{"canonical":"https://sealedbidder.com/opportunities/70z08525q0002514","key":"70Z08525Q0002514","url":"https://sealedbidder.com/opportunities/70z08525q0002514","title":"USCGC Waesche Dual Point Davit Modify","solicitation_number":"70Z08525Q0002514","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-03-06T16:00:00Z","first_posted":"2025-02-07","last_posted":"2025-02-27","department":"HOMELAND SECURITY, DEPARTMENT OF","subagency":"US COAST GUARD","office":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"336611","psc":"J020","set_aside":"SBA","place_state":"CA","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"06001","place_county_name":"Alameda County","place_city":"0600562","place_city_name":"Alameda","winner":null,"award_amount":null,"publications":[{"notice_id":"fa34bc024c784501b696706ba7daff1f","title":"USCGC WAESCHE DUAL POINT DAVIT MODIFY NOTICE OF INTENT TO AWARD","solicitation_number":"70Z08525Q0002514","notice_type":"s","base_type":"s","posted":"2025-02-07","posted_at":"2025-02-07T22:45:23.225Z","due_at":"2025-02-24T16:00:00Z","due_date":"2025-02-24","cancelled":false,"archived":true,"archive_date":"2025-03-11","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/fa34bc024c784501b696706ba7daff1f/view","enriched":true,"history":[{"index":2,"title":"USCGC WAESCHE DUAL POINT DAVIT MODIFY NOTICE OF INTENT TO AWARD","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2025-02-10T16:17:25.944Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"b8f3185b14a14332979b4190f400276c","solicitation_number":"70Z08525Q0002514","parent_opportunity_id":"fa34bc024c784501b696706ba7daff1f"},{"index":1,"title":"USCGC WAESCHE DUAL POINT DAVIT MODIFY NOTICE OF INTENT TO AWARD","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T22:45:23.225Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"fa34bc024c784501b696706ba7daff1f","solicitation_number":"70Z08525Q0002514"}]},{"notice_id":"af6c6ef1ef55453eb175711d32805e11","title":"USCGC Waesche Dual Point Davit Modify","solicitation_number":"70Z08525Q0002514","notice_type":"k","base_type":"k","posted":"2025-02-27","posted_at":"2025-02-27T22:09:27.327Z","due_at":"2025-03-06T16:00:00Z","due_date":"2025-03-06","cancelled":false,"archived":true,"archive_date":"2025-03-21","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/af6c6ef1ef55453eb175711d32805e11/view","enriched":true,"history":[{"index":3,"title":"USCGC Waesche Dual Point Davit Modify","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-27T22:09:27.327Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"af6c6ef1ef55453eb175711d32805e11","solicitation_number":"70Z08525Q0002514"}]}],"latest_notice_id":"af6c6ef1ef55453eb175711d32805e11","first_type":"s","notices":[{"dates":{"posted":"2025-02-07","posted_at":"2025-02-07T22:45:23.225Z","created_at":"2025-02-07T22:25:17.095Z","modified_at":"2025-02-10T16:17:25.944Z","response_deadline":{"raw":"2025-02-24T08:00:00-08:00","utc":"2025-02-24T16:00:00Z","date":"2025-02-24","time":"08:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/fa34bc024c784501b696706ba7daff1f/view"},"naics":{"codes":["336611"],"primary":"336611"},"title":"USCGC WAESCHE DUAL POINT DAVIT MODIFY NOTICE OF INTENT TO AWARD","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_id":"100187922","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-03-11","archive_type":"auto15"},"history":[{"index":2,"title":"USCGC WAESCHE DUAL POINT DAVIT MODIFY NOTICE OF INTENT TO AWARD","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2025-02-10T16:17:25.944Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"b8f3185b14a14332979b4190f400276c","solicitation_number":"70Z08525Q0002514","parent_opportunity_id":"fa34bc024c784501b696706ba7daff1f"},{"index":1,"title":"USCGC WAESCHE DUAL POINT DAVIT MODIFY NOTICE OF INTENT TO AWARD","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T22:45:23.225Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"fa34bc024c784501b696706ba7daff1f","solicitation_number":"70Z08525Q0002514"}],"contacts":[{"name":"KYLER FISK","role":"primary","email":"KYLER.C.FISK@USCG.MIL","phone":"9492881271"},{"name":"ULISES BALMACEDA","role":"secondary","email":"Ulises.O.Balmaceda@uscg.mil","phone":"5104375438"}],"base_type":{"code":"s","label":"Special Notice"},"notice_id":"fa34bc024c784501b696706ba7daff1f","lineage_id":"fa34bc024c784501b696706ba7daff1f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-23T02:42:34.974857868Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f4fb435952807ae6fa04e4e32ab5c3a684b40fe8036e751e5baf452929a78538","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-23T02:42:34.974857868Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong>General Requirements</strong> &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>1. SCOPE</strong>  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.  &nbsp;</p>\n\n<p> &nbsp;<br />\n<strong>2. REFERENCES</strong>  &nbsp;</p>\n\n<p> &nbsp;<br />\n<strong>COAST GUARD DRAWINGS</strong>  &nbsp;</p>\n\n<p> &nbsp;<br />\nNone.  &nbsp;</p>\n\n<p> &nbsp;<br />\n<strong>COAST GUARD PUBLICATIONS</strong>  &nbsp;</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p><strong>OTHER REFERENCES</strong>  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>None.&nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p><strong>3. REQUIREMENTS</strong>  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p></p>\n\n<p>3.2 <u>Period of Performance</u>. The period of performance for this work is 10MAR2025-28MAY2025, to include sea trials on 01JUL2025.</p>\n\n<p> &nbsp;</p>\n\n<p>3.3 <u>Location</u>. The Contractor must perform the work while the USCGC WAESCHE is alongside the pier at U.S. Coast Guard Base Alameda, Coast Guard Island, Alameda CA 94501.   &nbsp;</p>\n\n<p></p>\n\n<p></p>\n\n<p><em>TCTO 58300_TAB_0824_418</em></p>\n\n<p><strong>Dual Point Davit, Modify</strong></p>\n\n<p><strong>1.&nbsp; SCOPE</strong></p>\n\n<p>1.1 Intent.&nbsp; This work item describes the requirements for the Contractor to modify the Allied System Dual Point Davit (DPD) with Split/Individual Constant Tension (CT) capability, Solid State Driver for ease of system adjustments and to install machinery space camera system</p>\n\n<p><strong>TABLE 1 &ndash; DUAL POINT DAVIT NAMEPLATE DATA</strong></p>\n\n<p><strong>description</strong></p>\n\n<p><strong>LOCATION</strong></p>\n\n<p><strong>davit total gross weight</strong></p>\n\n<p>Allied Systems Dual Point Davit with Control Console</p>\n\n<p>Models : DDP11000CTS &amp; SP2200 (S/N - 2313 &amp; 2315)</p>\n\n<p>Weather Deck, STBD Side, Frame 47</p>\n\n<p>29,000 lbs.</p>\n\n<p>1.2 <u>Government</u><u>-furnished property</u>.</p>\n\n<p><strong>MTI</strong></p>\n\n<p><strong>ITEM DESCRIPTION</strong></p>\n\n<p><strong>NSN/PN</strong></p>\n\n<p><strong>QTY</strong></p>\n\n<p><strong>ESTIMATED COST ($/UNIT)</strong></p>\n\n<p>Y</p>\n\n<p>CB-OTH Mark IV</p>\n\n<p>(Coast Guard Drawing 26B-CB-IV-801-001)</p>\n\n<p></p>\n\n<p>1 ea.</p>\n\n<p>300,000</p>\n\n<p>N</p>\n\n<p>Kit-DDP11000CT</p>\n\n<p>ACN 2030-01-F24-6826/PN 93030</p>\n\n<p>1</p>\n\n<p>5,000</p>\n\n<p><strong>2.&nbsp; REFERENCES</strong></p>\n\n<p><strong>Coast Guard Drawings</strong></p>\n\n<p>Coast Guard Drawing 418A-WMSL-100-001 Rev B, General Arrangements</p>\n\n<p><strong>Coast Guard Publications</strong></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements</p>\n\n<p>Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures</p>\n\n<p>Coast Guard Technical Publication (TP) 9618, SWBS 583, 01 Sept 2023 BOAT DAVIT - MODELS DDP11000CTS &amp; SP2200 (S/N: 2328-753, 2329-751, 2332-750)</p>\n\n<p><strong>Other References</strong></p>\n\n<p>International Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011.</p>\n\n<p>International Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition.</p>\n\n<p>Allied Systems Company ASC DWG# 94861, Chart, Splicing Connector</p>\n\n<p>Allied Systems Company ASC DWG# 94081, Kit, Individual CT Control System</p>\n\n<p>Allied Systems Company ASC DWG# 93034, Hydraulic Schematic</p>\n\n<p>Allied Systems Company ASC DWG# 93031, Individual CT HYD Conversion</p>\n\n<p></p>\n\n<p><strong>3.&nbsp; REQUIREMENTS</strong></p>\n\n<p>3.1 <u>General.</u></p>\n\n<p>3.1.1 <u>CIR</u>.&nbsp; The Contractor must submit a CIR for the inspections listed in the following paragraph(s):</p>\n\n<p>None</p>\n\n<p>3.1.2 <u>Tech Rep.</u></p>\n\n<p>3.1.2.1 The Contractor must provide the services of a qualified&nbsp;services of an OEM authorized/ licensed<u> </u>Tech Rep who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CT) to do the following, on site:&nbsp;</p>\n\n<ul>\n\t<li>Provide manufacturer&#39;s proprietary information, software, and tools pertinent to the equipment/system.</li>\n\t<li>Assist with proper repair methods and ensure compliance with manufacturer&#39;s procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.</li>\n\t<li>Tech Rep must be present in all aspects of this work item.</li>\n\t<li>Ride the ship during sea trials (8 hours)</li>\n</ul>\n\n<p>3.1.2.2 Ensure the Tech Rep has a r&eacute;sum&eacute; of demonstrated experience with the system/equipment stated above.</p>\n\n<p>3.1.2.3 Submit a copy of the Tech Rep&rsquo;s r&eacute;sum&eacute; and a list of references to the COR with the bid proposal.</p>\n\n<p>3.1.2.4 Point of contact:</p>\n\n<ul>\n\t<li>Heath Munger or Gary Berglund</li>\n\t<li>Heath.munger@alliedsystems.com, Gary.Berglund@AlliedSystems.com</li>\n\t<li>Allied Systems Company</li>\n\t<li>(503) 825-3366</li>\n</ul>\n\n<p></p>\n\n<p>3.1.3 <u>Protective</u><u> measures</u>.&nbsp; The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).</p>\n\n<p>3.1.3.1 <u>Protective</u><u> measures - hydraulic system</u><u>.</u> The Contractor must maintain existing hydraulic system cleanliness; take all necessary precautions to prevent the introduction of contaminants into the hydraulic system. Whenever disconnecting or removing components from the hydraulic system, completely seal all openings to the rest of the system, immediately, using either caps (for externally threaded connection points), bolt-on blanks, or taped-on discs/covers (sheet-metal no less than 1/16-inch thick).</p>\n\n<p>3.1.4 <u>Interferences</u>.&nbsp; The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).&nbsp; Known interferences include, but are not limited to the below listed:</p>\n\n<ul>\n\t<li>Piping</li>\n\t<li>Electrical Cables</li>\n</ul>\n\n<p>3.1.5 <u>Reference</u><u> documents</u><u>.</u>&nbsp;&nbsp; The Contractor must refer to the drawings and Tech Pubs referenced in Section 2 for guidance in accomplishing this work item. &nbsp;&nbsp;&nbsp;</p>\n\n<p><strong>NOTE</strong></p>\n\n<p><strong>Coast Guard personnel will operate all shipboard machinery and equipment.</strong></p>\n\n<p>3.2 <u>Operational test, initial</u>. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.</p>\n\n<p>3.3 <u>Split/Individual Constant Tension (CT)</u>. The Contractor must follow Tech Rep direction and requirements listed in referenced documents to modify the Allied System Dual Point Davit (DPD) for Split/Individual Constant Tension (CT) capability.</p>\n\n<p>3.4 <u>Install Camera kit</u>. The Contractor must follow Tech Rep direction and requirements listed in referenced documents, to install camera system to enable operators to view machinery space without the need to remove side panels.</p>\n\n<p>3.5 <u>Winch tensioner</u>. The Contractor must renew the Aft winch tensioner and drum.</p>\n\n<p>3.6 <u>Sea trial</u>.&nbsp; The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP.&nbsp; Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR.</p>\n\n<p>3.7 <u>Touch</u><u>-up preservation</u>.&nbsp; The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310.&nbsp; Abide by all touch-up requirements outlined in SFLC Std Spec 6310.</p>\n\n<p><strong>4.&nbsp; NOTES</strong></p>\n\n<p>This section is not applicable to this work item.</p>\n\n<p></p>\n\n<p></p>\n\n<p><em>&nbsp;58300_RTK_1223_418</em></p>\n\n<p><strong>Dual Point Davit, Biennial Maintenance, Perform</strong></p>\n\n<p><strong>1.&nbsp; SCOPE</strong></p>\n\n<p>1.1 <u>Intent</u>.&nbsp; This work item describes the requirements for the Contractor to perform Biennial Maintenance on Dual Point Davit listed in Table 1.</p>\n\n<p><strong>TABLE 1 &ndash; DUAL POINT DAVIT NAMEPLATE DATA</strong></p>\n\n<p><strong>description</strong></p>\n\n<p><strong>LOCATION</strong></p>\n\n<p><strong>davit total gross weight</strong></p>\n\n<p>Allied Systems Dual Point Davit with Control Console</p>\n\n<p>Models: DDP11000CTS &amp; SP2200</p>\n\n<p>Weather Deck, STBD Side, Frame 47</p>\n\n<p>29,000 lbs.</p>\n\n<p>1.2 <u>Government-furnished property</u>.</p>\n\n<p><strong>MTI</strong></p>\n\n<p><strong>ITEM DESCRIPTION</strong></p>\n\n<p><strong>NSN/PN</strong></p>\n\n<p><strong>QTY</strong></p>\n\n<p><strong>ESTIMATED COST ($/UNIT)</strong></p>\n\n<p>Y</p>\n\n<p>CB-OTH Mark IV</p>\n\n<p>(Coast Guard Drawing 26B-CB-IV-801-001)</p>\n\n<p>N/A</p>\n\n<p>1 ea.</p>\n\n<p>N/A</p>\n\n<p>Y</p>\n\n<p>HOOK, RELEASE, BOAT DAVIT</p>\n\n<p>Model APR-356-CBH, NSN 4030-01-467-1005</p>\n\n<p>2 ea.</p>\n\n<p>5000.00</p>\n\n<p><strong>2.&nbsp; REFERENCES</strong></p>\n\n<p><strong>Coast Guard Drawings</strong></p>\n\n<p>Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements</p>\n\n<p>Coast Guard Drawing 418A-WMSL-801-001 Rev A, Booklet of General Plan</p>\n\n<p><strong>Coast Guard Publications</strong></p>\n\n<p>Coast Guard Technical Publication (TP) 9618, SWBS 583, Sept 2023, Boat Davit - Models DDP11000CTS &amp; SP2200 (S/N: 2328-753, 2329-751, 2332-750)</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000),2022, General Requirements</p>\n\n<p>Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems</p>\n\n<p>Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures</p>\n\n<p><strong>Other References</strong></p>\n\n<p>International Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011</p>\n\n<p>International Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition</p>\n\n<p>ANSI/EASA Standard AR100-2020,&nbsp; Recommended Practice for the Repair of Rotating Electrical Apparatus</p>\n\n<p><strong>3.&nbsp; REQUIREMENTS</strong></p>\n\n<p>3.1 <u>General</u>.</p>\n\n<p>3.1.1 <u>CIR</u>.&nbsp; The Contractor must submit a CIR for the inspections listed in the following paragraph(s):</p>\n\n<ul>\n\t<li>3.2 <u>Biannual maintenance inspection and repair task particulars</u> (Task #1 and #2)</li>\n\t<li>3.2.1 <u>Hook certification</u>.&nbsp;</li>\n</ul>\n\n<p>3.1.2 <u>Tech Rep</u>. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CTS) to accomplish the following on site:</p>\n\n<ul>\n\t<li>Advise on manufacturer&#39;s proprietary system information.</li>\n\t<li>Ensure compliance with manufacturer&#39;s procedures and standards during system disassembly, inspection, repair, reassembly, and testing as applicable.</li>\n</ul>\n\n<p>3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their r&eacute;sum&eacute;.</p>\n\n<p>3.1.2.2 Submit a copy of the Tech Rep&rsquo;s r&eacute;sum&eacute; and a list of references to the COR with the bid proposal.</p>\n\n<p>3.1.2.3 Point of contact:</p>\n\n<ul>\n\t<li>Heath Munger or Gary Berglund</li>\n\t<li>Heath.munger@alliedsystems.com, Gary.Berglund@AlliedSystems.com</li>\n\t<li>Allied Systems Company</li>\n\t<li>(503) 825-3366</li>\n</ul>\n\n<p>3.1.3 <u>Protective measures</u>.&nbsp; The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).</p>\n\n<p>3.1.3.1 Protection of fine surfaces. The Contractor must protect all fine surfaces in accordance with SFLC Std. Spec 5000.</p>\n\n<p>3.1.3.2 Hydraulic system contamination protection. The Contractor must maintain existing hydraulic cleanliness in accordance with SFLC Std. Spec 5000.</p>\n\n<p>3.1.4 <u>Interferences</u>.&nbsp; The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).&nbsp; Known interferences include, but are not limited to the following:</p>\n\n<ul>\n\t<li>Piping</li>\n\t<li>Electrical Cables</li>\n\t<li>Capstan</li>\n\t<li>Inspection Covers</li>\n</ul>\n\n<p><strong>NOTE</strong></p>\n\n<p><strong>Coast Guard personnel will operate all shipboard machinery and equipment.</strong></p>\n\n<p>3.1.5 <u>Operational test, initial</u>. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.</p>\n\n<p>3.1.6 <u>Materials</u>.&nbsp; The Contractor must furnish and install parts listed in Table 2.</p>\n\n<p><strong>TABLE 2 &ndash; LIST OF PARTS</strong></p>\n\n<p><strong>QUANTITY</strong></p>\n\n<p><strong>PART NUMBER</strong></p>\n\n<p><strong>DESCRIPTION</strong></p>\n\n<p><strong>SOURCE OF SUPPLY</strong></p>\n\n<p>1</p>\n\n<p>593533</p>\n\n<p>Kit, Element Replacement</p>\n\n<p>Allied System Co.</p>\n\n<p>214 S.W. Oregon Street, Sherwood OR 97140</p>\n\n<p>1</p>\n\n<p>593532</p>\n\n<p>Kit, Element Replacement</p>\n\n<p>2</p>\n\n<p>70196</p>\n\n<p>Return Filters</p>\n\n<p>2</p>\n\n<p>74130</p>\n\n<p>Seal Kits</p>\n\n<p>2</p>\n\n<p>71975</p>\n\n<p>Filter Breather</p>\n\n<p>1</p>\n\n<p>71754</p>\n\n<p>Tank Cover Gasket</p>\n\n<p>2</p>\n\n<p>71042</p>\n\n<p>Wire Rope</p>\n\n<p>2</p>\n\n<p>73441</p>\n\n<p>Hub</p>\n\n<p>3.2 <u>Biannual maintenance inspection and repair task particulars.</u>&nbsp; The Contractor with Tech Rep support must perform the tasks designated in Table 3 below and Figure 1 in accordance with SFLC Std Spec 5000 and CG Tech Pub as applicable.</p>\n\n<p><strong>TABLE 3 &ndash; Recurring Maintenance task</strong></p>\n\n<p></p>\n\n<p><strong>ADDITION REQUIREMENTS</strong></p>\n\n<p><strong>#</strong></p>\n\n<p><strong>TASK TYPE</strong></p>\n\n<p><strong>QTY</strong></p>\n\n<p><strong>COMPONENT OR ASSEMBLY</strong></p>\n\n<p><strong>APPENDIX AND PARA. FROM SFLC STD 5000</strong></p>\n\n<p><strong>OTHER</strong></p>\n\n<p>1</p>\n\n<p>Operate and Inspect</p>\n\n<p>1</p>\n\n<p>Dual Point Davit System</p>\n\n<p>3.2.1 (Operate and Inspect) Appendix A (General Inspection Requirements)</p>\n\n<p>Submit CIR.</p>\n\n<p>2</p>\n\n<p>Hydraulic Lube Oil Analysis</p>\n\n<p>1</p>\n\n<p>Hydraulic System</p>\n\n<p>C2.1.3.1</p>\n\n<p>Submit a CIR.</p>\n\n<p>3</p>\n\n<p>Service and Inspect</p>\n\n<p>1</p>\n\n<p>Hydraulic Winch Assembly (Constant Tension and Normal) which are powered by Main Hydraulic Pump/Motor Assembly (ST1) and Back Up powered by Emergency (ST2), Accumulators.</p>\n\n<p>3.2.2 (Service and Inspect) D2.3 (Brakes and clutches.&nbsp; D2.4 (Open gearing and gear reducers)</p>\n\n<p>See Paragraph 3.3.1</p>\n\n<p></p>\n\n<p>Submit CFR.</p>\n\n<p>4</p>\n\n<p>Disassemble and Inspect</p>\n\n<p>2</p>\n\n<p>Power Sheave Assembly</p>\n\n<p>3.2.3 (Disassemble and Inspect)</p>\n\n<p>Renew the hubs</p>\n\n<p>If hubs are not available, clean, inspect, and reinstall hubs.</p>\n\n<p>5</p>\n\n<p>Renew</p>\n\n<p>2</p>\n\n<p>Wire Rope Assembly</p>\n\n<p>(Allied System Part No. 71042)</p>\n\n<p>D2.2 (Wire rope assemblies)</p>\n\n<p><u>Wire rope particulars</u>: Nominal diameter: 5/8 inch</p>\n\n<p></p>\n\n<p>Minimum Breaking Strength: 56,040 lbs.</p>\n\n<p></p>\n\n<p>Total length of each wire rope required: 110 ft.</p>\n\n<p>End fitting type: Fiege. Submit a CFR.</p>\n\n<p>6</p>\n\n<p>Service and Inspect&nbsp;</p>\n\n<p>1&nbsp;</p>\n\n<p>Control Panel&nbsp;</p>\n\n<p>3.2.2 (Service and Inspect)&nbsp;</p>\n\n<p>Verify all mechanical and electrical signals to the control panel. Submit a CFR.&nbsp;</p>\n\n<p>7</p>\n\n<p>NDE</p>\n\n<p>1</p>\n\n<p>Dual Point Davit System</p>\n\n<p>3.2.5 (NDE)</p>\n\n<p>Areas to NDE: all weld joints and boom and turret structures.</p>\n\n<p>Submit a CFR.</p>\n\n<p>8</p>\n\n<p>Groom and Lubricate</p>\n\n<p>1</p>\n\n<p>Dual Point Davit System</p>\n\n<p>3.2.6 (Groom and Lubricate)</p>\n\n<p></p>\n\n<p>9</p>\n\n<p>Weight Test</p>\n\n<p>1</p>\n\n<p>Dual Point Davit System</p>\n\n<p>B2.7.2 (Dual Point Davits)</p>\n\n<p>B2.7.2.1 No-load Operational Test</p>\n\n<p>B2.7.2.2 Static Load Test</p>\n\n<p>B2.7.2.3 Winch/Brake/Modified static load Test</p>\n\n<p>B2.7.2.4 Dynamic Load Test</p>\n\n<p>B2.7.2.5 Rated Load test</p>\n\n<p></p>\n\n<p>Test weight particulars:</p>\n\n<p>Working Load Limit (11,000 lb.).</p>\n\n<p></p>\n\n<p>&quot;Modified static / brake&quot; test load: 16,500 pounds (150% of WLL)</p>\n\n<p></p>\n\n<p>&ldquo;Modified Dynamic Test Load: 12,650 pounds (115% of WLL)</p>\n\n<p>10</p>\n\n<p>Electric Motors</p>\n\n<p>1</p>\n\n<p>Normal RIHB Boat Davit and Emergency RIHB Davit HPU Motors</p>\n\n<p></p>\n\n<p>Perform Insulation Resistance Test in accordance with ANSI/EASA AR 100-2020.and Para 6.5.4.3 of TP 9618. Submit a CFR.</p>\n\n<p>11</p>\n\n<p>Fabricate and Install</p>\n\n<p>1</p>\n\n<p>Label plate</p>\n\n<p>B2.9 (Label Plates)</p>\n\n<p></p>\n\n<p>12</p>\n\n<p>Partially Preserve</p>\n\n<p>1</p>\n\n<p>Dual Point Davit Assembly (including pedestal, foundation, and all previously/normally painted components or surfaces)</p>\n\n<p>3.2.4 (Partial Preservation)</p>\n\n<p></p>\n\n<p>3.2.1 <u>Hook certification</u>.&nbsp; The Contractor with Tech Rep support must inspect the hooks and verify their certification. Submit a CIR. Hooks (i.e.&nbsp; P/N: Model APR-356-CBH) must be renewed at every 48 months with GFP. Renew hooks if certification is expired.</p>\n\n<p>3.2.1.1 Mandatory Turn-in Item (MTI) removal. If required to be renewed, the Contractor must remove the existing MTI hooks and turn over to the COR.</p>\n\n<p>3.3 <u>Special requirements for various components</u>.&nbsp; If a Change Request has been authorized for additional work on any of the components listed in Table 4 below, the Contractor must perform work in accordance with the corresponding Appendix or paragraph of SFLC Std Spec 5000.</p>\n\n<p><strong>TABLE 4 - SPECIAL REQUIREMENTS</strong></p>\n\n<p><strong>Component</strong></p>\n\n<p><strong>Appendix &amp; Paragraph in sflc std spec 5000</strong></p>\n\n<p>Fluids</p>\n\n<p>C2.1</p>\n\n<p>Hose assemblies</p>\n\n<p>C2.2</p>\n\n<p>Piping and tubing</p>\n\n<p>C2.3</p>\n\n<p>Valves and manifolds</p>\n\n<p>C2.4</p>\n\n<p>Gages</p>\n\n<p>C2.5</p>\n\n<p>Gas charged accumulators</p>\n\n<p>C2.6</p>\n\n<p>Heat exchangers and fluid coolers</p>\n\n<p>C2.7</p>\n\n<p>Systems</p>\n\n<p>C2.8</p>\n\n<p>Fastener assemblies</p>\n\n<p>D2.1</p>\n\n<p>Wire rope assemblies</p>\n\n<p>D2.2</p>\n\n<p>Brakes and clutches</p>\n\n<p>D2.3</p>\n\n<p>Open gearing and gear reducers</p>\n\n<p>D2.4</p>\n\n<p><strong>NOTE</strong></p>\n\n<p><strong>Coast Guard personnel will operate all shipboard machinery and equipment.</strong></p>\n\n<p>3.3.1 Perform adjustment and calibration IAW Tech Pub 9618 for Main System Relief Pressure, Counterbalance Valves, Anti-2-block Assembly, Constant Tension Winch Pressure Adjustments.</p>\n\n<p>3.4 <u>Operational test, post repairs</u>. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.</p>\n\n<p>3.4.1 The Contractor with Tech Rep support must perform a dockside test, consisting of launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Submit a CFR.</p>\n\n<p>3.5 <u>Touch-up preservation</u>.&nbsp; The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310.&nbsp; Abide by all touch-up requirements outlined in SFLC Std Spec 6310.</p>\n\n<p><strong>NOTE</strong></p>\n\n<p><strong>Government will provide 72 Hours of advance notice to the Contractor for sea trial support by the Tech Rep.</strong></p>\n\n<p>3.6 <u>Sea trial</u>.&nbsp; The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP.&nbsp; Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR.</p>\n\n<p><strong>4.&nbsp; NOTES</strong></p>\n\n<p></p>\n\n<p><strong>General Requirements</strong> &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>1. SCOPE</strong>  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.  &nbsp;</p>\n\n<p> &nbsp;<br />\n<strong>2. REFERENCES</strong>  &nbsp;</p>\n\n<p> &nbsp;<br />\n<strong>COAST GUARD DRAWINGS</strong>  &nbsp;</p>\n\n<p> &nbsp;<br />\nNone.  &nbsp;</p>\n\n<p> &nbsp;<br />\n<strong>COAST GUARD PUBLICATIONS</strong>  &nbsp;</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p><strong>OTHER REFERENCES</strong>  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>None.&nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p><strong>3. REQUIREMENTS</strong>  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p></p>\n\n<p>3.2 <u>Period of Performance</u>. The period of performance for this work is 10MAR2025-28MAY2025, to include sea trials on 01JUL2025.</p>\n\n<p> &nbsp;</p>\n\n<p>3.3 <u>Location</u>. The Contractor must perform the work while the USCGC WAESCHE is alongside the pier at U.S. Coast Guard Base Alameda, Coast Guard Island, Alameda CA 94501.   &nbsp;</p>\n\n<p></p>\n\n<p></p>\n\n<p><em>TCTO 58300_TAB_0824_418</em></p>\n\n<p><strong>Dual Point Davit, Modify</strong></p>\n\n<p><strong>1.&nbsp; SCOPE</strong></p>\n\n<p>1.1 Intent.&nbsp; This work item describes the requirements for the Contractor to modify the Allied System Dual Point Davit (DPD) with Split/Individual Constant Tension (CT) capability, Solid State Driver for ease of system adjustments and to install machinery space camera system</p>\n\n<p><strong>TABLE 1 &ndash; DUAL POINT DAVIT NAMEPLATE DATA</strong></p>\n\n<p><strong>description</strong></p>\n\n<p><strong>LOCATION</strong></p>\n\n<p><strong>davit total gross weight</strong></p>\n\n<p>Allied Systems Dual Point Davit with Control Console</p>\n\n<p>Models : DDP11000CTS &amp; SP2200 (S/N - 2313 &amp; 2315)</p>\n\n<p>Weather Deck, STBD Side, Frame 47</p>\n\n<p>29,000 lbs.</p>\n\n<p>1.2 <u>Government</u><u>-furnished property</u>.</p>\n\n<p><strong>MTI</strong></p>\n\n<p><strong>ITEM DESCRIPTION</strong></p>\n\n<p><strong>NSN/PN</strong></p>\n\n<p><strong>QTY</strong></p>\n\n<p><strong>ESTIMATED COST ($/UNIT)</strong></p>\n\n<p>Y</p>\n\n<p>CB-OTH Mark IV</p>\n\n<p>(Coast Guard Drawing 26B-CB-IV-801-001)</p>\n\n<p></p>\n\n<p>1 ea.</p>\n\n<p>300,000</p>\n\n<p>N</p>\n\n<p>Kit-DDP11000CT</p>\n\n<p>ACN 2030-01-F24-6826/PN 93030</p>\n\n<p>1</p>\n\n<p>5,000</p>\n\n<p><strong>2.&nbsp; REFERENCES</strong></p>\n\n<p><strong>Coast Guard Drawings</strong></p>\n\n<p>Coast Guard Drawing 418A-WMSL-100-001 Rev B, General Arrangements</p>\n\n<p><strong>Coast Guard Publications</strong></p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements</p>\n\n<p>Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures</p>\n\n<p>Coast Guard Technical Publication (TP) 9618, SWBS 583, 01 Sept 2023 BOAT DAVIT - MODELS DDP11000CTS &amp; SP2200 (S/N: 2328-753, 2329-751, 2332-750)</p>\n\n<p><strong>Other References</strong></p>\n\n<p>International Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011.</p>\n\n<p>International Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition.</p>\n\n<p>Allied Systems Company ASC DWG# 94861, Chart, Splicing Connector</p>\n\n<p>Allied Systems Company ASC DWG# 94081, Kit, Individual CT Control System</p>\n\n<p>Allied Systems Company ASC DWG# 93034, Hydraulic Schematic</p>\n\n<p>Allied Systems Company ASC DWG# 93031, Individual CT HYD Conversion</p>\n\n<p></p>\n\n<p><strong>3.&nbsp; REQUIREMENTS</strong></p>\n\n<p>3.1 <u>General.</u></p>\n\n<p>3.1.1 <u>CIR</u>.&nbsp; The Contractor must submit a CIR for the inspections listed in the following paragraph(s):</p>\n\n<p>None</p>\n\n<p>3.1.2 <u>Tech Rep.</u></p>\n\n<p>3.1.2.1 The Contractor must provide the services of a qualified&nbsp;services of an OEM authorized/ licensed<u> </u>Tech Rep who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CT) to do the following, on site:&nbsp;</p>\n\n<ul>\n\t<li>Provide manufacturer&#39;s proprietary information, software, and tools pertinent to the equipment/system.</li>\n\t<li>Assist with proper repair methods and ensure compliance with manufacturer&#39;s procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.</li>\n\t<li>Tech Rep must be present in all aspects of this work item.</li>\n\t<li>Ride the ship during sea trials (8 hours)</li>\n</ul>\n\n<p>3.1.2.2 Ensure the Tech Rep has a r&eacute;sum&eacute; of demonstrated experience with the system/equipment stated above.</p>\n\n<p>3.1.2.3 Submit a copy of the Tech Rep&rsquo;s r&eacute;sum&eacute; and a list of references to the COR with the bid proposal.</p>\n\n<p>3.1.2.4 Point of contact:</p>\n\n<ul>\n\t<li>Heath Munger or Gary Berglund</li>\n\t<li>Heath.munger@alliedsystems.com, Gary.Berglund@AlliedSystems.com</li>\n\t<li>Allied Systems Company</li>\n\t<li>(503) 825-3366</li>\n</ul>\n\n<p></p>\n\n<p>3.1.3 <u>Protective</u><u> measures</u>.&nbsp; The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).</p>\n\n<p>3.1.3.1 <u>Protective</u><u> measures - hydraulic system</u><u>.</u> The Contractor must maintain existing hydraulic system cleanliness; take all necessary precautions to prevent the introduction of contaminants into the hydraulic system. Whenever disconnecting or removing components from the hydraulic system, completely seal all openings to the rest of the system, immediately, using either caps (for externally threaded connection points), bolt-on blanks, or taped-on discs/covers (sheet-metal no less than 1/16-inch thick).</p>\n\n<p>3.1.4 <u>Interferences</u>.&nbsp; The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).&nbsp; Known interferences include, but are not limited to the below listed:</p>\n\n<ul>\n\t<li>Piping</li>\n\t<li>Electrical Cables</li>\n</ul>\n\n<p>3.1.5 <u>Reference</u><u> documents</u><u>.</u>&nbsp;&nbsp; The Contractor must refer to the drawings and Tech Pubs referenced in Section 2 for guidance in accomplishing this work item. &nbsp;&nbsp;&nbsp;</p>\n\n<p><strong>NOTE</strong></p>\n\n<p><strong>Coast Guard personnel will operate all shipboard machinery and equipment.</strong></p>\n\n<p>3.2 <u>Operational test, initial</u>. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.</p>\n\n<p>3.3 <u>Split/Individual Constant Tension (CT)</u>. The Contractor must follow Tech Rep direction and requirements listed in referenced documents to modify the Allied System Dual Point Davit (DPD) for Split/Individual Constant Tension (CT) capability.</p>\n\n<p>3.4 <u>Install Camera kit</u>. The Contractor must follow Tech Rep direction and requirements listed in referenced documents, to install camera system to enable operators to view machinery space without the need to remove side panels.</p>\n\n<p>3.5 <u>Winch tensioner</u>. The Contractor must renew the Aft winch tensioner and drum.</p>\n\n<p>3.6 <u>Sea trial</u>.&nbsp; The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP.&nbsp; Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR.</p>\n\n<p>3.7 <u>Touch</u><u>-up preservation</u>.&nbsp; The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310.&nbsp; Abide by all touch-up requirements outlined in SFLC Std Spec 6310.</p>\n\n<p><strong>4.&nbsp; NOTES</strong></p>\n\n<p>This section is not applicable to this work item.</p>\n\n<p></p>\n\n<p></p>\n\n<p><em>&nbsp;58300_RTK_1223_418</em></p>\n\n<p><strong>Dual Point Davit, Biennial Maintenance, Perform</strong></p>\n\n<p><strong>1.&nbsp; SCOPE</strong></p>\n\n<p>1.1 <u>Intent</u>.&nbsp; This work item describes the requirements for the Contractor to perform Biennial Maintenance on Dual Point Davit listed in Table 1.</p>\n\n<p><strong>TABLE 1 &ndash; DUAL POINT DAVIT NAMEPLATE DATA</strong></p>\n\n<p><strong>description</strong></p>\n\n<p><strong>LOCATION</strong></p>\n\n<p><strong>davit total gross weight</strong></p>\n\n<p>Allied Systems Dual Point Davit with Control Console</p>\n\n<p>Models: DDP11000CTS &amp; SP2200</p>\n\n<p>Weather Deck, STBD Side, Frame 47</p>\n\n<p>29,000 lbs.</p>\n\n<p>1.2 <u>Government-furnished property</u>.</p>\n\n<p><strong>MTI</strong></p>\n\n<p><strong>ITEM DESCRIPTION</strong></p>\n\n<p><strong>NSN/PN</strong></p>\n\n<p><strong>QTY</strong></p>\n\n<p><strong>ESTIMATED COST ($/UNIT)</strong></p>\n\n<p>Y</p>\n\n<p>CB-OTH Mark IV</p>\n\n<p>(Coast Guard Drawing 26B-CB-IV-801-001)</p>\n\n<p>N/A</p>\n\n<p>1 ea.</p>\n\n<p>N/A</p>\n\n<p>Y</p>\n\n<p>HOOK, RELEASE, BOAT DAVIT</p>\n\n<p>Model APR-356-CBH, NSN 4030-01-467-1005</p>\n\n<p>2 ea.</p>\n\n<p>5000.00</p>\n\n<p><strong>2.&nbsp; REFERENCES</strong></p>\n\n<p><strong>Coast Guard Drawings</strong></p>\n\n<p>Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements</p>\n\n<p>Coast Guard Drawing 418A-WMSL-801-001 Rev A, Booklet of General Plan</p>\n\n<p><strong>Coast Guard Publications</strong></p>\n\n<p>Coast Guard Technical Publication (TP) 9618, SWBS 583, Sept 2023, Boat Davit - Models DDP11000CTS &amp; SP2200 (S/N: 2328-753, 2329-751, 2332-750)</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000),2022, General Requirements</p>\n\n<p>Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems</p>\n\n<p>Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures</p>\n\n<p><strong>Other References</strong></p>\n\n<p>International Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011</p>\n\n<p>International Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition</p>\n\n<p>ANSI/EASA Standard AR100-2020,&nbsp; Recommended Practice for the Repair of Rotating Electrical Apparatus</p>\n\n<p><strong>3.&nbsp; REQUIREMENTS</strong></p>\n\n<p>3.1 <u>General</u>.</p>\n\n<p>3.1.1 <u>CIR</u>.&nbsp; The Contractor must submit a CIR for the inspections listed in the following paragraph(s):</p>\n\n<ul>\n\t<li>3.2 <u>Biannual maintenance inspection and repair task particulars</u> (Task #1 and #2)</li>\n\t<li>3.2.1 <u>Hook certification</u>.&nbsp;</li>\n</ul>\n\n<p>3.1.2 <u>Tech Rep</u>. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CTS) to accomplish the following on site:</p>\n\n<ul>\n\t<li>Advise on manufacturer&#39;s proprietary system information.</li>\n\t<li>Ensure compliance with manufacturer&#39;s procedures and standards during system disassembly, inspection, repair, reassembly, and testing as applicable.</li>\n</ul>\n\n<p>3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their r&eacute;sum&eacute;.</p>\n\n<p>3.1.2.2 Submit a copy of the Tech Rep&rsquo;s r&eacute;sum&eacute; and a list of references to the COR with the bid proposal.</p>\n\n<p>3.1.2.3 Point of contact:</p>\n\n<ul>\n\t<li>Heath Munger or Gary Berglund</li>\n\t<li>Heath.munger@alliedsystems.com, Gary.Berglund@AlliedSystems.com</li>\n\t<li>Allied Systems Company</li>\n\t<li>(503) 825-3366</li>\n</ul>\n\n<p>3.1.3 <u>Protective measures</u>.&nbsp; The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).</p>\n\n<p>3.1.3.1 Protection of fine surfaces. The Contractor must protect all fine surfaces in accordance with SFLC Std. Spec 5000.</p>\n\n<p>3.1.3.2 Hydraulic system contamination protection. The Contractor must maintain existing hydraulic cleanliness in accordance with SFLC Std. Spec 5000.</p>\n\n<p>3.1.4 <u>Interferences</u>.&nbsp; The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).&nbsp; Known interferences include, but are not limited to the following:</p>\n\n<ul>\n\t<li>Piping</li>\n\t<li>Electrical Cables</li>\n\t<li>Capstan</li>\n\t<li>Inspection Covers</li>\n</ul>\n\n<p><strong>NOTE</strong></p>\n\n<p><strong>Coast Guard personnel will operate all shipboard machinery and equipment.</strong></p>\n\n<p>3.1.5 <u>Operational test, initial</u>. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.</p>\n\n<p>3.1.6 <u>Materials</u>.&nbsp; The Contractor must furnish and install parts listed in Table 2.</p>\n\n<p><strong>TABLE 2 &ndash; LIST OF PARTS</strong></p>\n\n<p><strong>QUANTITY</strong></p>\n\n<p><strong>PART NUMBER</strong></p>\n\n<p><strong>DESCRIPTION</strong></p>\n\n<p><strong>SOURCE OF SUPPLY</strong></p>\n\n<p>1</p>\n\n<p>593533</p>\n\n<p>Kit, Element Replacement</p>\n\n<p>Allied System Co.</p>\n\n<p>214 S.W. Oregon Street, Sherwood OR 97140</p>\n\n<p>1</p>\n\n<p>593532</p>\n\n<p>Kit, Element Replacement</p>\n\n<p>2</p>\n\n<p>70196</p>\n\n<p>Return Filters</p>\n\n<p>2</p>\n\n<p>74130</p>\n\n<p>Seal Kits</p>\n\n<p>2</p>\n\n<p>71975</p>\n\n<p>Filter Breather</p>\n\n<p>1</p>\n\n<p>71754</p>\n\n<p>Tank Cover Gasket</p>\n\n<p>2</p>\n\n<p>71042</p>\n\n<p>Wire Rope</p>\n\n<p>2</p>\n\n<p>73441</p>\n\n<p>Hub</p>\n\n<p>3.2 <u>Biannual maintenance inspection and repair task particulars.</u>&nbsp; The Contractor with Tech Rep support must perform the tasks designated in Table 3 below and Figure 1 in accordance with SFLC Std Spec 5000 and CG Tech Pub as applicable.</p>\n\n<p><strong>TABLE 3 &ndash; Recurring Maintenance task</strong></p>\n\n<p></p>\n\n<p><strong>ADDITION REQUIREMENTS</strong></p>\n\n<p><strong>#</strong></p>\n\n<p><strong>TASK TYPE</strong></p>\n\n<p><strong>QTY</strong></p>\n\n<p><strong>COMPONENT OR ASSEMBLY</strong></p>\n\n<p><strong>APPENDIX AND PARA. FROM SFLC STD 5000</strong></p>\n\n<p><strong>OTHER</strong></p>\n\n<p>1</p>\n\n<p>Operate and Inspect</p>\n\n<p>1</p>\n\n<p>Dual Point Davit System</p>\n\n<p>3.2.1 (Operate and Inspect) Appendix A (General Inspection Requirements)</p>\n\n<p>Submit CIR.</p>\n\n<p>2</p>\n\n<p>Hydraulic Lube Oil Analysis</p>\n\n<p>1</p>\n\n<p>Hydraulic System</p>\n\n<p>C2.1.3.1</p>\n\n<p>Submit a CIR.</p>\n\n<p>3</p>\n\n<p>Service and Inspect</p>\n\n<p>1</p>\n\n<p>Hydraulic Winch Assembly (Constant Tension and Normal) which are powered by Main Hydraulic Pump/Motor Assembly (ST1) and Back Up powered by Emergency (ST2), Accumulators.</p>\n\n<p>3.2.2 (Service and Inspect) D2.3 (Brakes and clutches.&nbsp; D2.4 (Open gearing and gear reducers)</p>\n\n<p>See Paragraph 3.3.1</p>\n\n<p></p>\n\n<p>Submit CFR.</p>\n\n<p>4</p>\n\n<p>Disassemble and Inspect</p>\n\n<p>2</p>\n\n<p>Power Sheave Assembly</p>\n\n<p>3.2.3 (Disassemble and Inspect)</p>\n\n<p>Renew the hubs</p>\n\n<p>If hubs are not available, clean, inspect, and reinstall hubs.</p>\n\n<p>5</p>\n\n<p>Renew</p>\n\n<p>2</p>\n\n<p>Wire Rope Assembly</p>\n\n<p>(Allied System Part No. 71042)</p>\n\n<p>D2.2 (Wire rope assemblies)</p>\n\n<p><u>Wire rope particulars</u>: Nominal diameter: 5/8 inch</p>\n\n<p></p>\n\n<p>Minimum Breaking Strength: 56,040 lbs.</p>\n\n<p></p>\n\n<p>Total length of each wire rope required: 110 ft.</p>\n\n<p>End fitting type: Fiege. Submit a CFR.</p>\n\n<p>6</p>\n\n<p>Service and Inspect&nbsp;</p>\n\n<p>1&nbsp;</p>\n\n<p>Control Panel&nbsp;</p>\n\n<p>3.2.2 (Service and Inspect)&nbsp;</p>\n\n<p>Verify all mechanical and electrical signals to the control panel. Submit a CFR.&nbsp;</p>\n\n<p>7</p>\n\n<p>NDE</p>\n\n<p>1</p>\n\n<p>Dual Point Davit System</p>\n\n<p>3.2.5 (NDE)</p>\n\n<p>Areas to NDE: all weld joints and boom and turret structures.</p>\n\n<p>Submit a CFR.</p>\n\n<p>8</p>\n\n<p>Groom and Lubricate</p>\n\n<p>1</p>\n\n<p>Dual Point Davit System</p>\n\n<p>3.2.6 (Groom and Lubricate)</p>\n\n<p></p>\n\n<p>9</p>\n\n<p>Weight Test</p>\n\n<p>1</p>\n\n<p>Dual Point Davit System</p>\n\n<p>B2.7.2 (Dual Point Davits)</p>\n\n<p>B2.7.2.1 No-load Operational Test</p>\n\n<p>B2.7.2.2 Static Load Test</p>\n\n<p>B2.7.2.3 Winch/Brake/Modified static load Test</p>\n\n<p>B2.7.2.4 Dynamic Load Test</p>\n\n<p>B2.7.2.5 Rated Load test</p>\n\n<p></p>\n\n<p>Test weight particulars:</p>\n\n<p>Working Load Limit (11,000 lb.).</p>\n\n<p></p>\n\n<p>&quot;Modified static / brake&quot; test load: 16,500 pounds (150% of WLL)</p>\n\n<p></p>\n\n<p>&ldquo;Modified Dynamic Test Load: 12,650 pounds (115% of WLL)</p>\n\n<p>10</p>\n\n<p>Electric Motors</p>\n\n<p>1</p>\n\n<p>Normal RIHB Boat Davit and Emergency RIHB Davit HPU Motors</p>\n\n<p></p>\n\n<p>Perform Insulation Resistance Test in accordance with ANSI/EASA AR 100-2020.and Para 6.5.4.3 of TP 9618. Submit a CFR.</p>\n\n<p>11</p>\n\n<p>Fabricate and Install</p>\n\n<p>1</p>\n\n<p>Label plate</p>\n\n<p>B2.9 (Label Plates)</p>\n\n<p></p>\n\n<p>12</p>\n\n<p>Partially Preserve</p>\n\n<p>1</p>\n\n<p>Dual Point Davit Assembly (including pedestal, foundation, and all previously/normally painted components or surfaces)</p>\n\n<p>3.2.4 (Partial Preservation)</p>\n\n<p></p>\n\n<p>3.2.1 <u>Hook certification</u>.&nbsp; The Contractor with Tech Rep support must inspect the hooks and verify their certification. Submit a CIR. Hooks (i.e.&nbsp; P/N: Model APR-356-CBH) must be renewed at every 48 months with GFP. Renew hooks if certification is expired.</p>\n\n<p>3.2.1.1 Mandatory Turn-in Item (MTI) removal. If required to be renewed, the Contractor must remove the existing MTI hooks and turn over to the COR.</p>\n\n<p>3.3 <u>Special requirements for various components</u>.&nbsp; If a Change Request has been authorized for additional work on any of the components listed in Table 4 below, the Contractor must perform work in accordance with the corresponding Appendix or paragraph of SFLC Std Spec 5000.</p>\n\n<p><strong>TABLE 4 - SPECIAL REQUIREMENTS</strong></p>\n\n<p><strong>Component</strong></p>\n\n<p><strong>Appendix &amp; Paragraph in sflc std spec 5000</strong></p>\n\n<p>Fluids</p>\n\n<p>C2.1</p>\n\n<p>Hose assemblies</p>\n\n<p>C2.2</p>\n\n<p>Piping and tubing</p>\n\n<p>C2.3</p>\n\n<p>Valves and manifolds</p>\n\n<p>C2.4</p>\n\n<p>Gages</p>\n\n<p>C2.5</p>\n\n<p>Gas charged accumulators</p>\n\n<p>C2.6</p>\n\n<p>Heat exchangers and fluid coolers</p>\n\n<p>C2.7</p>\n\n<p>Systems</p>\n\n<p>C2.8</p>\n\n<p>Fastener assemblies</p>\n\n<p>D2.1</p>\n\n<p>Wire rope assemblies</p>\n\n<p>D2.2</p>\n\n<p>Brakes and clutches</p>\n\n<p>D2.3</p>\n\n<p>Open gearing and gear reducers</p>\n\n<p>D2.4</p>\n\n<p><strong>NOTE</strong></p>\n\n<p><strong>Coast Guard personnel will operate all shipboard machinery and equipment.</strong></p>\n\n<p>3.3.1 Perform adjustment and calibration IAW Tech Pub 9618 for Main System Relief Pressure, Counterbalance Valves, Anti-2-block Assembly, Constant Tension Winch Pressure Adjustments.</p>\n\n<p>3.4 <u>Operational test, post repairs</u>. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.</p>\n\n<p>3.4.1 The Contractor with Tech Rep support must perform a dockside test, consisting of launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Submit a CFR.</p>\n\n<p>3.5 <u>Touch-up preservation</u>.&nbsp; The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310.&nbsp; Abide by all touch-up requirements outlined in SFLC Std Spec 6310.</p>\n\n<p><strong>NOTE</strong></p>\n\n<p><strong>Government will provide 72 Hours of advance notice to the Contractor for sea trial support by the Tech Rep.</strong></p>\n\n<p>3.6 <u>Sea trial</u>.&nbsp; The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP.&nbsp; Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR.</p>\n\n<p><strong>4.&nbsp; NOTES</strong></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>FIGURE 1: DUAL POINT DAVIT MAINTENANCE TABLE</strong></p>\n\n<p></p>\n\n<p><strong>FIGURE 1: DUAL POINT DAVIT MAINTENANCE TABLE</strong></p>\n\n<p></p>","text":"General Requirements\n\n1. SCOPE\n\n1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.\n\n2. REFERENCES\n\nCOAST GUARD DRAWINGS\n\nNone.\n\nCOAST GUARD PUBLICATIONS\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nOTHER REFERENCES\n\nNone.\n\n3. REQUIREMENTS\n\n3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.\n\n3.2 Period of Performance. The period of performance for this work is 10MAR2025-28MAY2025, to include sea trials on 01JUL2025.\n\n3.3 Location. The Contractor must perform the work while the USCGC WAESCHE is alongside the pier at U.S. Coast Guard Base Alameda, Coast Guard Island, Alameda CA 94501.\n\nTCTO 58300_TAB_0824_418\n\nDual Point Davit, Modify\n\n1. SCOPE\n\n1.1 Intent. This work item describes the requirements for the Contractor to modify the Allied System Dual Point Davit (DPD) with Split/Individual Constant Tension (CT) capability, Solid State Driver for ease of system adjustments and to install machinery space camera system\n\nTABLE 1 – DUAL POINT DAVIT NAMEPLATE DATA\n\ndescription\n\nLOCATION\n\ndavit total gross weight\n\nAllied Systems Dual Point Davit with Control Console\n\nModels : DDP11000CTS & SP2200 (S/N - 2313 & 2315)\n\nWeather Deck, STBD Side, Frame 47\n\n29,000 lbs.\n\n1.2 Government-furnished property.\n\nMTI\n\nITEM DESCRIPTION\n\nNSN/PN\n\nQTY\n\nESTIMATED COST ($/UNIT)\n\nY\n\nCB-OTH Mark IV\n\n(Coast Guard Drawing 26B-CB-IV-801-001)\n\n1 ea.\n\n300,000\n\nN\n\nKit-DDP11000CT\n\nACN 2030-01-F24-6826/PN 93030\n\n1\n\n5,000\n\n2. REFERENCES\n\nCoast Guard Drawings\n\nCoast Guard Drawing 418A-WMSL-100-001 Rev B, General Arrangements\n\nCoast Guard Publications\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures\n\nCoast Guard Technical Publication (TP) 9618, SWBS 583, 01 Sept 2023 BOAT DAVIT - MODELS DDP11000CTS & SP2200 (S/N: 2328-753, 2329-751, 2332-750)\n\nOther References\n\nInternational Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011.\n\nInternational Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition.\n\nAllied Systems Company ASC DWG# 94861, Chart, Splicing Connector\n\nAllied Systems Company ASC DWG# 94081, Kit, Individual CT Control System\n\nAllied Systems Company ASC DWG# 93034, Hydraulic Schematic\n\nAllied Systems Company ASC DWG# 93031, Individual CT HYD Conversion\n\n3. REQUIREMENTS\n\n3.1 General.\n\n3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):\n\nNone\n\n3.1.2 Tech Rep.\n\n3.1.2.1 The Contractor must provide the services of a qualified services of an OEM authorized/ licensed Tech Rep who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CT) to do the following, on site:\n\n• Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system.\n\n• Assist with proper repair methods and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.\n\n• Tech Rep must be present in all aspects of this work item.\n\n• Ride the ship during sea trials (8 hours)\n\n3.1.2.2 Ensure the Tech Rep has a résumé of demonstrated experience with the system/equipment stated above.\n\n3.1.2.3 Submit a copy of the Tech Rep’s résumé and a list of references to the COR with the bid proposal.\n\n3.1.2.4 Point of contact:\n\n• Heath Munger or Gary Berglund\n\n• Heath.munger@alliedsystems.com, Gary.Berglund@AlliedSystems.com\n\n• Allied Systems Company\n\n• (503) 825-3366\n\n3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).\n\n3.1.3.1 Protective measures - hydraulic system. The Contractor must maintain existing hydraulic system cleanliness; take all necessary precautions to prevent the introduction of contaminants into the hydraulic system. Whenever disconnecting or removing components from the hydraulic system, completely seal all openings to the rest of the system, immediately, using either caps (for externally threaded connection points), bolt-on blanks, or taped-on discs/covers (sheet-metal no less than 1/16-inch thick).\n\n3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\n• Piping\n\n• Electrical Cables\n\n3.1.5 Reference documents. The Contractor must refer to the drawings and Tech Pubs referenced in Section 2 for guidance in accomplishing this work item.\n\nNOTE\n\nCoast Guard personnel will operate all shipboard machinery and equipment.\n\n3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.\n\n3.3 Split/Individual Constant Tension (CT). The Contractor must follow Tech Rep direction and requirements listed in referenced documents to modify the Allied System Dual Point Davit (DPD) for Split/Individual Constant Tension (CT) capability.\n\n3.4 Install Camera kit. The Contractor must follow Tech Rep direction and requirements listed in referenced documents, to install camera system to enable operators to view machinery space without the need to remove side panels.\n\n3.5 Winch tensioner. The Contractor must renew the Aft winch tensioner and drum.\n\n3.6 Sea trial. The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP. Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR.\n\n3.7 Touch-up preservation. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310. Abide by all touch-up requirements outlined in SFLC Std Spec 6310.\n\n4. NOTES\n\nThis section is not applicable to this work item.\n\n58300_RTK_1223_418\n\nDual Point Davit, Biennial Maintenance, Perform\n\n1. SCOPE\n\n1.1 Intent. This work item describes the requirements for the Contractor to perform Biennial Maintenance on Dual Point Davit listed in Table 1.\n\nTABLE 1 – DUAL POINT DAVIT NAMEPLATE DATA\n\ndescription\n\nLOCATION\n\ndavit total gross weight\n\nAllied Systems Dual Point Davit with Control Console\n\nModels: DDP11000CTS & SP2200\n\nWeather Deck, STBD Side, Frame 47\n\n29,000 lbs.\n\n1.2 Government-furnished property.\n\nMTI\n\nITEM DESCRIPTION\n\nNSN/PN\n\nQTY\n\nESTIMATED COST ($/UNIT)\n\nY\n\nCB-OTH Mark IV\n\n(Coast Guard Drawing 26B-CB-IV-801-001)\n\nN/A\n\n1 ea.\n\nN/A\n\nY\n\nHOOK, RELEASE, BOAT DAVIT\n\nModel APR-356-CBH, NSN 4030-01-467-1005\n\n2 ea.\n\n5000.00\n\n2. REFERENCES\n\nCoast Guard Drawings\n\nCoast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements\n\nCoast Guard Drawing 418A-WMSL-801-001 Rev A, Booklet of General Plan\n\nCoast Guard Publications\n\nCoast Guard Technical Publication (TP) 9618, SWBS 583, Sept 2023, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2328-753, 2329-751, 2332-750)\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000),2022, General Requirements\n\nSurface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems\n\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures\n\nOther References\n\nInternational Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011\n\nInternational Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition\n\nANSI/EASA Standard AR100-2020, Recommended Practice for the Repair of Rotating Electrical Apparatus\n\n3. REQUIREMENTS\n\n3.1 General.\n\n3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):\n\n• 3.2 Biannual maintenance inspection and repair task particulars (Task #1 and #2)\n\n• 3.2.1 Hook certification.\n\n3.1.2 Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CTS) to accomplish the following on site:\n\n• Advise on manufacturer's proprietary system information.\n\n• Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, repair, reassembly, and testing as applicable.\n\n3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their résumé.\n\n3.1.2.2 Submit a copy of the Tech Rep’s résumé and a list of references to the COR with the bid proposal.\n\n3.1.2.3 Point of contact:\n\n• Heath Munger or Gary Berglund\n\n• Heath.munger@alliedsystems.com, Gary.Berglund@AlliedSystems.com\n\n• Allied Systems Company\n\n• (503) 825-3366\n\n3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).\n\n3.1.3.1 Protection of fine surfaces. The Contractor must protect all fine surfaces in accordance with SFLC Std. Spec 5000.\n\n3.1.3.2 Hydraulic system contamination protection. The Contractor must maintain existing hydraulic cleanliness in accordance with SFLC Std. Spec 5000.\n\n3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:\n\n• Piping\n\n• Electrical Cables\n\n• Capstan\n\n• Inspection Covers\n\nNOTE\n\nCoast Guard personnel will operate all shipboard machinery and equipment.\n\n3.1.5 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.\n\n3.1.6 Materials. The Contractor must furnish and install parts listed in Table 2.\n\nTABLE 2 – LIST OF PARTS\n\nQUANTITY\n\nPART NUMBER\n\nDESCRIPTION\n\nSOURCE OF SUPPLY\n\n1\n\n593533\n\nKit, Element Replacement\n\nAllied System Co.\n\n214 S.W. Oregon Street, Sherwood OR 97140\n\n1\n\n593532\n\nKit, Element Replacement\n\n2\n\n70196\n\nReturn Filters\n\n2\n\n74130\n\nSeal Kits\n\n2\n\n71975\n\nFilter Breather\n\n1\n\n71754\n\nTank Cover Gasket\n\n2\n\n71042\n\nWire Rope\n\n2\n\n73441\n\nHub\n\n3.2 Biannual maintenance inspection and repair task particulars. The Contractor with Tech Rep support must perform the tasks designated in Table 3 below and Figure 1 in accordance with SFLC Std Spec 5000 and CG Tech Pub as applicable.\n\nTABLE 3 – Recurring Maintenance task\n\nADDITION REQUIREMENTS\n\n#\n\nTASK TYPE\n\nQTY\n\nCOMPONENT OR ASSEMBLY\n\nAPPENDIX AND PARA. FROM SFLC STD 5000\n\nOTHER\n\n1\n\nOperate and Inspect\n\n1\n\nDual Point Davit System\n\n3.2.1 (Operate and Inspect) Appendix A (General Inspection Requirements)\n\nSubmit CIR.\n\n2\n\nHydraulic Lube Oil Analysis\n\n1\n\nHydraulic System\n\nC2.1.3.1\n\nSubmit a CIR.\n\n3\n\nService and Inspect\n\n1\n\nHydraulic Winch Assembly (Constant Tension and Normal) which are powered by Main Hydraulic Pump/Motor Assembly (ST1) and Back Up powered by Emergency (ST2), Accumulators.\n\n3.2.2 (Service and Inspect) D2.3 (Brakes and clutches. D2.4 (Open gearing and gear reducers)\n\nSee Paragraph 3.3.1\n\nSubmit CFR.\n\n4\n\nDisassemble and Inspect\n\n2\n\nPower Sheave Assembly\n\n3.2.3 (Disassemble and Inspect)\n\nRenew the hubs\n\nIf hubs are not available, clean, inspect, and reinstall hubs.\n\n5\n\nRenew\n\n2\n\nWire Rope Assembly\n\n(Allied System Part No. 71042)\n\nD2.2 (Wire rope assemblies)\n\nWire rope particulars: Nominal diameter: 5/8 inch\n\nMinimum Breaking Strength: 56,040 lbs.\n\nTotal length of each wire rope required: 110 ft.\n\nEnd fitting type: Fiege. Submit a CFR.\n\n6\n\nService and Inspect\n\n1\n\nControl Panel\n\n3.2.2 (Service and Inspect)\n\nVerify all mechanical and electrical signals to the control panel. Submit a CFR.\n\n7\n\nNDE\n\n1\n\nDual Point Davit System\n\n3.2.5 (NDE)\n\nAreas to NDE: all weld joints and boom and turret structures.\n\nSubmit a CFR.\n\n8\n\nGroom and Lubricate\n\n1\n\nDual Point Davit System\n\n3.2.6 (Groom and Lubricate)\n\n9\n\nWeight Test\n\n1\n\nDual Point Davit System\n\nB2.7.2 (Dual Point Davits)\n\nB2.7.2.1 No-load Operational Test\n\nB2.7.2.2 Static Load Test\n\nB2.7.2.3 Winch/Brake/Modified static load Test\n\nB2.7.2.4 Dynamic Load Test\n\nB2.7.2.5 Rated Load test\n\nTest weight particulars:\n\nWorking Load Limit (11,000 lb.).\n\n\"Modified static / brake\" test load: 16,500 pounds (150% of WLL)\n\n“Modified Dynamic Test Load: 12,650 pounds (115% of WLL)\n\n10\n\nElectric Motors\n\n1\n\nNormal RIHB Boat Davit and Emergency RIHB Davit HPU Motors\n\nPerform Insulation Resistance Test in accordance with ANSI/EASA AR 100-2020.and Para 6.5.4.3 of TP 9618. Submit a CFR.\n\n11\n\nFabricate and Install\n\n1\n\nLabel plate\n\nB2.9 (Label Plates)\n\n12\n\nPartially Preserve\n\n1\n\nDual Point Davit Assembly (including pedestal, foundation, and all previously/normally painted components or surfaces)\n\n3.2.4 (Partial Preservation)\n\n3.2.1 Hook certification. The Contractor with Tech Rep support must inspect the hooks and verify their certification. Submit a CIR. Hooks (i.e. P/N: Model APR-356-CBH) must be renewed at every 48 months with GFP. Renew hooks if certification is expired.\n\n3.2.1.1 Mandatory Turn-in Item (MTI) removal. If required to be renewed, the Contractor must remove the existing MTI hooks and turn over to the COR.\n\n3.3 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table 4 below, the Contractor must perform work in accordance with the corresponding Appendix or paragraph of SFLC Std Spec 5000.\n\nTABLE 4 - SPECIAL REQUIREMENTS\n\nComponent\n\nAppendix & Paragraph in sflc std spec 5000\n\nFluids\n\nC2.1\n\nHose assemblies\n\nC2.2\n\nPiping and tubing\n\nC2.3\n\nValves and manifolds\n\nC2.4\n\nGages\n\nC2.5\n\nGas charged accumulators\n\nC2.6\n\nHeat exchangers and fluid coolers\n\nC2.7\n\nSystems\n\nC2.8\n\nFastener assemblies\n\nD2.1\n\nWire rope assemblies\n\nD2.2\n\nBrakes and clutches\n\nD2.3\n\nOpen gearing and gear reducers\n\nD2.4\n\nNOTE\n\nCoast Guard personnel will operate all shipboard machinery and equipment.\n\n3.3.1 Perform adjustment and calibration IAW Tech Pub 9618 for Main System Relief Pressure, Counterbalance Valves, Anti-2-block Assembly, Constant Tension Winch Pressure Adjustments.\n\n3.4 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.\n\n3.4.1 The Contractor with Tech Rep support must perform a dockside test, consisting of launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Submit a CFR.\n\n3.5 Touch-up preservation. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310. Abide by all touch-up requirements outlined in SFLC Std Spec 6310.\n\nNOTE\n\nGovernment will provide 72 Hours of advance notice to the Contractor for sea trial support by the Tech Rep.\n\n3.6 Sea trial. The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP. Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR.\n\n4. NOTES\n\nGeneral Requirements\n\n1. SCOPE\n\n1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.\n\n2. REFERENCES\n\nCOAST GUARD DRAWINGS\n\nNone.\n\nCOAST GUARD PUBLICATIONS\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nOTHER REFERENCES\n\nNone.\n\n3. REQUIREMENTS\n\n3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.\n\n3.2 Period of Performance. The period of performance for this work is 10MAR2025-28MAY2025, to include sea trials on 01JUL2025.\n\n3.3 Location. The Contractor must perform the work while the USCGC WAESCHE is alongside the pier at U.S. Coast Guard Base Alameda, Coast Guard Island, Alameda CA 94501.\n\nTCTO 58300_TAB_0824_418\n\nDual Point Davit, Modify\n\n1. SCOPE\n\n1.1 Intent. This work item describes the requirements for the Contractor to modify the Allied System Dual Point Davit (DPD) with Split/Individual Constant Tension (CT) capability, Solid State Driver for ease of system adjustments and to install machinery space camera system\n\nTABLE 1 – DUAL POINT DAVIT NAMEPLATE DATA\n\ndescription\n\nLOCATION\n\ndavit total gross weight\n\nAllied Systems Dual Point Davit with Control Console\n\nModels : DDP11000CTS & SP2200 (S/N - 2313 & 2315)\n\nWeather Deck, STBD Side, Frame 47\n\n29,000 lbs.\n\n1.2 Government-furnished property.\n\nMTI\n\nITEM DESCRIPTION\n\nNSN/PN\n\nQTY\n\nESTIMATED COST ($/UNIT)\n\nY\n\nCB-OTH Mark IV\n\n(Coast Guard Drawing 26B-CB-IV-801-001)\n\n1 ea.\n\n300,000\n\nN\n\nKit-DDP11000CT\n\nACN 2030-01-F24-6826/PN 93030\n\n1\n\n5,000\n\n2. REFERENCES\n\nCoast Guard Drawings\n\nCoast Guard Drawing 418A-WMSL-100-001 Rev B, General Arrangements\n\nCoast Guard Publications\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures\n\nCoast Guard Technical Publication (TP) 9618, SWBS 583, 01 Sept 2023 BOAT DAVIT - MODELS DDP11000CTS & SP2200 (S/N: 2328-753, 2329-751, 2332-750)\n\nOther References\n\nInternational Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011.\n\nInternational Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition.\n\nAllied Systems Company ASC DWG# 94861, Chart, Splicing Connector\n\nAllied Systems Company ASC DWG# 94081, Kit, Individual CT Control System\n\nAllied Systems Company ASC DWG# 93034, Hydraulic Schematic\n\nAllied Systems Company ASC DWG# 93031, Individual CT HYD Conversion\n\n3. REQUIREMENTS\n\n3.1 General.\n\n3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):\n\nNone\n\n3.1.2 Tech Rep.\n\n3.1.2.1 The Contractor must provide the services of a qualified services of an OEM authorized/ licensed Tech Rep who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CT) to do the following, on site:\n\n• Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system.\n\n• Assist with proper repair methods and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.\n\n• Tech Rep must be present in all aspects of this work item.\n\n• Ride the ship during sea trials (8 hours)\n\n3.1.2.2 Ensure the Tech Rep has a résumé of demonstrated experience with the system/equipment stated above.\n\n3.1.2.3 Submit a copy of the Tech Rep’s résumé and a list of references to the COR with the bid proposal.\n\n3.1.2.4 Point of contact:\n\n• Heath Munger or Gary Berglund\n\n• Heath.munger@alliedsystems.com, Gary.Berglund@AlliedSystems.com\n\n• Allied Systems Company\n\n• (503) 825-3366\n\n3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).\n\n3.1.3.1 Protective measures - hydraulic system. The Contractor must maintain existing hydraulic system cleanliness; take all necessary precautions to prevent the introduction of contaminants into the hydraulic system. Whenever disconnecting or removing components from the hydraulic system, completely seal all openings to the rest of the system, immediately, using either caps (for externally threaded connection points), bolt-on blanks, or taped-on discs/covers (sheet-metal no less than 1/16-inch thick).\n\n3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below listed:\n\n• Piping\n\n• Electrical Cables\n\n3.1.5 Reference documents. The Contractor must refer to the drawings and Tech Pubs referenced in Section 2 for guidance in accomplishing this work item.\n\nNOTE\n\nCoast Guard personnel will operate all shipboard machinery and equipment.\n\n3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.\n\n3.3 Split/Individual Constant Tension (CT). The Contractor must follow Tech Rep direction and requirements listed in referenced documents to modify the Allied System Dual Point Davit (DPD) for Split/Individual Constant Tension (CT) capability.\n\n3.4 Install Camera kit. The Contractor must follow Tech Rep direction and requirements listed in referenced documents, to install camera system to enable operators to view machinery space without the need to remove side panels.\n\n3.5 Winch tensioner. The Contractor must renew the Aft winch tensioner and drum.\n\n3.6 Sea trial. The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP. Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR.\n\n3.7 Touch-up preservation. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310. Abide by all touch-up requirements outlined in SFLC Std Spec 6310.\n\n4. NOTES\n\nThis section is not applicable to this work item.\n\n58300_RTK_1223_418\n\nDual Point Davit, Biennial Maintenance, Perform\n\n1. SCOPE\n\n1.1 Intent. This work item describes the requirements for the Contractor to perform Biennial Maintenance on Dual Point Davit listed in Table 1.\n\nTABLE 1 – DUAL POINT DAVIT NAMEPLATE DATA\n\ndescription\n\nLOCATION\n\ndavit total gross weight\n\nAllied Systems Dual Point Davit with Control Console\n\nModels: DDP11000CTS & SP2200\n\nWeather Deck, STBD Side, Frame 47\n\n29,000 lbs.\n\n1.2 Government-furnished property.\n\nMTI\n\nITEM DESCRIPTION\n\nNSN/PN\n\nQTY\n\nESTIMATED COST ($/UNIT)\n\nY\n\nCB-OTH Mark IV\n\n(Coast Guard Drawing 26B-CB-IV-801-001)\n\nN/A\n\n1 ea.\n\nN/A\n\nY\n\nHOOK, RELEASE, BOAT DAVIT\n\nModel APR-356-CBH, NSN 4030-01-467-1005\n\n2 ea.\n\n5000.00\n\n2. REFERENCES\n\nCoast Guard Drawings\n\nCoast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements\n\nCoast Guard Drawing 418A-WMSL-801-001 Rev A, Booklet of General Plan\n\nCoast Guard Publications\n\nCoast Guard Technical Publication (TP) 9618, SWBS 583, Sept 2023, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2328-753, 2329-751, 2332-750)\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000),2022, General Requirements\n\nSurface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems\n\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures\n\nOther References\n\nInternational Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011\n\nInternational Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition\n\nANSI/EASA Standard AR100-2020, Recommended Practice for the Repair of Rotating Electrical Apparatus\n\n3. REQUIREMENTS\n\n3.1 General.\n\n3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):\n\n• 3.2 Biannual maintenance inspection and repair task particulars (Task #1 and #2)\n\n• 3.2.1 Hook certification.\n\n3.1.2 Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CTS) to accomplish the following on site:\n\n• Advise on manufacturer's proprietary system information.\n\n• Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, repair, reassembly, and testing as applicable.\n\n3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their résumé.\n\n3.1.2.2 Submit a copy of the Tech Rep’s résumé and a list of references to the COR with the bid proposal.\n\n3.1.2.3 Point of contact:\n\n• Heath Munger or Gary Berglund\n\n• Heath.munger@alliedsystems.com, Gary.Berglund@AlliedSystems.com\n\n• Allied Systems Company\n\n• (503) 825-3366\n\n3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).\n\n3.1.3.1 Protection of fine surfaces. The Contractor must protect all fine surfaces in accordance with SFLC Std. Spec 5000.\n\n3.1.3.2 Hydraulic system contamination protection. The Contractor must maintain existing hydraulic cleanliness in accordance with SFLC Std. Spec 5000.\n\n3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:\n\n• Piping\n\n• Electrical Cables\n\n• Capstan\n\n• Inspection Covers\n\nNOTE\n\nCoast Guard personnel will operate all shipboard machinery and equipment.\n\n3.1.5 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.\n\n3.1.6 Materials. The Contractor must furnish and install parts listed in Table 2.\n\nTABLE 2 – LIST OF PARTS\n\nQUANTITY\n\nPART NUMBER\n\nDESCRIPTION\n\nSOURCE OF SUPPLY\n\n1\n\n593533\n\nKit, Element Replacement\n\nAllied System Co.\n\n214 S.W. Oregon Street, Sherwood OR 97140\n\n1\n\n593532\n\nKit, Element Replacement\n\n2\n\n70196\n\nReturn Filters\n\n2\n\n74130\n\nSeal Kits\n\n2\n\n71975\n\nFilter Breather\n\n1\n\n71754\n\nTank Cover Gasket\n\n2\n\n71042\n\nWire Rope\n\n2\n\n73441\n\nHub\n\n3.2 Biannual maintenance inspection and repair task particulars. The Contractor with Tech Rep support must perform the tasks designated in Table 3 below and Figure 1 in accordance with SFLC Std Spec 5000 and CG Tech Pub as applicable.\n\nTABLE 3 – Recurring Maintenance task\n\nADDITION REQUIREMENTS\n\n#\n\nTASK TYPE\n\nQTY\n\nCOMPONENT OR ASSEMBLY\n\nAPPENDIX AND PARA. FROM SFLC STD 5000\n\nOTHER\n\n1\n\nOperate and Inspect\n\n1\n\nDual Point Davit System\n\n3.2.1 (Operate and Inspect) Appendix A (General Inspection Requirements)\n\nSubmit CIR.\n\n2\n\nHydraulic Lube Oil Analysis\n\n1\n\nHydraulic System\n\nC2.1.3.1\n\nSubmit a CIR.\n\n3\n\nService and Inspect\n\n1\n\nHydraulic Winch Assembly (Constant Tension and Normal) which are powered by Main Hydraulic Pump/Motor Assembly (ST1) and Back Up powered by Emergency (ST2), Accumulators.\n\n3.2.2 (Service and Inspect) D2.3 (Brakes and clutches. D2.4 (Open gearing and gear reducers)\n\nSee Paragraph 3.3.1\n\nSubmit CFR.\n\n4\n\nDisassemble and Inspect\n\n2\n\nPower Sheave Assembly\n\n3.2.3 (Disassemble and Inspect)\n\nRenew the hubs\n\nIf hubs are not available, clean, inspect, and reinstall hubs.\n\n5\n\nRenew\n\n2\n\nWire Rope Assembly\n\n(Allied System Part No. 71042)\n\nD2.2 (Wire rope assemblies)\n\nWire rope particulars: Nominal diameter: 5/8 inch\n\nMinimum Breaking Strength: 56,040 lbs.\n\nTotal length of each wire rope required: 110 ft.\n\nEnd fitting type: Fiege. Submit a CFR.\n\n6\n\nService and Inspect\n\n1\n\nControl Panel\n\n3.2.2 (Service and Inspect)\n\nVerify all mechanical and electrical signals to the control panel. Submit a CFR.\n\n7\n\nNDE\n\n1\n\nDual Point Davit System\n\n3.2.5 (NDE)\n\nAreas to NDE: all weld joints and boom and turret structures.\n\nSubmit a CFR.\n\n8\n\nGroom and Lubricate\n\n1\n\nDual Point Davit System\n\n3.2.6 (Groom and Lubricate)\n\n9\n\nWeight Test\n\n1\n\nDual Point Davit System\n\nB2.7.2 (Dual Point Davits)\n\nB2.7.2.1 No-load Operational Test\n\nB2.7.2.2 Static Load Test\n\nB2.7.2.3 Winch/Brake/Modified static load Test\n\nB2.7.2.4 Dynamic Load Test\n\nB2.7.2.5 Rated Load test\n\nTest weight particulars:\n\nWorking Load Limit (11,000 lb.).\n\n\"Modified static / brake\" test load: 16,500 pounds (150% of WLL)\n\n“Modified Dynamic Test Load: 12,650 pounds (115% of WLL)\n\n10\n\nElectric Motors\n\n1\n\nNormal RIHB Boat Davit and Emergency RIHB Davit HPU Motors\n\nPerform Insulation Resistance Test in accordance with ANSI/EASA AR 100-2020.and Para 6.5.4.3 of TP 9618. Submit a CFR.\n\n11\n\nFabricate and Install\n\n1\n\nLabel plate\n\nB2.9 (Label Plates)\n\n12\n\nPartially Preserve\n\n1\n\nDual Point Davit Assembly (including pedestal, foundation, and all previously/normally painted components or surfaces)\n\n3.2.4 (Partial Preservation)\n\n3.2.1 Hook certification. The Contractor with Tech Rep support must inspect the hooks and verify their certification. Submit a CIR. Hooks (i.e. P/N: Model APR-356-CBH) must be renewed at every 48 months with GFP. Renew hooks if certification is expired.\n\n3.2.1.1 Mandatory Turn-in Item (MTI) removal. If required to be renewed, the Contractor must remove the existing MTI hooks and turn over to the COR.\n\n3.3 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table 4 below, the Contractor must perform work in accordance with the corresponding Appendix or paragraph of SFLC Std Spec 5000.\n\nTABLE 4 - SPECIAL REQUIREMENTS\n\nComponent\n\nAppendix & Paragraph in sflc std spec 5000\n\nFluids\n\nC2.1\n\nHose assemblies\n\nC2.2\n\nPiping and tubing\n\nC2.3\n\nValves and manifolds\n\nC2.4\n\nGages\n\nC2.5\n\nGas charged accumulators\n\nC2.6\n\nHeat exchangers and fluid coolers\n\nC2.7\n\nSystems\n\nC2.8\n\nFastener assemblies\n\nD2.1\n\nWire rope assemblies\n\nD2.2\n\nBrakes and clutches\n\nD2.3\n\nOpen gearing and gear reducers\n\nD2.4\n\nNOTE\n\nCoast Guard personnel will operate all shipboard machinery and equipment.\n\n3.3.1 Perform adjustment and calibration IAW Tech Pub 9618 for Main System Relief Pressure, Counterbalance Valves, Anti-2-block Assembly, Constant Tension Winch Pressure Adjustments.\n\n3.4 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.\n\n3.4.1 The Contractor with Tech Rep support must perform a dockside test, consisting of launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Submit a CFR.\n\n3.5 Touch-up preservation. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310. Abide by all touch-up requirements outlined in SFLC Std Spec 6310.\n\nNOTE\n\nGovernment will provide 72 Hours of advance notice to the Contractor for sea trial support by the Tech Rep.\n\n3.6 Sea trial. The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP. Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR.\n\n4. NOTES\n\nFIGURE 1: DUAL POINT DAVIT MAINTENANCE TABLE\n\nFIGURE 1: DUAL POINT DAVIT MAINTENANCE TABLE","origin":"detail"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"70Z08525Q0002514","place_of_performance":{"zip":"94501","state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"J020"},{"dates":{"posted":"2025-02-27","posted_at":"2025-02-27T22:09:27.327Z","created_at":"2025-02-27T21:38:43.809Z","modified_at":"2025-03-22T03:55:45.478Z","response_deadline":{"raw":"2025-03-06T08:00:00-08:00","utc":"2025-03-06T16:00:00Z","date":"2025-03-06","time":"08:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/af6c6ef1ef55453eb175711d32805e11/view"},"naics":{"codes":["336611"],"primary":"336611"},"title":"USCGC Waesche Dual Point Davit Modify","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_id":"100187922","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-03-21","archive_type":"auto15"},"history":[{"index":3,"title":"USCGC Waesche Dual Point Davit Modify","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-27T22:09:27.327Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"af6c6ef1ef55453eb175711d32805e11","solicitation_number":"70Z08525Q0002514"}],"contacts":[{"name":"KYLER FISK","role":"primary","email":"KYLER.C.FISK@USCG.MIL","phone":"9492881271"},{"name":"ULISES BALMACEDA","role":"secondary","email":"Ulises.O.Balmaceda@uscg.mil","phone":"5104375438"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"af6c6ef1ef55453eb175711d32805e11","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"af6c6ef1ef55453eb175711d32805e11","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-21T12:03:47.965469533Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"70d7f14bb6b7e93876969dc93a78458a7a802a156526bd169e5e878216af9324","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-21T12:03:47.965469533Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong>1. SCOPE</strong>  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.  &nbsp;</p>\n\n<p> &nbsp;<br />\n<strong>2. REFERENCES</strong>  &nbsp;</p>\n\n<p> &nbsp;<br />\n<strong>COAST GUARD DRAWINGS</strong>  &nbsp;</p>\n\n<p> &nbsp;<br />\nNone.  &nbsp;</p>\n\n<p> &nbsp;<br />\n<strong>COAST GUARD PUBLICATIONS</strong>  &nbsp;</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p><strong>OTHER REFERENCES</strong>  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>None.&nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p><strong>3. REQUIREMENTS</strong>  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p></p>\n\n<p>3.2 <u>Period of Performance</u>. The period of performance for this work is 24MAR2025-02MAY2025, to include sea trials on 01JUL25 &nbsp;&nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>3.3 <u>Location</u>. The Contractor must perform the work while the USCGC WAESCHE is alongside the pier at U.S. Coast Guard Base Alameda, Coast Guard Island, Alameda CA 94501.</p>\n\n<p></p>\n\n<p>POP:&nbsp;24MAR2025-02MAY2025,</p>\n\n<p>Please see attached SOW for more indetail information.</p>","text":"1. SCOPE\n\n1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.\n\n2. REFERENCES\n\nCOAST GUARD DRAWINGS\n\nNone.\n\nCOAST GUARD PUBLICATIONS\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nOTHER REFERENCES\n\nNone.\n\n3. REQUIREMENTS\n\n3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.\n\n3.2 Period of Performance. The period of performance for this work is 24MAR2025-02MAY2025, to include sea trials on 01JUL25\n\n3.3 Location. The Contractor must perform the work while the USCGC WAESCHE is alongside the pier at U.S. Coast Guard Base Alameda, Coast Guard Island, Alameda CA 94501.\n\nPOP: 24MAR2025-02MAY2025,\n\nPlease see attached SOW for more indetail information.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"70Z08525Q0002514","place_of_performance":{"zip":"94501","city":{"code":"562","name":"Alameda"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"J020"}],"due_at":"2025-03-06T16:00:00Z","due_date":"2025-03-06","closes_at":"2025-03-06T16:00:00Z","awardable":true,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","state":"CA","county":"06001","county_name":"Alameda County","city":"0600562","city_name":"Alameda","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-21T12:36:37.408672Z","principal_notice_id":"af6c6ef1ef55453eb175711d32805e11","description":{"text":"1. SCOPE\n\n1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.\n\n2. REFERENCES\n\nCOAST GUARD DRAWINGS\n\nNone.\n\nCOAST GUARD PUBLICATIONS\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements\n\nOTHER REFERENCES\n\nNone.\n\n3. REQUIREMENTS\n\n3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.\n\n3.2 Period of Performance. The period of performance for this work is 24MAR2025-02MAY2025, to include sea trials on 01JUL25\n\n3.3 Location. The Contractor must perform the work while the USCGC WAESCHE is alongside the pier at U.S. Coast Guard Base Alameda, Coast Guard Island, Alameda CA 94501.\n\nPOP: 24MAR2025-02MAY2025,\n\nPlease see attached SOW for more indetail information.","html":"<p><strong>1. SCOPE</strong>  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.  &nbsp;</p>\n\n<p> &nbsp;<br />\n<strong>2. REFERENCES</strong>  &nbsp;</p>\n\n<p> &nbsp;<br />\n<strong>COAST GUARD DRAWINGS</strong>  &nbsp;</p>\n\n<p> &nbsp;<br />\nNone.  &nbsp;</p>\n\n<p> &nbsp;<br />\n<strong>COAST GUARD PUBLICATIONS</strong>  &nbsp;</p>\n\n<p>Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p><strong>OTHER REFERENCES</strong>  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>None.&nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p><strong>3. REQUIREMENTS</strong>  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.  &nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p></p>\n\n<p>3.2 <u>Period of Performance</u>. The period of performance for this work is 24MAR2025-02MAY2025, to include sea trials on 01JUL25 &nbsp;&nbsp;</p>\n\n<p> &nbsp;</p>\n\n<p>3.3 <u>Location</u>. The Contractor must perform the work while the USCGC WAESCHE is alongside the pier at U.S. Coast Guard Base Alameda, Coast Guard Island, Alameda CA 94501.</p>\n\n<p></p>\n\n<p>POP:&nbsp;24MAR2025-02MAY2025,</p>\n\n<p>Please see attached SOW for more indetail information.</p>","origin":"detail"},"contacts":[{"name":"KYLER FISK","role":"primary","email":"KYLER.C.FISK@USCG.MIL","phone":"9492881271"},{"name":"ULISES BALMACEDA","role":"secondary","email":"Ulises.O.Balmaceda@uscg.mil","phone":"5104375438"}],"place_of_performance":{"zip":"94501","city":{"code":"562","name":"Alameda"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"naics_codes":["336611"],"award":null,"attachments":[{"resource_id":"4b18787ce81149bca1dc09cf11adf68a","name":"SOWDualPntDavitTCTOCTModifyBnnlMntD01.docx","kind":"file","mime_type":".docx","size_bytes":695240,"posted_at":"2025-02-07T22:45:23.225Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4b18787ce81149bca1dc09cf11adf68a/download","mirrored":false},{"resource_id":"16a320983c1148db90c8f31af3bea8bd","name":"SOW_58300_DlPntDvtBnnllMntPrfrm_418.docx","kind":"file","mime_type":".docx","size_bytes":701774,"posted_at":"2025-02-27T22:09:27.327Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/16a320983c1148db90c8f31af3bea8bd/download","mirrored":false}],"awards":[],"related":[{"key":"70Z08526RRJ001B00","latest_notice_id":"79adb3e9f10f4bceafdeca530cb99fdf","title":"TRS-3D /AN/SPS-75 Radar repairs/ overhaul services","solicitation_number":"70Z08526RRJ001B00","notice_type":"o","first_type":"o","first_posted":"2026-07-15","last_posted":"2026-11-19","notices":8,"due_at":"2026-12-01T17:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"811210","psc":"J059","set_aside":null,"state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"70Z08526Q39002B00","latest_notice_id":"c2c828ffaf9848a1a975736420ad55cf","title":"ACTUATOR,GOVERNOR","solicitation_number":"70Z08526Q39002B00","notice_type":"o","first_type":"o","first_posted":"2025-12-10","last_posted":"2025-12-10","notices":1,"due_at":"2026-12-19T16:00:00Z","due_date":"2026-12-19","closes_at":"2026-12-19T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"336611","psc":"2990","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 2990)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"}],"similar_open":[{"key":"70ZU0327QSBPL0001","latest_notice_id":"86223c5b494f4fd48dd67b18168a18c0","title":"USCG STA SAN FRANCISCO (45667) FY27 DD REPAIRS","solicitation_number":"70ZU0327QSBPL0001","notice_type":"k","first_type":"k","first_posted":"2026-11-02","last_posted":"2026-11-02","notices":1,"due_at":"2026-12-02T19:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70ZU03","office_name":"CG-SEA-C23","naics":"336611","psc":"J999","set_aside":"SBA","state":"CA","county":"06075","county_name":"San Francisco County","city":"0667000","city_name":"San Francisco","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-03T04:52:39.433634Z"},{"key":"70Z08527QLREP0001","latest_notice_id":"a152115a32dd4be7be92f00a0e46c083","title":"Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair","solicitation_number":"70Z08527QLREP0001","notice_type":"k","first_type":"k","first_posted":"2026-11-12","last_posted":"2026-11-24","notices":3,"due_at":"2026-12-07T20:30:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70ZU02","office_name":"CG-SEA-C22","naics":"336611","psc":"J999","set_aside":"SBA","state":"CA","county":"06001","county_name":"Alameda County","city":"0600562","city_name":"Alameda","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"N6264927RK003","latest_notice_id":"a5ed6a1c385f485792cc56d46933645f","title":"USNS CITY OF BISMARCK (T-EPF 9) VRA KR","solicitation_number":"N6264927RK003","notice_type":"o","first_type":"o","first_posted":"2026-11-20","last_posted":"2026-11-24","notices":2,"due_at":"2026-11-27T01:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62649","office_name":"NAVSUP FLT LOG CTR YOKOSUKA","naics":"336611","psc":"J999","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"KOR","place_scope":"overseas","state_source":null,"state_evidence":"KOREA, SOUTH","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open_total":107,"indexable":false}