Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,704 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, total small business set-aside

USCGC Polar Star Boiler Inspection

70Z08525Q0020189

US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.

Response deadline

July 17, 2025 at 11:00 AM EDT

Closed 497 days ago. Posted July 14, 2025, first published July 10, 2025. Scheduled to archive August 1, 2025.

Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities

This one closed in 2025

107 like it are open now in ship building and repairing

All 107 open in ship building and repairing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 7 days from the day the solicitation was posted, July 10, 2025, to the deadline. The deadline moved once: it was first July 14, 2025 and ended as July 17, 2025.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

SOLICITATION EXTENDED UNTIL 17JULY 0800. 

UPDATED POP 21JUL-04AUG

USCGC Polar Star Boiler inspection. 

POP: 21July-04Aug

Please see Attached SOW for images

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors for Coast Guard vessels.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirement of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740. 

3.3 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550 

3.4 Materials. The Contractor must obtain all the materials required to complete this job except for the Government-furnished Property shown in Paragraph 1.2 of Work Item 1, if any specified.

3.5 Period of Performance. The period of performance for this requirement starts on 16 July 2025 and ends on 1 August 2025.

3.6 Location. The Contractor must perform this work while the USCGC POLAR STAR is in drydock at Mare Island Drydock (MIDD) - 1180 Nimitz Ave, Vallejo, CA, 94592. Contractor must provide Certificate of Insurance and full name of contractors, subcontractors, and technical representatives to the designated USCG representative at least 24 hours prior to arriving on-site. Contractor does not require access to designated restricted and/or controlled access spaces on the ship in execution of this work.

3.7 Release of References. For any listed references to be distributed, the contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide your JCP number and expiration date to the listed point of contact (POC) for this work. 

3.8 Solicitation Period Site-Visit. The Contractor can perform a ship check during the solicitation period of this requirement. The Contractor must contact the designated points of contact (POC) at least 48 hours prior to requested access for USCG to process. The POC for a site visit is listed in Paragraph 3.10. Access prior to award cannot be guaranteed and depends on the availability of the POCs and the Contractor providing request documentation needed for access. USCG is not responsible for any costs associated with the Contractor’s site visit. 

3.9 Documentation for Contractor’s Proposal. The Contractor must include at least the following in their proposal for this requirement: basic information (name, company name, contact details, the date, Unique Entity ID), company overview, past performance (if applicable), technical representative certifications and qualifications, and signature of the authorized person. 

3.10 Points of Contact. The USCG Technical POCs for this requirement include but are not limited to the following: 

3.10.1 SFLC-LREPL Asset Manager, LT Mike Axelsson, Mikael.J.Axelsson@uscg.mil 

3.10.2 SFLC-LREPL Engineer Officer, LT Joshua Herring, Joshua.C.Herring@uscg.mil

  1. ITEM 1: #2 Boiler, Open and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to investigate a leak in the #2 boiler fire side casing, inspect the rest of the casing for leaks, ensure the pressure-containing components are intact, and provide repair suggestions. See Figure 1 for nameplate information of the boiler.

1.2 Government-furnished property. 

None.

2. REFERENCES

Coast Guard Drawings

Coast Guard Drawing 400 WAGB 103-003, Rev AM, Booklet of General Plans (POLAR STAR) 

Coast Guard Drawing 400 WAGB 5101-7, Rev 1, SDW 350M Marine Auxiliary Boiler Bare Boiler Design Arrangement 

Coast Guard Publications

Coast Guard Technical Publication (TP) 2035, SWBS 517, Section A, Rev -, Auxiliary Boiler 

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures 

Other References

Code of Federal Regulations (CFR) Title 46, Part 61.05, 2025, Tests and Inspections of Boilers 

National Board of Boiler and Pressure Vessel Inspectors (NBBI), NBIC, 2023, National Board Inspection Code

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep. The Contractor must provide the following Technical Representatives.

3.1.2.1 Inspection Tech Rep. The Contractor must provide the services of a National Board of Boiler and Pressure Vessel Inspectors (NBBI) Commissioned Inspector or Pressure Equipment Inspect for Inservice boilers with an “R” endorsement to accomplish the following tasks – on site:

  • Inspect the boiler
  • Inspect any repairs of the boiler

3.1.2.1.1 The Contractor must submit the name of the NBBI inspector and their current credential in their solicitation proposal for this work.

3.1.2.2 Refractory Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with boiler refractory and firebox construction to accomplish the following on site:

  • Inspect refractory and other firebox components
  • Recommend repairs

3.1.2.2.1 Ensure the Tech Rep has experience with the equipment stated above and demonstrated on their résumé.

3.1.2.2 Submit the name and résumé of the Tech Rep to the designated USCG representative in the solicitation proposal for this work.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences) including, but not limited to the following:

  • Insulation
  • Sheathing

3.1.5. Residual Fluids. The Contractor must dispose of residual fluids in compliance with all applicable Federal, state, and local laws, ordinances, regulations and SFLC Standard Specification 0000. Notify the designated USCG representative (in writing) at least 5 days prior to removal of wastes and fluids.  Document a complete chain of custody record of the removed contents and generated wastes, from the vessel to the point of destination or delivery. Submit document to the designated USCG representative upon completion of work.

note

Coast Guard personnel will operate all shipboard machinery and equipment

3.2 Boiler Pressure Testing

3.2.1 Test Plan. The Contractor must include a test plan that complies with the requirements of NBIC Part 2, Paragraph 4.3.1 in the proposal. Submit a CFR documenting any post-award changes to the hydrostatic test plan to the designated USCG representative for approval at least 2 business days prior to the proposed test date. The plan must address the following topics and be signed by all tech reps:

  • Test pressure (Design Working Pressure is 150 PSI)
  • Source and treatment of testing water
  • Location and installation status of all blanks or valves that will hold pressure
  • Air Removal
  • Make, model and arrangement of pressurizing pump 
  • Date, time, and duration of hydrostatic test
  • Data to be monitored and recorded during the testing

3.2.2 Execute the pressure test per plan in the presence of a Coast Guard Inspector. Submit a CFR documenting the results of the pressure testing and the associated data called out in the test plan.

3.2.3 The Inspection Tech Rep must be present for the hydro test.

3.2.4 Pressure test must not exceed the test design working pressure.

3.3 Fireside cleaning. The Contractor must disassemble the boiler sufficiently to allow complete access to the fireside for cleaning. The Contractor must mechanically clean the firesides of the boiler. Mechanically clean the surfaces of the tubes and the combustion chamber with a wire brush or other approved alternatives. Remove all debris. Vacuum and dispose of all soot in accordance with General Requirements. Figures 1 and 2 show the known damaged area

3.3.1 Prior to commencing mechanical cleaning, install containments to collect soot and airborne debris and conduct an initial inspection with a Coast Guard inspector to document existing condition. 

3.3.2 Wire brush and clean the seating surfaces of all hand hole and manhole plates. 

3.4 Inspection. Upon completion of cleaning and in the presence of a Coast Guard Inspector, the Contractor must visually inspect the fireside of the boiler with emphasis on the following items:

  • Indications of broken refractory
  • Soot deposits
  • Pitting, cracking or corrosion on the water pipes.

3.4.1 The Contractor must reassemble the boiler to the as-found condition at the beginning of the contract accordance with all references in Section 2 of this work item.

3.4.1 Mud drum and steam drum gaskets must be renewed.

3.4.2 Disturbed insulation and sheathing must be renewed.

3.4.3 Submit a CFR detailing the damage and other issues found during the inspection, recommend corrective actions, and potential causes for these problems.

3.5 Touch-up preservation, general. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs).

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 10, 2025

    Combined synopsis and solicitation

    Due July 14, 2025 at 11:00 AM EDT. SAM.gov, notice 94d0d1e8056c46bb9ec4ca9f3af9caa7

    2 revisions on SAM
    • July 14, 2025: publish, combined synopsis and solicitation
    • July 10, 2025: publish, combined synopsis and solicitation
  2. July 14, 2025

    Combined synopsis and solicitation

    Due July 17, 2025 at 11:00 AM EDT. SAM.gov, notice 1e6956c75808411d816b946cfd0e48e6

    2 revisions on SAM
    • July 14, 2025: publish, combined synopsis and solicitation
    • July 10, 2025: publish, combined synopsis and solicitation

Points of contact