Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,711 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, total small business set-aside

USCGC MUNRO FUEL OIL PIPING

70Z08524P05011

US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.

Response deadline

May 31, 2024 at 11:00 AM EDT

Closed 909 days ago. Posted May 17, 2024. Scheduled to archive May 31, 2024.

Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities

This one closed in 2024

107 like it are open now in ship building and repairing

All 107 open in ship building and repairing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 14 days from the day the solicitation was posted, May 17, 2024, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

This is a combined synopsis/solicitation for commercial items/services prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued.

This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-65 dated January 29, 2013. The NAICS Code is 336611. The small business size standard is 1250. This is a total small business set aside. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. The United States Coast Guard Surface Force Logistics Center has a requirement for the following:

The CTR shall provide:

1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to renew piping sections in the fuel oil transfer and fuel oil stripping systems listed in Table 1. 1.2 Government-furnished property. None.

2. REFERENCES COAST GUARD DRAWINGS Coast Guard Drawing 418A-WSML-540-001, Rev C, Fuel Oil Diagram COAST GUARD PUBLICATIONS Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures OTHER REFERENCES None.

3. REQUIREMENTS 3.1 General. 3.1.1 CIR. None. 2 (Rev-0) 3.1.2 Tech Rep. The Contractor must provide the services of qualified and certified Tech Reps and personnel as follows:

• NDE Tech Rep: NDE Inspector/Level 2 3.1.2.1 NDE Tech Rep. The Contractor must provide the services of a qualified and certified NDE Inspector as follows:

• Perform welding NDE inspections. 3.1.2.1.1 Qualifications/certifications. NDE Inspector/Level 2 certified and qualified in accordance with ASNT No. SNT-TC-1A. Submit the Tech Rep’s qualifications/certifications to the COR at the Arrival Conference. 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

• Oil in bilges around fuel manifolds (gas free certification required for hot work) • Deck plating • Miscellaneous piping • Flange spray shields • Fuel transfer manifold • Fuel Oil Tanks (5-76-1-F, 5-76-2-F, 5-80-0-F) 3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

3.3 Fluid handling. The Contractor must remove up to 500 gallons of diesel fuel from the affected piping system and tanks. Stow all fluids in suitable stowage facility immediately after removal, and re-stow all tank contents, upon completion of work. 3.4 Piping isolation. The Contractor must disconnect flange connections and install blanks (with gaskets) as required to isolate the fuel oil transfer piping.

The Contractor must isolate and clean the affected fuel oil transfer piping to perform gas freeing and hot work. Remove blanks, reconnect flanges, and renew any disturbed gaskets upon completion piping renewal. Gasket material used in final assembly must conform to those specified in CG Drawing 418A-WSML-540-001. 3.5 Bilge cleaning. The Contractor must clean bilge areas to allow for gas free certification and hot work in the area. 3.6 Fuel oil transfer piping renewal.

The Contractor must renew the leaking sections of fuel oil transfer and fuel oil stripping piping described in Table 1. Piping arrangement and material details are provided in Coast Guard Drawing 418A-WMSL-540-001. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3 (Rev-0) TABLE 1 – LIST OF F/O PIPING LOCATION / PIPING LINEAR FEET (LF) DIAMETER (in) DRAWING NOTES FMMR (5-44-01-E) F/O Stripping Piping 10 LF 4 in 418A-WMSL-540-001 Sheet 17A Piping section is port side lower level FMMR.

FMMR (5-44-01-E) F/O Transfer Piping to 5-76-1-F 10 LF 5 in 418A-WMSL-540-001 Sheet 6B (FMMR Inner Bottom) Piping section can be isolated by spectacle flange in AMMR and FT-V-4-48-16 AMMR (5-52-01-E) F/O Transfer Piping to 5-76-1-F 10 LF 5 in 418A-WMSL-540-001 Sheet 7B (AMMR 2ND Platform) Piping section can be isolated by spectacle flange in AMMR and FT-V-4-48-16 AMMR (5-52-01-E) F/O Transfer Piping to 5-76-2-F 2 LF 5 in 418A-WMSL-540-001 Sheet 7B (AMMR 2ND Platform) Piping section can be isolated by bolted valve FT-V-4-68-4 in Port Shaft Alley and FT-V-4-48- 12 in FMMR AMMR (5-52-01-E) F/O Transfer Piping to 5-80-0-F 2 LF 5 in 418A-WMSL-540-001 Sheet 7B (AMMR 2ND Platform) Piping section can be isolated by bolted valve FT-V-4-69-2 in Port Shaft Alley and FT-V-4-48-20 in FMMR 3.6.1 Welding requirements.

The Contractor must perform all welding and allied processes in accordance with SFLC Std Spec 0740. 3.6.1.1 The contactor must provide the personnel and equipment for the fire watch. 3.6.2 Nondestructive examination (NDE). The Contractor must, in the presence of the Coast Guard Inspector, perform a visual inspection and dye penetrant inspection of all new welds in accordance with SFLC Std Spec 0740, Appendix C. Submit a CFR. 3.7 Hydrostatic test.

After all authorized repairs, the Contractor must hydrostatically test all new and disturbed piping and components of the Fuel Oil Stripping and Transfer system in accordance with SFLC Std Spec 0740, Appendix C, Hydrostatic Test. Ensure zero leakage from or permanent deformation of pressure-containing parts by repairing all leaks, deformations, and discrepancies. Submit a CFR. 3.8 Operational test, post repairs.

After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 4 (Rev-0) 3.9 Touch-up preservation.

The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, (Touch-ups and minor coating repairs.) 4. NOTES This section is not applicable to this work item RDD/POP: 19Jun24-15Aug24

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 17, 2024

    Combined synopsis and solicitation

    Due May 31, 2024 at 11:00 AM EDT. SAM.gov, notice 5057741632804baab158edf7dece700d

Points of contact