Disconnect and inspect the following bow thruster components for damage, wear, and reuse suitability and submit a CFR:
- Gear case
- Propeller shaft bearing
- Propeller shaft
3.3.2 Government’s right for change out. The Contractor must be aware that the Government reserves the right to furnish a new propeller shaft for installation in place of the existing propeller shaft. If the Government exercises this right, the Contractor must return the removed propeller shaft to the Coast Guard PE as an MTI item.
3.5 Assembly. The Contractor must replace Propeller shaft with replacement that will be provided, in procure or fabricate the associated hardware to attach the propeller to the shaft. Which includes but not limited to, propeller nut, nose cone, key stock mounting hardware.
Figure 1. Barge Thruster Overhaul Kit Components (page 1 of 3)
Figure 2. Barge Thruster Overhaul Kit Components (page 2 of 3)
Figure 1. Barge Thruster Overhaul Kit Components (page 3 of 3)
UNIT POC:
CWO Roberto Dilan
Engineering Officer
USCGC BRISTOL BAY (WTGB-102 and CGB-12001)
110 Mount Elliott Street
Detroit, MI 48207
W: (313) 568-9492
C: (631) 413-4375
Roberto.Dilan@uscg.mil
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Bristol Bay 25010-BPU SOW 2025.pdf476 KB, July 14, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 14, 2025
Combined synopsis and solicitation
Due July 28, 2025 at 11:00 AM EDT. SAM.gov, notice 452d6cf1cf4943b58e565489164d4506
1 revision on SAM
- July 14, 2025: publish, combined synopsis and solicitation
Points of contact
- Justin Wooldridgejustin.r.wooldridge2@uscg.mil2068205327
- Lindsay Mongiovilindsay.n.mongiovi@uscg.mil5716086752