Special notice, total small business set-aside
USCGC Maple ASW Pump Controllers
70Z08525Q0020291
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
July 29, 2025 at 11:00 AM EDT
Closed 485 days ago. Posted July 22, 2025. Scheduled to archive August 13, 2025.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2025
107 like it are open now in ship building and repairing
- USNS CITY OF BISMARCK (T-EPF 9) VRA KR
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
SolicitationNAICS 336611Outside the USN6264927RK003Due tomorrowNov 27 - Ship Repair
Department of the Navy, NAVSUP FLC Sigonella Naples Office
SolicitationNAICS 336611Outside the USN6817127QN013Due tomorrowNov 27 - WATCH SUPV CHAIR
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 336611Ship to the buyerN0010427QBB55Due tomorrowNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This post is for informational purposes only and has been awarded sole source.
Please see attach SOW and NOI letter.
SCOPE OF WORK
U. S. COAST GUARD CUTTER MAPLE
JO-KELL Custom NEM12 30HP 460V SIZE 3 Controllers (New item ESG539406-1)
SECTION 1 – GENERAL INFORMATION
1.1 Scope of Work
Provide two ESG539406-1 JO-KELL CUSTOM NEMA12 30HP 460V Size 3 Controllers, 120V/60, 100/50 Coil Disc Switch NF. Full voltage non-reversing combination starter, high voltage thermal resistor, overload relay with control power transformer terminal blocks and wired. (FVNR COMBO STARTER HTR OLR W/ CPT TERM BLKS & WIRED). Configured per existing Drawing Y-156515, T. Garland.
1.2 Contact for questions:
1.1.5.1 Any questions regarding scope of work must be directed to the Contracting Officer. Technical questions can be directed to Mr. Bryan Wright at bryan.g.wright@uscg.mil (757) 628-4009.
1.3 Required Delivery Date and Address
Required supplies shall be delivered to the below address within 8-10 weeks of notice of award and tracking info must be supplied within 48 hours of each individual supply being shipped.
USCGC MAPLE
ATTN: CWO Hutchinson
2301 E Fort Macon
Atlantic Beach, NC 28512
Ph: (252) 240-8360
1.4 Award
It is the governments’ intent to make award on the basis of Lowest Price Technically Acceptable (LPTA) offered through issuance of a firm fixed price contract.
1.4.1. Under FAR 4.1103 prospective contractor shall be registered in System Award Management (SAM) prior to award. Failure for contractor to be registered in (SAM) shall result in Contracting Officer to proceed with next successful registered offeror. Website: www.sam.gov
1.5 Invoicing
Invoices shall be submitted via IPP.gov with an attached copy of the invoice included by the vendor that clearly includes the Purchase Order.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- NOTICE OF INTENT TO SOLE SOURCE memo CGC Maple 52000PR250020291.pdf112 KB, July 22, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 22, 2025
Special notice
Due July 29, 2025 at 11:00 AM EDT. SAM.gov, notice 6a32f05e7ce94333a1daee46309b8a1b
1 revision on SAM
- July 22, 2025: publish, special notice
Points of contact
- Justin Wooldridgejustin.r.wooldridge2@uscg.mil2068205327
- Lindsay Mongiovilindsay.n.mongiovi@uscg.mil5716086752