Combined synopsis and solicitation, total small business set-aside, first published as presolicitation
USCGC MIDGETT (WMSL 757) Drydock Repairs –Honolulu, HI
70Z08524PLREP0007
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Awarded
$18,524,224.09 obligated so far on USAspending
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one was awarded in 2024
104 like it are open now in ship building and repairing
- USCGC HICKORY (WLB-212) DRYDOCK REPAIR FY27
US Coast Guard, Cg-Sea-C22
Sources soughtNAICS 336611Hawaii70Z08527RIBCT270001087Closes in 12 daysDec 7 - Ship's Service Turbine Generators (SSTGs) No. 1 and No. 2
Department of the Navy, Pearl Harbor Naval Shipyard Imf
SolicitationNAICS 336611HawaiiN32253-26-Q-0043Closes in 13 daysDec 8 - BOAT DAVIT OEM SERVICE
Department of the Navy, NAVSUP FLT Log CTR Puget Sound
SolicitationNAICS 336611Outside the USN0040627Q0039Due todayNov 25
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 37 days from the day the solicitation was posted, April 10, 2024, to the deadline. The deadline moved 2 times: it was first April 15, 2024 and ended as May 17, 2024.
- Before the solicitation
- The agency published a presolicitation on March 28, 2024, 13 days before the solicitation.
- How it ended
- Awarded to Blanchard Machinery Company on July 23, 2024, 67 days after offers were due. Reported as full and open competition after exclusion of sources.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Details for this solicitation are contained in the attached solicitation document.
Amendment 0001- update to 100% Small Business Set Aside, Clarify Period of Performance as 21 Aug 2024 - 19 Nov 2024. Responses to this solicitation are due by 10 May 2024, 16:00 Hawiian Time.
Amendment 0002- Clarify that the location is restricted to a 50 mile radius from the Cutter's homeport. Update pricing sheet to correct Work Item Numbering.
Amendment 0003 - Resolve the following questions: Please provide the location of all of the 294 zinc anodes listed in the first row of Table 1. The location provided is "Various Location on Hull". Based on the references provided, it appears that some of the zincs may be located in tanks. If tank access is required, please provide the following information:
a. List of tanks that will need to be accessed.
b. Requirements for accessing tanks (e.g. do all gaskets and hardware need to be replaced for each tank access cover?) c. Contents of each tank (type of fluid and qty of fluid for KTR to dispose) d. Stability concerns relative to docking condition? Can the tanks be pumped to low suction prior to docking, or will they need to be pumped to low suction in dock? Please refer to Rev-1 specification for changes. Table 1 has been updated to address zinc locations per drawing 750-WMSL-633-500. Drawings 750-WMSL-167-001 and 750-WMSL-501-004 have been added to address tank locations, access, and tank contents. Will work with ship to have affected tanks pumped down to low suction prior to docking.
Revision 1 of the Specification file is attached. Additionally, the comment “FORESEEABLE COST FACTORS PERTAINING TO DIFFERENT SHIPYARD LOCATIONS” remains in this solicitation.
Amendment 0004 - Resolve the following question: USCG known service provider notes that ASNT Lvl. III analyst requirement is for the wrong 3D scanning industry. ASNT is used for 3D SIDESCANs and not 3D Hull scans. Please clarify or delete this requirement. - ANST Level III is not required. Please see Revision 2 Specification for details. (Spec Rev 2 is attached)
Amendment 0005 - answers multiple questions (details on Amendment file), specification file updated and moves out the respond by date to 17 May 2024
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Pacific Shipyards International, LLC
- UEI
- K84MXRVQ8BW5
- CAGE
- 1U7K1
- Vendor location
- Honolulu, HI
- Contract
- 70Z08524FLREP0077 under 70Z08524DLREP0010, delivery order
- Obligated
- $18,524,224.09
- Actions
- 7 between July 23, 2024 and May 22, 2025
- Competition
- Full and Open Competition After Exclusion of Sources
- Described as
- This Is the Delivery Order Associated with the Contract for Ship Repair, 70z08524dlrep0010. the Drydock Repairs to the CGC Midgett Will Be Performed by Pacific Shipyards at Their Facility.
- Match
- solicitation number 70Z08524PLREP0007 equals the FPDS solicitation identifier; same awarding office 70Z085 (high confidence)
- Record
- USAspending award page
- Recipient
- Blanchard Machinery Company
- UEI
- JGCCMF3JJGB6
- CAGE
- 9V663
- Vendor location
- West Columbia, SC
- Contract
- 70Z08524PLREP0007, purchase order
- Obligated
- $8,038.15, current value $35,038
- Actions
- 1 between February 7, 2024 and February 7, 2024
- Competition
- Competed Under SAP, 3 offers received
- Set-aside reported
- No Set Aside Used.
- Described as
- Ham Load Bank
- Match
- solicitation number 70Z08524PLREP0007 equals the FPDS solicitation identifier; same awarding office 70Z085 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 28, 2024
Presolicitation
USCGC MIDGETT (WMSL 757) Drydock Repairs-Honolulu, HI
Due April 15, 2024 at 8:00 PM EDT. SAM.gov, notice 1d2234ed32f949c88684f4baeab7f4a7
April 2, 2024
Presolicitation
USCGC MIDGETT (WMSL 757) Drydock Repairs-Honolulu, HI
Due April 15, 2024 at 8:00 PM EDT. SAM.gov, notice 22d61b4a3111496faeda2795d7ae1bbb
April 10, 2024
Combined synopsis and solicitation
Due May 10, 2024 at 10:00 PM EDT. SAM.gov, notice e791ee2f940345d2bf1a0b08508a64a7
April 11, 2024
Combined synopsis and solicitation
Due May 10, 2024 at 10:00 PM EDT. SAM.gov, notice e0a01f7d240b4ad9b04cc12d1c19256c
April 12, 2024
Combined synopsis and solicitation
Due May 10, 2024 at 10:00 PM EDT. SAM.gov, notice 583c3ae3c4184175bb3949393767151e
April 26, 2024
Combined synopsis and solicitation
Due May 10, 2024 at 10:00 PM EDT. SAM.gov, notice c811e4e6e21e4308a056d84496b3eadf
May 1, 2024
Combined synopsis and solicitation
Due May 10, 2024 at 10:00 PM EDT. SAM.gov, notice 2a1a2b90a1c74214b08c8112cc4f451d
May 8, 2024
Combined synopsis and solicitation
Due May 17, 2024 at 10:00 PM EDT. SAM.gov, notice 785764aaec1f48e5a1f845f87ca1e5b7
Points of contact
- William Zittlewilliam.r.zittle@uscg.mil4107626485
- Kiya Plummer-Dantzlerkiya.R.Plummer-Dantzler@uscg.mil5105015550